Text
CATPQORY
2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9604160008
DOC.DATE: 96/04/09
NOTARIZED:
NO
DOCKET
ACIL:'i0-387 Susquehanna
Steam Electric Station,
Unit 1, Pennsylva
05000387
50-388
Susquehanna
'Steam Electric Station,
Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
PASCIAK,W.J.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
& Light Co.
SUBJECT:
Forwards
insp repts
50-387/96-01
& 50-388/96-01
on 960206-
0318
& NOV.
DISTRISOTION CODE:
IEOID
COPIES
RECEIVED: DTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi lation
R sponse
I
NOTES:
05000387
E
INTERNAL:
RECIPIENT
D CODE/NAME
PD1-2
LE CENTE
/DRC
HHFB
NRR/DRPM/PERB
OE DIR
RGN1
FILE
01
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNY,C
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
Y
EXTERNAL: LITCO BRYCEEJ
H
NRC
NOTES:
1
1
1
1
1
1
NOAC
1
1
D
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK/
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCI
20
April 9,
1996
Nr. Robert
G.
Byram
Senior Vice President - Nuclear
Power
& Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
- NRC COMBINED INSPECTION
REPORT
NOS. 50-387/96-01;
50-388/96-01
Dear Nr. Byram:
On March 18,
1996,
the
NRC completed
an inspection at your Susquehanna
Steam
Electric Station
(SSES),
Salem Township,
The enclosed report
presents
the results of that inspection.
During the six week period covered
by the inspection period,
conduct of
activities at the Susquehanna
facilities was generally characterized
by safety
conscious
operation
and maintenance
practices.
The licensed operator
requalification examinations effectively evaluated
operator ability to safely
operate
the plant and operators
were held to high standards
of performance.
The Inprocess
Corrected
Errors trending
by guality Control personnel
was
considered
a good initiative.
A violation of NRC requirements
was identified, involving a secondary
containment isolation damper that did not fully close during
a technical
specification required surveillance test.
The operators
failed to promptly
identify the degraded
damper condition
and take appropriate
action.
Work
records
show that indication of the degraded
was first observed
four
months earlier;
however,
operators failed to recognize its significance or
engage
the corrective action process.
This violation is cited in the enclosed
Notice of Violation, and the
circumstances
surrounding
the violation are described
in detail in the
enclosed report.
Please
note that you are required to respond to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your response,
in part, to
determine whether further enforcement
action is necessary
to ensure
compliance
with regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
I50070
9604160008
960409
ADOCK 05000387
G
//qadi
i
Hr. Robert
G.
Byram
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Docket Nos. 50-387;50-388
Walter J.
Pasci ak, Chief
Reactor Projects
Branch
4
Division of Reactor Projects
Enclosures:
1.
2.
Notice of Deviation
3.
Combined,
NRC Inspection
Report 50-387/96-01;
50-388/96-01
Hr. Robert
G.
Byram
cc w/encl:
H.
G. Stanley,
Vice President - Nuclear Operations
J.
H. Kenny, Nuclear Licensing
G. T. Jones,
Vice President - Nuclear Engineering
G. Kuczynski, Plant Manager
H.
M. Urioste,
Nuclear Services
Manager,
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Assessment
Services
H.
D. Woodeshick,
Special Office of the President
R.
R. Wehry, Nuclear Licensing
J.
C. Tilton, III, Al,.legheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
Mr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO
NRC Resident
Inspector
PUBLIC
Distribution w/encl:
(Via f-Mail)
W. Dean,
OEDO
C. Poslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Program
Branch,
NRR (IPAS)
DOCUMENT NAME:
a:9601. sus
To receive a copy of this document, indicate in the box: 'C
= Co y without attachmen%nclosure
'E'
Copy with
attachment/enclosure
"N'
No copy
OFFICE
RI: DRP
NAME
RUrban
DATE
4/
/96
RI: DRP,
WPascia
4/ /96
OF ICIAL RECORD
COPY