ML17158A676
| ML17158A676 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/15/1995 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17158A677 | List: |
| References | |
| NUDOCS 9505240121 | |
| Download: ML17158A676 (5) | |
See also: IR 05000387/1995010
Text
PRIORIT'Y Z
REGULATORYliiCCCMHSQN&5'Ãfs(JTIONSYSTEM (RIDS)
>~
ACCESSION NBR:9505240121
DOC.DATE: 95/05/15
NOTARIZED:
NO
DOCKET I
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station,
Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
JOYNER,J.H.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
& Light Co.
SUBJECT:
Forwards
insp repts
50-387/95-10
a 50-388/95-10
on 950410-
14.No violations noted.
F
DZSTRZBDTZON CODE:
ZE06D
COPZES
RECEZVED:LTR
.(
ENCL /
SZSE: 2+ /
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
NOTES:
05000387
C
RECIPIENT
ID CODE/NAME
PD1-2
RGNl
EXTERNAL: NOAC
NOTES:
INTERNAL:
R
FILE CEN
ER
HRR DISP/PIPB
OE DIR
FILE
01
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNYPC
AEOD/TTC
NMSS/SGTB
T8F5
NUDOCS-ABSTRACT
OGC/HDS2
RGN1
DRSS/RPB
RGN4/FIPS
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
C
iOTE TO ALL"RIDS" RECIPIENT'TS:.
PLEASE HELP I.'S TO RED!:CE WASTE! CONTACTTHE DOCL'XIEi'1 CONTROL
DESK, ROOiI Pl 37 (E>;T. 504 0083
) TO FLIXIIiATEYOl;R NAi!EITROif
DIS I'RtBI.'I'IOiLIS'I S FOR DOCI.'XIENTSYOL'Oi "I'
EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
18
ENCL
18
May 15,
1995
Hr. Robert
G.
Byram
Senior Vice President
Nuclear
Power
& Light Company
2 North Ninth Street
Allentown,
18101
SUBJECT:
NRC
INSPECTION NOS. 50-387/95-10
AND 50-388/95-10
LETTER
FROM BYRAH TO NRC,
DATED FEBRUARY 3,
1995,
REPLY TO NOTICE
OF VIOLATION (50-387/94-24-01
AND 50-388/94-25-01)
Dear Hr. Byram:
This letter refers to the announced
safety inspection
conducted
by Hr.
Randolph
Ragland of this office on April 10 to 14,
1995, of activities
authorized
by
NRC License
Nos.
and
NPF-22 at the Susquehanna
Steam
Electric Station
and to the discussions
of our findings by Mr. Ragland with
Mr. G. Stanley
and other members of your staff at the conclusion of the
inspection
on April 14,
1995.
Areas
examined
in this inspection
are important to public health
and safety,
and are described
in the
NRC Region I Inspection
Report which is enclosed with
this letter.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
The inspection
was conducted
to
review occupational
radiation safety during the Unit
1 refueling outage.
Areas reviewed
included audits
and appraisals,
changes
to organization
and
facilities, training
and qualifications,
planning
and preparation,
external
exposure control, internal
exposure control, control of radioactive materials
and contamination,
and surveys
and monitoring.
Results of the inspection revealed
very good overall performance.
Audits and
appraisals
were being performed to identify weaknesses
and take corrective
actions; training
and qualifications of contract health physics technicians
were verified and noted to be very good; radiological controls were well
planned
and effectively implemented;
methods for assigning internal
dose
followed regulatory guidance;
and radioactive materials
and contamination
were
well controlled.
Notable
items included the extensive
use of =shielding in the
drywell, reactor
vessel
nozzle flushing for in-service-inspections,
and very
good implementation of real time dose monitoring.
One weakness,
with respect to the assignment
of responsibility for the
performance of receipt of radioactive material
surveys
was identified.
This
item will be reviewed during the next inspection of this program area.
950524012i
9505i5
ADQCK 05000387
6
%ARCS
~41 4
R.
G.
Byram
No violations of regulatory requirements
were observed
and
no response
to this
letter is required.
In addition,
we reviewed
and verified the corrective
and preventive actions
documented
in your February
3,
1995 correspondence,
in response
to our
December
22,
1994 letter and notice of violation (NOV).
We found them to
adequately
address
our concerns.
Your cooperation with us is appreciated.
Sincerely,
gripman "i::gnec By:
Richard R. i4wmi~
James
H. Joyner,
Chief
Facilities Radiological
Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
Docket Nos.
50-387
S. 50-388
Enclosure:
NRC Region I Inspection
Report
Nos. 50-387/95-10
and 50-388/95-10
cc w/encl:
H.
G. Stanley,
Vice President - Nuclear Operations
J.
H. Kenny, Nuclear Licensing
G. T. Jones,
Vice President - Nuclear Engineering
H.
M. Urioste, Nuclear Services
Manager,
General
Electric
C.
D. Lopes,
Manager
Nuclear Security
W. Burchill, Manager,
Assessment
Services
H.
D, Woodeshick,
Special Office of the President
R. Wehry, Nuclear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Commonwealth of Pennsylvania
R.
G.
Byram
Distribution w encl:
Region
I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2)
NRC Resident
Inspector
PUBLIC
Nuclear Safety Informa'-on Center
(NSIC)
Distribution w encl:
(Via E-Hail)
W. Dean,
OEDO
C. Poslusny,
Project Manager,
J. Stolz,
PDI-2,
Inspection
Program
Branch,
NRR (IPAS)
DOCUMENT NAME:
G:
FRSSB.GRP(38795-10.RPT
f
I
py fthl d
t.hdl
t
I
th h:
c
cpy
Ith
t tt
h
tl
lp
d
cpy
I
pf ~y~
echm
t/enclosure
"N
~ No copy
OFFICE
RI/ DRSS
E RI/ DRSS
RI/ DRSS
AI
NAME
Ragland
Bor es
&
Joyner
I
DATE
05/10/95
05/ II /
05/ i~/ 5
OFFICIAL RECORD
COPY
/95
05/
/95