ML17158A492

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/94-17 & 50-388/94-17 on 940808-23.No Violations Noted
ML17158A492
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/23/1994
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A493 List:
References
NUDOCS 9410040033
Download: ML17158A492 (3)


See also: IR 05000387/1994017

Text

PRIDRIT'Y Z

REGULATORY 1%6%k6'IUA'SZkIMUTION SYSTEM (RIDS)

ACCESSION NBR:9410040033

DOC.DATE: 94/09/23

NOTARIZED:

NO

DOCKET ¹

FACIL:50-387 Susquehanna

Steam Electric Station,

Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

KELLYgE.M.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

& Light Co.

SUBJECT:

Forwards insp repts

50-387/94-17

& 50-388/94-17

on

940808-23.No violations noted.

DISTRIBUTION CODE:

ZEOZD

COPIES

RECEIVED:LTRl ENCL j

SIZE:

+

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

05000387

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

AEODJ

F'IXR CENTER

75RCX/HHFB

NUDOCS-ABSTRACT

OGC/HDS2

RGN1

FILE

01

EXTERNAL

EG&G/BRYCE E J

~ H ~

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNYEC

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

R-S/HFB

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTES:

1

1

NOTE TO ALL"RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCONTROL

DESK, ROO!iI P1.37 (EXT. 504-20S3

) TO ELIMINATEYOUR NA!iIEFROiI

DISTRIBL"I'IOY.LISTS FOR DOCUhlENTS YOU DON"I'NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

.I

September

23,

1994

Docket Nos. 50-387

50-388

Hr. Robert

G.

Byram

Senior Vice President

Nuclear

Pennsylvania

Power

8 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Hr. Byram:

SUBJECT:

SUS(UEHANNA ENGINEERING INSPECTION NOS. 94-17

AND 94-18

This letter refers to the inspection of your engineering activities conducted

by Hr. B. HcDermott of this office from August 8-23,

1994, at the Susquehanna

Steam Electric Station

and at your Allentown corporate offices.

The

inspection

was focused

on issues

important to public health

and safety,

and

consisted of an independent

evaluation of the plant design

change

process.

The preliminary inspection findings were discussed

by telephone with

Hr.

R. Saccone

and other members of your staff on August 23,

1994,

and with

you also

on September

15,

1994.

Your program for developing design

changes

and modifications

was found to be

well controlled.

Several safety-significant

design

changes,

derived from

Susquehanna

Individual Plant Evaluation

(IPE) analyses,

were found to be well

conceived.

These

changes

are notable in that they enhance

your

operators'bilities

to better

cope with high risk IPE scenarios.

Temporary

modifications were appropriately evaluated for safety impact.

Communications

between

the site

and corporate organizations

were generally viewed

as

a

strength,

and your design basis

documentation

project is an excellent

initiative.

The Engineering

Review Committee

and the Nuclear Safety

Assessment

Group were found to provide valuable insights, contributing to

effective management

oversight.

No reply to this letter is required,

and your cooperation with us during this

inspection is appreciated.

Sincerely,

Enclosure:

Inspection

Report Nos.

9410040033

940923

PDR

ADOCK 05000387

Q

PDR

P Cpi~ ~

VV " .s)

Eugene

H. Kelly, Chief

Systems

Section

Division of Reactor Safety

50-387/94-17

and 50-388/94-18

September

23,

1994

Hr. Robert

G.

Byram

cc w/encl:

H.

G. Stanley,

Vice President

Nuclear Operations

J.

H. Kenny, Nuclear Licensing

'.

T. Jones,

Vice President

Nuclear Engineering

H. H. Urioste, Nuclear Services

Manager

J.

M. Finnegan,

Supervisor,

Nuclear Compliance

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Public Document

Room

(PDR)

Local Public Document

Room

(LPDR)

Nuclear Safety Information Center

(NSIC)

K. Abraham,

PAO (2) Inspection

Reports

(20)

SALP

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

J. Wiggins,

DRS

K. Gallagher,

DRP

DRS Files (2)

bcc w/encl: (Via E-Hail)

W. Dean,

OEDO

C. Poslusny,

Project Manager,

NRR

H. Thadani,

PDI-2,

NRR

M. Shannon,

ILPB

OFFICE

RI

DRS

RI

DRS

RI

RI

NAME

HCDE MOTT

KELLY

DATE

0 FICIAL RECORD

COPY

A:SU941718.INS