n 950919
~wL&l<l.2
UDOCS OFFSITE FACILITY
REGULATOR
NFORMATION DISTRIBUTION S
EM (RIDE)
'ACCESSION NBR:9511300015
DOC.DATE: 95/11/21
NOTARIZED:
NO
DOCKET ¹
,; FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
UTH.NAME
AUTHOR AFFILIATION
~ SCIAK,W.J.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
6 Light Co.
SUBJECT:
Forwards
i,nsp repts
50-387/95-22
& 50-388/95-22
o
1101.No violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation
esponse
P
NOTES:
RECIPXENT
ID CODE/NAME
PD1-2
COPIES
ITTR ENCL
1
1
RECIPIENT
ID CODE/NAME
POSLUSNYiC
COPIES
LTTR ENCL
1
1'5000387
R
I
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
P
NAL: LITCO BRYCEiJ H
NRC PDR
NOTES:
2
'
1
1
l.
1
1
1
1
1
1
1
1
1
1
1
1
1,
1
1
AEOD/DEIB
AEOD~C
ILE CE
RR DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN1
FXLE
01
NOAC
1
1
~
1
1
1
1
1
1
1
1
1
1
1.
1
1
1
Y
2
D
0,
C
U
NOTE TO ALL"BIDS"RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCONTROL
DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM
DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21 'NCL
21
t
,
P
November 21,
1995
Mr. Robert',
Byram
Senior Vice President
Nuclear
Power 5 Light Company
2 North Ninth Street
Allentown,
Penns lvania
18101
SUBJECT:
NRC COMBINED INSPECTION
REPORT
NOS. 50-387/95-22;
50-388/95-22
Dear Mr. Byram:
This report transmits
the findings of the safety inspections
conducted
by Ms.
M. Banerjee
and other
NRC inspectors
at Susquehanna
Steam Electric Station
(SSES)
from September
19,
1995 through
November
1,
1995.
At the conclusion of
the inspection,
the findings were discussed
with Mr. H.
G. Stanley
and other
members of your staff.
We are providing one report for the inspections
conducted during this period in order to better integrate
our inspection
findings into a consistent
regulatory message
and more clearly communicate
how
these findings may reflect
a ch'ange
in your performance.
We noted that the Unit 2 refueling operation
was executed
in a careful
and
controlled manner following procedures.
The start-up activities were safely
performed
by knowledgeable
operators,
with excellent communication,
good
management
oversight
and conservative
decision making.
Excellent cooperation
and communications
between the maintenance,
operations,
site
and corporate
engineering
personnel
resulted
in a thorough review and, resolution of 4. 16
kV
circuit breaker
problems.
'The
NRC staff met with PPRL design
and engineering staff in 1994 concerning
the vessel
level vent modification.
Based
on
a review of the
new design,
and
inspection of the installation
on Unit 2,
we concluded that the design
as
installed meets
the intent of NRC bulletin 93-03,
and is acceptable.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Your cooperation with us 'in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
95ii300015 95ii2i
ADOCK 05000387
8
Docket Nos.
50-387;50-388
Walter J.
Pasciak,
Chief
Projects
Branch
4
Division of Reactor Projects
Enclosures:
'1.
Combined
NRC Inspection
Report 50-387/95-22;
50-388/95-22
i(p
i(
Mr. Robert
G. Byram
cc w/encl:
H.
G. Stanley,
Vice President
Nuclear Operations
J.
M. Kenny, Nuclear Licensing
G. T. Jones,
Vice President
Nuclear Engineering
M. M. Urioste, Nuclear Services
Manager,
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Assessment
Services
J.
Finnegan,
Supervisor
Operating
Experiences
H. D. Woodeshick,
Special Office of the President
R. Wehry, Nuclear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
0
0
Hr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2) Inspection
Reports .(20)
NRC Resident
Inspector
PUBLIC
Distribution w/encl: (Via E-Hail)
W. Dean,
OEDO
C. Poslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Prague am Branch,
NRR (IPAS)
DOCUMENT NAME:9522-2.sus
To receive a copy of this document, indicate In the box:
'ttachment/enclosure
'N'
y
py without attachme
losure
'E" = Copy with
OFFICE
RI:DRP
RI:
R
E;
NR
NAME
MBanerjee
WPa
iakr
CPo lus
DATE
ll/~ //9
11/95
OFFICIAL RECORD
COPY