August 2,
1995
Mr. Robert
G.
Byram
Senior Vice President
Nuclear
Power
& Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT'RC
COMBINED INSPECTION
REPORT
NOS. 50-387/95-12'0-388/95-12
Dear Mr. Byram:
1
The enclosed report documents
a resident
inspection
conducted
by
Ms.
M. Banerjee,
and Mr. B. J.
McDermott from May 16,
1995 through
July 4,
1995, at the Susquehanna
Steam Electric Station
(SSES),
Salem
Township,
This report also includes
a review of Fire Protection
issues
conducted
by Mr. N. J.
Blumberg from July 10 through
13,
1995.
Areas
relevant to the health
and safety of the public examined during the inspection
are described
in the enclosed report.
At the conclusion of the inspection,
the inspectors
summarized their preliminary findings with Mr. H.
G. Stanley
and other members of your staff.
The Unit
1 restart
and associated
power uprate testing were observed to be
well controlled with good management
involvement
and oversight.
A review of Licensee
Event Reports
(LER) during this period identified that
eight supplemental
reports
are overdue
by at least six months,
and in some
cases
greater
than
a year.
guestions
were raised regarding the adequacy of
the system
used for tracking the supplemental
reports at Susquehanna.
This
issue will be unresolved
pending additional
information on the process
used
for tracking supplemental
LERs and implementation of corrective actions.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Clifford J.
Anderson,
Chief,
Reactor Projects,
Section
2B
Docket Nos.
50-387;50-388
Enclosure:
1.
Combined
NRC Inspection
Report 50-387/95-12;
50-388/95-12
9508080373
950802
ADOCK 05000387
J
I E01
Mr. Robert
G.
Byram
cc w/encl:
H.
G. Stanley,
Vice President - Nuclear Operations
G. T. Jones,
Vice President - Nuclear Engineering
J.
M. Kenny, Nuclear Licensing
M.
M. Urioste,
Nuclear Services
Manager
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Nuclear Assessment
Services
R.
R. Wehry, Nuclear Licensing
Susquehanna
H. D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
Mr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
PUBLIC
D. Screnci,
PAO (2)-
NRC Resident
Inspector
Distribution w/encl
(Via E-Mail)
M. Dean,
OEDO
C. Poslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Program Branch,
NRR (IPAS)
DOCUMENT NAME:
a:9512.sus
To receive a copy of this document, indicate In the born
C
~ Copy without attachment/enclosure
"E's Copy with attachment/enclosure
N i No copy
OFFICE
RI:DRP
RI:DRP
RI: DRP
NAME
BMcDermott C 6'
NBlumber
CAnderson
i-" 0
DATE
8/ g/95
8/ck/95
8/P /95
OFFICIAL RECORD
COPY