Forwards Insp Repts 50-387/95-20 & 50-388/95-20 on 950806- 0918.No Violations Noted
ML17158A934
Person / Time
Site: Susquehanna  
Issue date: 10/12/1995
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A935 List:
References
NUDOCS 9510190131
Download: ML17158A934 (3)


See also: IR 05000387/1995020

Text

October 12,

1995

Hr. Robert

G.

Byram

Senior Vice President - Nuclear

Pennsylvania

Power

8 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC COMBINED INSPECTION

REPORT

NOS. 50-387/95-20;

50-388/95-20

Dear Hr. Byram:

The enclosed

report documents

a resident

inspection

conducted

by Hs.

H.

Banerjee,

Hr. B. J. HcDermott,

from August 6,

1995 through September

18,

1995,

at the Susquehanna

Steam Electric Station

(SSES),

Salem Township,

Pennsylvania.

Areas relevant to the health

and safety of the public examined

during the inspection

are described

in the enclosed

report.

At the conclusion

of the inspection,

the inspectors

summarized their preliminary. findings

with'r.

G. J.

Kuczynski

and other

members of your staff.

The actions

taken

by your staff in response

to the dropped

new fuel bundle,

including development of a detailed recovery plan, safety evaluation,

and root

cause

assessment,

demonstrated

a strong safety perspective

and

an effective

organizational

response

to the event.

We noted that appropriate

consideration

was given to deferral of the planned electrical

bus maintenance

to avoid the

potential for complicating the fuel bundle recovery.

Very good management

oversight was'bserved

throughout this evolution.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Your cooperation with us in this matter is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Clifford J. Anderson,

Chief

Reactor Projects

Section

2B

Division of Reactor Projects

Docket Nos.

50-387 50-388

Enclosure:

Combined

NRC Inspection

Report 50-387/95-20;

50-388/95-20

95iOi90i3i 95i012

PDR

ADOCK 05000387

8

PDR

xz( Q~o

Hr.. Robert

G.

Byram

cc w/encl:

H..G. Stanley,

Vice President - Nuclear Operations

J.

H. Kenny, Nuclear Licensing

G. T. Jones,

Vice President - Nuclear Engineering

H.

M. Urioste,

Nuclear Services

Manager,

General

Electric

C.

D. Lopes,

Manager

Nuclear Security

W. Burchill, Manager,

Assessment

Services

H.

D. Woodeshick,

Special Office of the President

R. Wehry, Nu'clear Licensing

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Nuclear Safety Information Center

(NSIC)

Commonwealth of Pennsylvania

~

~

~

~

Mr. Robert

G. Byram,

3

Distributi on w/encl:

Region I Docket

Room (with concurrences)

K. Gallagher,

DRP

D. Screnci,

PAO (2)

NRC Resident

Inspector

PUBLIC

Distributi on w/encl:

(Via E-Mail )

W. Dean,

OEDO

C. Poslusny,

Project

Manager,

NRR

J. Stolz,

PDI-2,

NRR

Inspection

Program Branch,

NRR (IPAS)

DOCUMENT NAME:

a:9520.sus

To receive a copy of this document, Indicate In the box:

C"

Copy without attachment/enclosure

'F

Copy with

attachment/enclosure

'N'

No copy

OFFICE

RI 'DRP

NAME

BMcDermott <

DATE

10//+95

RI: DRP

CAnderson,

10//+95

OFFICIAL RECORD

COPY