August
~95 Mr. Pobert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, SCOPE AND SCHEDULE (TAC M90113),
Dear Mr. Byram:
UNIT 2 CORE SHROUD INSPECTION'y letter dated May 22,
- 1995, Pennsylvania Power and Light Company (PP&L) provided an interim response to Generic Letter (GL) 94-03 outlining the core shroud inspection scope and schedule for Susquehanna Steam Electric Station (SSES)
Unit 2.
In that submittal you indicated that the inspections to be conducted at the unit will be in accordance with BWR Owners Group guidance for Category B plants.
Specifically, welds H3, H4, H5, H6B and H7 will be inspected during the outage which is scheduled to begin in September 1995.
Based on the information provided in this submittal, the staff finds your core shroud inspection plan for SSES Unit 2 to be acceptable.
Sincerely, Docket No. 50-387 DISTRIBUTION Docket File PUBLIC PDI-2 Reading SVarga JZwolinski JStolz CPoslusny MO'Brien OGC ACRS(4)
JStrosnider GCarpenter
- JWhite, R
N original signed by Chester
- Poslusny, Sr., Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OFFICE NAME PDI-2 LA MO'Bri PDI-2 PM CPoslusny:rb EMCB JStros der P
-2D JSt z
DATE 95 1
9B I
95 95 OFFICIAL RE 0 D COPY DOCUMENT NAME:
SU90113.GEN
"..4'CIRC 8 9508iiOi70 950807 PDR ADOCK 05000387 6
PDR Pt
)t
I 4
t, It I
,t C
t I
I I
I
'I I
t
)I I Il tt
Cy I Cl0 IVl Pi Op
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 1995 Hr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 CORE SHROUD INSPECTION SCOPE AND SCHEDULE (TAC H90113)
Dear Hr. Byram:
By letter dated Hay 22,
- 1995, Pennsylvania Power and Light Company (PPKL) provided an interim response to Generic Letter (GL) 94-03 outlining the core shroud inspection scope and schedule for Susquehanna Steam Electric Station (SSES) Unit 2.
In that submittal you indicated that the inspections to be conducted at the unit will be in accordance with BWR Owners Group guidance for Category B plants.
Specifically, welds H3, H4, H5, HGB and H7 will be inspected during the outage which is scheduled to begin in September 1995.
Based on the information provided in this submittal, the staff finds your core shroud inspection plan for SSES Unit 2 to be acceptable.
Sincerely, Docket No. 50-387 Chester Poslu ny, Sr., Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
'I
/
P
~
~
~ Hr. Robert G.
Byram Pennsylvania Power
& Light Company Susquehanna Steam Electric Station, Units 1
& 2 CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Hr. J.
H. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Hrs. Haitri Banerjee Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Hr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Hr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street
- Berwick, PA 18603