Forwards Insp Rept 50-387/95-09 on 950403-07.No Violations Noted
ML17158A643
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/26/1995
From: Modes M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A644 List:
References
NUDOCS 9505030080
Download: ML17158A643 (2)


See also: IR 05000387/1995009

Text

Apri1 26,

1995

, Mr. Robert

G.

Byram

Senior Vice President

Nuclear

Pennsylvania

Power

& Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

INSPECTION

REPORT

NO. 50-387/95-09

Dear Nr. Byram:

This letter refers to the announced

safety inspection,

conducted

by

Nr.

P. Patnaik of this office at the Susquehanna

Steam Electric Station,

Unit 1, Berwick, Pennsylvania,

during the period of April 3-7,

1995.

The

results of this inspection

were discussed

with members of your staff at the

conclusion of the inspection

on April 7,

1995.

The inspection

focused primarily on the inservice inspection

program

implemented during the outage,

ultrasonic examination activity on the core

shroud welds,

and

a review of the results of the mechanical

stress

improvement

process

performed

on selected

welds.

There were other areas

also covered

during the inspection

as described

in the attached report.

The inspector

found that your inservice inspection

program for the outage

complied with the applicable

American Society of Mechanical

Engineers

(ASNE)

Code,

Section XI, and the implementation of the program

was satisfactory.

There were

no discrepancies

noted in the conduct of examinations

performed

on

the welds of the core shroud,

and the results of mechanical

stress

improvement

were acceptable

in accordance

with your engineering specification.

The inspector

noted that you are implementing

two ASNE Code cases,

N-509 and

N-423, before they have

been reviewed for acceptability

and listed in

Regulatory

Guide 1. 147.

If the

NRC staff finds the

Code cases

to be

unacceptable

or conditionally acceptable, it would be necessary

for you to

retroactively correct your program.

In the case of N-524, the examination

could

be costly if retroactively

implemented after

a long delay.

Within the scope of this inspection,

no violations were observed.

No response

to this letter is needed.

Your cooperation with us in this matter is

appreciated.

Sincerely,

po

~~+'3 ~gJ

9505030080

950426

PDR

ADQCK 05000387

G

PDR

Michael

C. Modes, Chief

Materials Section

Division of Reactor Safety

ol

Mr. Robert

G.

Byram

Docket No. 50-387

April 26,

1995

Enclosure:

Inspection

Report No. 50-387/95-09

w/Attachment I

cc w/encl:

H.

G. Stanley,

Vice President - Nuclear Operations

J.

M. Kenny, Nuclear Licensing

G. T. Jones,

Vice President - Nuclear Engineering

M.

M. Urioste, Nuclear Services

Manager,

General Electric

C.

D. Lopes,

Manager - Nuclear Security

W. Burchill, Manager,

Assessment

Services

H. D. Woodeshick,

Special Office of the President

R. Wehry, Nuclear Licensing

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Nuclear Safety Information Center

(NSIC)

Commonwealth of Pennsylvania

Distribution w/encl:

Region

I Docket

Room (with concurrences)

J. Wiggins,

DRS

K. Gallagher,

DRP

D. Screnci,

PAO (2)

NRC Resident

Inspector

PUBLIC

DRS File

Distribution w/encl:

(Via E-Mail)

W. Dean,

OEDO

C..Poslusny,

Project Manager,

NRR

J. Stolz,

PDI-2,

NRR

Inspection

Program

Branch,

NRR (IPAS)

DOCUMENT NAME:

A:SU19509. INS

To receive a copy of this document, indicate in the botu 'C" ~ Copy witho t attachment/enciosure

E'

Copy with attachment/enclosure

'N" ~ No

copy

OFFICE

RI/DRS

RI/DRS

NAME

PPatnaik

dm

MModes

TE

04/20/95

04/

/9

04

/95

OFFICIAL RECORD

COPY

04/ '95

04/

/95