Forwards Insp Repts 50-387/94-11 & 50-388/94-12 on 940524-0718.No Violations Noted.Concern Re Quality of Engineering Review Involving Mod Process
ML17158A428
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/08/1994
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A429 List:
References
NUDOCS 9408150001
Download: ML17158A428 (4)


See also: IR 05000387/1994011

Text

Docket Nos.

50-387

50-388

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power Ec Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Byram:

SUBJECT:

NRC REGION I COMBINED INSPECTION 50-387/94-11; 50-388/94-12

The enclosed report documents a resident safety inspection conducted by Messrs. G. S.

Barber and D. J. Mannai, and others from May 24, 1994 through July 18, 1994, at the

Susquehanna

Steam Electric Station (SSES), Salem Township, Pennsylvania.

Areas relevant

to the health and safety of the public examined during the inspection are described in the

enclosed report.

At the conclusion of the inspection, Mr. G. S. Barber, Senior Resident

Inspector, summarized the inspection findings with Mr. Robert A. Breslin and other

members of your staff.

During the inspection period, your staff modified the Unit 2 Residual Heat Removal system

pump discharge check valves.

The modification contained a vendor design error which

resulted in draining of the 'B'oop of RHR. This vendor design error was not detected by

your staff during the modification implementation process.

We are concerned that the quality

of engineering review involving the modification process may not be sufficiently rigorous

relative to equipment design changes involving safety-related components,

We understand

this matter is still under review and evaluation by your staff.

Consequently,

we'consider this

matter unresolved pending our evaluation of your corrective actions.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosures willbe placed in the NRC Public Document Room.

No response to this letter

is required.

Your cooperation with us in this matter is appreciated.

Sincerely,

Oi~lQlf!AL SfGNED BY

B)YARD C. lIt/ERllNGER

Edward C Wenzinger

Chief

Reactor Projects Branch 2

PDR

0001

940808

9408'

6

CK 0800038'Bg

AUG 8 l99<

Enclosure:

1.

Combined NRC Inspection Report 50-387/94-11; 50-388/94-12

cc w/encl:

H. G. Stanley, Vice President - Nuclear Operations

G. T. Jones, Vice President - Nuclear Engineering

J. M. Kenny, Nuclear Licensing

M. M. Urioste, Nuclear Services Manager

J. M. Finnegan, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Inspection Reports (20) SALP

NRC Resident Inspector

Commonwealth of Pennsylvania

'?

AUG 8 l9od

bcc w/encl:

Region I Docket Room (with concurrences)

K. Gallagher, DRP

bcc w/encl (Via E-Mail):

W. Dean, OEDO

C. Poslusny, NRR Project Manager

C. Miller, PDI-2, NRR

M. Shannon, ILPB

F. Bower, III, DRS, Reactor Engineer

C. Marschall, Salem/HC SRI (Section 2.2. 1)

G.

J.

te

enzinger

7/26/94

//4

94

OFFICIALRECORD COPY

a:sus9411.ir