October 12,
1995
Hr. Robert
G.
Byram
Senior Vice President - Nuclear
Power
8 Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC COMBINED INSPECTION
REPORT
NOS. 50-387/95-20;
50-388/95-20
Dear Hr. Byram:
The enclosed
report documents
a resident
inspection
conducted
by Hs.
H.
Banerjee,
Hr. B. J. HcDermott,
from August 6,
1995 through September
18,
1995,
at the Susquehanna
Steam Electric Station
(SSES),
Salem Township,
Areas relevant to the health
and safety of the public examined
during the inspection
are described
in the enclosed
report.
At the conclusion
of the inspection,
the inspectors
summarized their preliminary. findings
with'r.
G. J.
Kuczynski
and other
members of your staff.
The actions
taken
by your staff in response
to the dropped
new fuel bundle,
including development of a detailed recovery plan, safety evaluation,
and root
cause
assessment,
demonstrated
a strong safety perspective
and
an effective
organizational
response
to the event.
We noted that appropriate
consideration
was given to deferral of the planned electrical
bus maintenance
to avoid the
potential for complicating the fuel bundle recovery.
Very good management
oversight was'bserved
throughout this evolution.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Clifford J. Anderson,
Chief
Reactor Projects
Section
2B
Division of Reactor Projects
Docket Nos.
50-387 50-388
Enclosure:
Combined
NRC Inspection
Report 50-387/95-20;
50-388/95-20
95iOi90i3i 95i012
ADOCK 05000387
8
xz( Q~o
Hr.. Robert
G.
Byram
cc w/encl:
H..G. Stanley,
Vice President - Nuclear Operations
J.
H. Kenny, Nuclear Licensing
G. T. Jones,
Vice President - Nuclear Engineering
H.
M. Urioste,
Nuclear Services
Manager,
General
Electric
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Assessment
Services
H.
D. Woodeshick,
Special Office of the President
R. Wehry, Nu'clear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
~
~
~
~
Mr. Robert
G. Byram,
3
Distributi on w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2)
NRC Resident
Inspector
PUBLIC
Distributi on w/encl:
(Via E-Mail )
W. Dean,
OEDO
C. Poslusny,
Project
Manager,
J. Stolz,
PDI-2,
Inspection
Program Branch,
NRR (IPAS)
DOCUMENT NAME:
a:9520.sus
To receive a copy of this document, Indicate In the box:
C"
Copy without attachment/enclosure
'F
Copy with
attachment/enclosure
'N'
No copy
OFFICE
RI 'DRP
NAME
BMcDermott <
DATE
10//+95
RI: DRP
CAnderson,
10//+95
OFFICIAL RECORD
COPY