ML17158A708
| ML17158A708 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/12/1995 |
| From: | Jason White NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17158A709 | List: |
| References | |
| NUDOCS 9506200191 | |
| Download: ML17158A708 (6) | |
See also: IR 05000387/1995080
Text
PRIC)Rl l Y 2
REGULATORY"4
ÃEIXPBTBIIlBUTION SYSTEM (RIDS)
SUBJECT:
Forwards insp repts
50-387/95-80
6 50-388/95-80
on
950508-12.No violations identified.
DISTRIBUTION CODE:
IEOZD
COPIES
RECEIVED:LTRl ENCLl SIZE: Z ~2
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
05000387
ACCESSION NBR:9506200191
DOC.DATE: 95/06/12
NOTARIZED: NO
DOCKET
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
HITE,J.R.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFIL:ATION
BYRAMiR.G.
Power
s Light Co.
F,
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN1
FILE
01
ERNAL: LITCO BRYCEiJ H
NRC PDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ZD CODE/NAME
POSLUSNYiC
AEOD/DEIB
CENTE
NRR/DORS
OEAB
NUDOCS-ABSTRACT
. OGC/HDS2
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Y
2
C
C
U
N'
YOTE TOALL "RIDS" RECIPIEiiS:.
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCL'MEYTCONTROL
DESK, ROOM P! -37 (EXT. 504-20S3
) TO ELIMIYATEYOUR YAME FROM
DISTRIBL'TIOY,LISTS FOR DOCUMEYTS YOU DOi"!'
EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
I
June
12,
1995
Mr. Robert
G.
Byram
Senior Vice President
Nuclear
Power
5. Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
COMBINED INSPECTION
REPORT
NOS. 50-387/95-80
AND 50-388/95-80
Dear Mr. Byram:
This letter transmits
the results of the inspection
conducted
by Messrs.
T. Easlick,
S. Morris and
C. Poslusny
from May 8, through
12,
1995, at the
Susquehanna
Steam Electric Station
(SSES),
The inspection
focused
on
a performance
based
assessment
of the effectiveness
of problem
identification and resolution
processes
and controls,
and
on issues
important
to ensuring the public health
and safety.
The inspection consisted of
observations
of activities, reviews of documents
and interviews with plant
personnel.
The results
are documented
in the enclosed
report
and were
discussed
with Mr. H.
G. Stanley
and other members of your staff at the
conclusion of the inspection.
Overall, the inspectors
determined that the Continuous
Performance
Improvement
Process
(CPIP) Teams'ecommendations
have given the plant staff the tools to
effectively identify and resolve
problems or issues that affect plant safety
and/or are conditions
adverse to quality.
Your staff has taken strong
measures
and applied significant resources
to improve performance
in the
Nuclear Department in specific problem areas,
as well as
improve the
effectiveness
of the corrective action process.
Although SSES
does not
currently have
an effective method to conduct
an integrated
approach to
trending performance history of various conditions, your staff recognized that
improvements
in trending
can
be made through system
enhancements
and
centralization of the trending function in new Nuclear Assessment
Services
(NAS) organization.
While the inspectors
could not fully assess
the long term effects of the
new
management
structure
and program changes,
someimprovements
have already
been
realized in the short time the programs
have
been in place,
as demonstrated
by
the recent successful
Unit
1 refueling outage.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
9506200i9i 9'50bi2
ADOCK 05000387
8
Mr. Robert
G.
Byram
Your cooperation
is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
John
R. White, Chief
Reactor Projects
Section
2A
Docket Nos. 50-387;
50-388
Enclosures:
NRC Region I Inspection
Report 50-387/95-80
5 50-388/95-80
cc w/encl:
H.
G. Stanley,
Vice President - Nuclear Operations
J.
M. Kenny, Nuclear Licensing
G. T. Jones,
Vice President
Nuclear Engineering
H. H. Urioste, Nuclear Services
Manager,
General
Electric
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Assessment
Services
H.
D. Woodeshick,
Special Office of the President
R. Wehry, Nuclear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
Mr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2)
NRC Resident
Inspector
T. Easlick, Limerick
S. Morris, Hope Creek
PUBLIC
Distribution w/encl: (Via E-Mail)
W. Dean,
OEDO
C. Poslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Program
Branch,
NRR (IPAS)
DOCUMENT NAME:
a:9580.sus
To recehe a copy of thh docume
icate I
attachment/enclosure
'N'
py
OFFICE
RI.
C
Copy without attachmen%nciosure
'E
Copy with
NAME
DATE
ick
/
95
te
95
0
ICIAL RECORD
COPY