Docket Nos.
50-387 and 50-388 UNITED STATES NUCLEAR'REGULATORYCOMMISSION WASHINGTON, D.C. 20555-0001 August 23, 1994 Mr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Byram:
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2, STAFFING PRACTICES SURVEY The U.S. Nuclear Regulatory Commission is conducting a survey of nuclear power plant staffing practices.
On July 14, I telephoned Jim Kenny of Licensing to describe this survey and solicit the participation of Susquehanna personnel.
On July 27, Mr. Kenny informed me that approval had been granted for Office of Nuclear Reactor Regulation staff and our contractors to visit your site on August 30 through September 1 for the purpose of conducting the survey.
Specifically, Ms. Tilda Liu (NRR), Mr.. Colin Carroll (Sonalyst),
and Ms. Deborah Shurburg (Brookhaven National Laboratory) will conduct the survey.
They will report to the site at 8:30 a.m.,
each day of the visit.
The purpose of this letter is to clearly identify the survey's objectives, the research team's planned activities at your site, and the support that will be required.
The objective of this survey is to gain insight into plant personnel workloads and the workload management strategies they use when responding to plant operational events.
The team's charter is to conduct a
- survey, not to evaluate regulatory compliance.
Specifically, the team intends to conduct the activities identified in the enclosure, at the Susquehanna site.
Keeping in mind that participation in this survey is voluntary, we have tried to limit the activities and involvement of your personnel, wherever possible, in order to minimize our impact on site staff workloads.
Following each activity listed in the enclosure, there is a description of the support that we are requesting.
Please review this information to verify the 2"=Goo~a 9408260196 940823 PDR ADOCK 05000387 S
PDR KC KE CKMKIICIIPV
Hr. Robert G.
Byram August 23, 1994 availability of requested personnel.
Should you determine that individuals will not be available, or should you have any questions concerning this
- survey, please have your staff contact me at (301) 504-1402.
We appreciate your support of this special survey.
Sincerely,
Enclosure:
Survey of Activities cc w/enclosure:
See next page Chet Poslusny, Jr.,
Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
,DISTRIBUTION:
'-Docket File~
NRC 8 Local PDRs PDI-2 Rdg.
SVarga CHiller HThadani HO'Brien CPoslusny JArildsen HSlosson OGC ACRS(10)
EWenzinger, RI
- JWhite, RI OFFICE IIAHE DATE PDI-2 LA MO'Br en PDI-2 M
CPoslusny:tlc P
2D(A Thadani OFFICIAL R CORD COPY FILENAME: A: RESURVEY. LTR
Hr. Robert G.
Byram August 23, 1994 availability of requested personnel.
Should you determine that individuals will not be available, or should you have any questions concerning this
- survey, please have your staff contact me at (301) 504-1402.
We appreciate your support of this special survey.
Sincerely,
Enclosure:
Survey of Activities
'c w/enclosure:
See next page Chet Poslusny, Jr., Project Nanager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Mr. Robert G.
Byram Pennsylvania Power
- 5. Light Company Susquehanna Steam Electric Station, Units 1
3 2
CC:
Jay Silberg,
- Esq, Shaw,
- Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power
- 5. Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U. S.
Nuc] ear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Enclosure STAFFING SURVEY PLANNED ACTIVITIES AND REQUESTED SUPPORT RESOURCES Activity Su ort Resources Brief site management on data collection August 30 Interested site management Conduct table tops of two scenarios Operations trainer and 1
SRO with recent shift experience August 31 Interviews and documentation review Interviews will be conducted with individuals who perform actions during emergency events.
Each interview should last 15 to 20 minutes (e.g.,
1 operator trainer, 1
health physicist (HP)/HP supervisor, 1 chemistry technician/ chemistry technician supervisor, maintenance technicians, EOP coordinator, security guard).
1 individual to assist in the collection of relevant documentation.
Operators/Operations Managers to collect data on staffing practices at the facility.
September 1
Walkdowns and talkthroughs with all support personnel relevant to normal back shift staffing levels 1 auxiliary operator to conduct walkdowns and talkthroughs.
Additional support personnel as needed to understand all procedural activities.
Fire brigade task walkdowns.