See also: IR 05000387/1995024
Text
CATFQORY 2
n
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9601290357
DOC.DATE: 96/01/23
NOTARIZED: NO
DOCKET ¹
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
PASCIAK,W.J.
Region
1 (Post
820201)
RECIPE
NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
& Light Co.
SUBJECT:
Forwards insp repts
50-387/95-24
a 50-388/95-24
on
951102-1218.No violations noted. Installation of temporary,
non-safety related test
equipment
on safety related
sys
componentts
w/o
SE of NRC concern.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR g ENCL g
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
E
NOTES:
05000387 g
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
EXTERNAL: LITCO BRYCEPJ
H
NRC PDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNY,C
AEOD/DEIB
AE
C
LE CE
BENBEE!
N
DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN1
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
U
M
E
N
NOTE TO ALL "RIDS" RECIPIENTS
PLEASE HELP US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21
ENCL
21
January
23,
1996
Mr. Robert
G.
Byram
Senior Vice President
Nuclear
Power
& Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC
COMBINED INSPECTION
REPORT NOS. 50-387/95-24;
50-388/95-24
Dear Hr. Byram:
The enclosed
report transmits
the findings of a resident
inspection
conducted
by Ms. H. Banerjee
and Hr.
B. J.
HcDermott, at Susquehanna
Steam Electric
Station
(SSES)
from November 2,
1995 through
December
18,
1995.
At the con-
clusion of the inspection,
the preliminary findings were discussed
with Hr.
G.
J. Kuczynski
and other members of your staff.
Installation of temporary,
non-safety related test equipment
on safety related
system
components
without
a safety evaluation is
a concern.
Although,
historically your practice of installing strip chart recorders
on the
emergency diesel
generator
panels
during testing
has
been trouble free,
the
need for such
an evaluation still remains in light of potential failure modes
and impact of such test equipment
on safety related
systems.
Additionally,
effective procedural
controls for installing and removing the strip chart
recorders
were not implemented.
This item is left unresolved
pending
completion of your review.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Malter J.
Pasciak,
Chief
Reactor Projects
Branch
4
Division of Reactor Projects
Docket Nos. 50-387;50-388
Enclosures:
1.. Combined
NRC Inspection
Report 50-387/95-24;
50-388/95-24
03S7 960123
9601@9
DOCK OS000387
c
Hr. Robert
G.
Byram
cc w/encl:
H.
G. Stanley,
Vice President
Nuclear Operations
J.
M. Kenny, Nuclear Licensing
G. T. Jones,
Vice President - Nuclear Engineering
H. H. Urioste, Nuclear Services
Manager,
C.
D. Lopes,
Manager - Nuclear Security
W. Burchill, Manager,
Assessment
Services
H.
D. Woodeshick,
Special Office of the President
R.
R. Wehry, Nuclear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
Hr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2)
NRC Resident
Inspector
PUBLIC
Distribution w/encl:
(Via E-Hail)
W. Dean,
OEDO
C.'oslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Program Branch,
NRR (IPAS)
DOCUHENT NAME:
a:9524.sus
To reecho a copy of this docu
ndicate ln the box: 'C ~ Copy without attachmen%nclosure
'E
Copy with
attachment/enclosure
'N
~ N
y
OFFICE
NAME
DATE
RI: DRP,
AJ
CPoslus
Section 2.4
I '6
$u'~ p/
p$ r
RI: DRP
WP
i
I
96
FFICIAL RECORD
COPY
g~A/
V