Forwards Insp Repts 50-387/94-19 & 50-388/94-19 on 940907-16.No Violation Noted
ML17158A505
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/06/1994
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A506 List:
References
NUDOCS 9410170035
Download: ML17158A505 (5)


See also: IR 05000387/1994019

Text

gi( DOCS OFI:SITI'. I:ACII.II i")

REGULATORY'NFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:94'10170035

DOC.DATE: 94/10/06

NOTARIZED:

NO

FACIL:50-387 Susquehanna,

Steam Electric Station, Unit 1, Pennsylva

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTH.NAME

AUTHOR AFFILIATION

JOYNER,J.H.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

& Light Co.

DOCKET

05000387

05000388

P

NOTES:

R

SUBJECT:

Forwards

insp repts

50-387/94-19

6 50-388/94-19

on

940907-16.No violation noted.

R

DISTRIBUTION CODE:

IE35D

COPIES

RECEIVED:LTR

ENCL

SIZE:

I

TITLE: Emergency Preparedness-Appraisal/Confirmatory

Action Ltr/ xercise

Rep

05000387

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: AEOD/DOA/IRB

NRR/DRSS/PEPB9D

NUDOCS-ABSTRACT

RGN1

FILE

'01

EXTERNAL: NOAC

OTES:

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNYiC

CSUXE8

NRR/PMAS/ILRB12

OE DIR

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

D

U

POTE TO ALL"RIDS" RECIPIENTS:

PL EASE HELP US TO RLDL'CE 6'ASTE! COiTACTTHE DOCL'NIEil COi'TROL

DESk. ROOiI PI.37 (LXI: 5(H.

OS3 ) TO ELliIliATE5'OI:R iAiIEFROil

DIS'I'RIDL"I'IOiI.IS I'S FOR DOCI.'XIEi'I'SVOL'Oi "I'

EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

12

ENCL

12

October 6,

1994

Hr. Robert

G.

Byram

Senior Vice President - Nuclear

Pennsylvania

Power 5 Light Company

2 North Ninth Street

Allentown,

PA

18101

SUBJECT:

Dear Hr. Byram:

SUSQUEHANNA STEAN ELECTRIC STATION, UNITS ONE AND TWO,

EMERGENCY PREPAREDNESS

COMBINED INSPECTION NOS.

50-387/94-19;

50-388/94-20

This letter forwards the report of the subject

announced

inspection

conducted

by Hr.

W. Haier of this office on September

7 and 8,

1994, at the emergency

response facilities in Allentown, Hazleton,

Berwick,

and Wilkes-Barre,

Pennsylvania.

The inspection

was continued

in the

NRC Region I office through

September

16,

1994, to review three Significant Operating Occurrence

Reports

affecting emergency

preparedness

equipment.

Preliminary inspection findings

were discussed

with Hr.

Gene Stanley of your staff on September

8,

1994

and

later communicated

by telephone

to Hr. Rick Wehry on September

16,

1994 by Hr.

Haier.

Areas

examined during this inspection

are important to public health

and

safety

and are described

in the

NRC Region

I Inspection

Report that is

enclosed with this letter.

Within those

areas,

the inspection consisted

of

observations

by the inspector,

interviews of personnel,

and examinations of

selected

procedures

and records.

The emergency

response facilities that were inspected

were operationally ready

to respond to

a plant emergency

as required

by the Susquehanna

Steam Electric

Station

(SSES)

Emergency

Plan.

We share

a concern of your nuclear

emergency

planning

(NEP) staff about the length of time since activation of the backup

emergency

operations facility was last demonstrated

in a drill or exercise.

Please

give this matter your attention.

Our review of your plans to relocate

the emergency

operations facility from

its current location to one outside the ten mile emergency

planning zone found

that you are planning this change with appropriate

consideration of the

material, logistical

and time-sensitive factors involved in such

a change.

The actions your NEP staff have taken or are planning to take to correct

recent

outages of the public notification (siren)

system are considered

adequate.

One of the siren outages,

however,

was caused

by a lack of

communication

and coordination

between the

NEP staff and another

PPLL group

having responsibility for the telephone line which activates

the sirens.

Another recent event that also resulted

from a lack of communication

was the

removal of meteorological

data

(Ram-Tek) terminals

from the technical

support

center

and the emergency

operations facility as part of a plant modification.

This modification of emergency

response facilities was

made without prior

!

~i.

OFFlCNI. RECORD COPY

9410170035

94100b

PDR

ADOCK 05000387

8

PDR

R.

Byram

notification of the

NEP staff.

Two similar communication

lapses affecting

emergency

preparedness

facilities and equipment

were noted during

a previous

NRC emergency

preparedness

inspection this year (50-387/94-08;

50-388/94-10).

Notwithstanding the comprehensive

and aggressive

corrective actions

taken in

response

to each of those occurrences,

we are concerned

about the apparent

lack of knowledge

and sensitivity regarding

emergency

preparedness

program

requirements

on the part of individuals and groups within your organization.

This may be indicative of a broader

problem.

We request that you pursue that

potential

and respond within 30 days after receipt of this letter with your

assessment

of the problem

and your plans for addressing it, if one exists.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosure will be placed in the NRC's Public Document

Room.

Thank you for your cooperation with our inspection effort.

Sincerely,

Ortglnal Sgned By;

James H. Joyner

James

H. Joyner,

Chief

Facilities Radiological

Safety

and Safeguards

Branch

Division of Radiation Safety

and Safeguards

Docket Nos.

50-387,

50-388

Enclosure:

Combined Inspection

Report 50-387/94-19;

50-388/94-20

cc w/encl:

H.

G. Stanley,

Vice President - Nuclear Operations

J.

M, Kenny, Nuclear Licensing

G. T. Jones,

Vice President

Nuclear Engineering

M; M. Urioste,

Nuclear Services

Manager

J.

M. Finnegan,

Supervisor,

Nuclear Compliance

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Commonwealth of Pennsylvania

OFFICtAL REGO;,D COPY

R.

Byram

Distribution w/encl:

Region I Docket

Room (with concurrences)

K. Gallagher,

DRP

PUBLIC

Nuclear Safety Information Center

(NSIC)

K. Abraham,

PAO (2)

NRC Resident

Inspector

Distribution w/encl: (Via E-Hail)

W. Dean,

OEDO

C. Poslusny,

Project Manager,

NRR

H. Thadani,

PDI-2,

NRR

H. Shannon,

ILPB

DOCUMENT NAME:

G:iFRSSB.GRPiSUS94-19.WAM

To receive a copy of this document, Indicate In the boxu "C

~ Copy without attachmentlencfosure

E

~ Copy with attachment/snciosura

"N

m No copy

OFFICE

DATE

RI: DRSS

Haier

09 5

RI:DRSS

Keimi

09/9s

4

RI:DRSS

Joyner

94

OFFICIAL RECORD

COPY

~O