ML17158B077

From kanterella
Jump to navigation Jump to search
Informs of Requalification Program Inspplanned for Wk of 960212 Which Coincides w/regulary-scheduled Requalification Exam Cycle.Requests Written Exams & Operating Tests Planned for Wk of Insp 960122 Be Furnished
ML17158B077
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/12/1996
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9601230064
Download: ML17158B077 (2)


Text

January 12, 1996 Mr. Robert G.

Byram Senior Vice President Nuclear Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION SUSQUEHANNA STEAM ELECTRIC STATION, UNIT NOS.

1 AND 2

Dear Mr. Byram:

In a telephone conversation on January 3,

1996, Mr. J.

Caruso and Mr. A. Fitch made arrangements for the NRC to inspect the licensed operator requalification program at the Susquehanna Steam Electric Station, Unit Nos.

1 and 2.

The inspection is planned for the week of February 12, 1996, which coincides with your regularly-scheduled requalification examination cycle.

The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c),

the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs.

In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by January 22, 1996.

Mr. Fitch has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

The request for requalification examination material is covered by the Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires on April 30, 1997.

The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering,

copying, and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management

Branch, Mail Stop T-6, F33, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101),

Office of Information and Regulatory Affairs, NEOB-3019, Washington, D.C.

20503.

9601230064 960ii2 PDR ADQCK 050003871 I

8 PDR

Mr. Robert G.

Byram Thank you for your cooperation in this matter.

If you have any questions regarding this inspection, please contact me at (610) 337-5211 or E-mail address GWMSNRC.GOV.

Sincerely, (original signed by)

Carl Sisco for Docket Nos. 50-387; 50-388 Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety CC:

H.

G. Stanley, Vice President Nuclear Operations J.

M. Kenny, Nuclear Licensing G. T. Jones, Vice President - Nuclear Engineering R.

R. Wehry, Nuclear Licensing M. M. Urioste, Nuclear Services

Manager, General Electric C. D. Lopes, Manager - Nuclear Security W. Burchill, Manager, Assessment Services H. D. Woodeshick, Special Office of the President A. Fitch, Nuclear Operations Training Supervisor B. Stitt, Nuclear Operations Training Supervisor W. Lowthert, Manager, Nuclear Training J.

C. Tilton, III, Allegheny Electric Cooperative, Inc.

Nuclear Safety Information Center (NSIC)

Commonwealth of Pennsylvania Distribution:

'egion I Docket Room (with concurrences)

W. Dean, OEDO C. Poslusny, Project Manager, NRR J. Stolz, PDI-'2, NRR J.

Caruso, DRS V. Curley, DRS NRC Resident Inspector Inspection Program Branch, NRR (IPAS)

PUBLIC DRS Files (2)

DOCUMENT NAME:

A:SUS21296.60R To receive a copy of this document, indicate in the box: 'G" Copy without attachment/enclosure

'E'opy with attachment/enclosure N'o copy OFFICE RI/DRS NAME JCaruso d

DATE Ol/11/96 RI/DRS GMeyer ~

Ol/ g /96 01/

/96 01/

/96 01/

/96 OFFICIAL RECORD COPY J