ML17158A917

From kanterella
Jump to navigation Jump to search
Notice of Withdrawal of 941111 Application for Amend to Licenses NPF-14 & NPF-22
ML17158A917
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/02/1995
From: Poslusny C
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17158A918 List:
References
NUDOCS 9510040283
Download: ML17158A917 (2)


Text

7590-01 UN T STATES NUCL AR REGULATORY COMMISSION P

NNSY VANIA POW R AND LIGHT COMPANY CK T NOS. 50-3 AND 50-388 NOT C

OF WITHDRAWA 0

APP ICATION FOR M

D 0

AC Y OP RAT NG L

C NS S

The U.S. Nuclear Regulatory Commission (the Commission) has granted a

request by Pennsylvania Power and Light Company (the licensee) to withdraw its November ll, 1994 application for proposed amendment to Facility Operating License Nos.

NPF-14 and NPF-22, for Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania.

The proposed amendment would have revised the Technical Specifications (TS) to extend the main turbine valve surveillance test interval from a weekly basis to no greater that 92 days for all main turbine stop, control, and combined intermediate valves.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the ~FD RAL ~REGIST on December 21, 1994 (59 FR 65821).

However, by letter dated August 21, 1995, the licensee withdrew the proposed change.

For further details with respect to this action, see (1) the application for amendment dated November ll, 1994, and the licensee's letter dated August 21, 1995, which withdrew the application for license amendment.

The above documents are available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, 95l0040283 951002 PDR ADOCK 05000387 P

PDR

and at the local public document room located at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, Pennsylvania 18701.

Dated at Rockville, Haryland, this 2nd day of October 1995.

FOR THE NUCLEAR REGULATORY COHHISSION 9 a@

Chester

Poslusny, Senior Project Hanager Project Directorate 1-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation