Docket Nos.
50-387
.and 50-388
~
~
~
Mr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Byram:
July 14, 1994 SUBJECT'USQUEHANNA STEAM ELECTRIC STATION (SSES)
UNITS 1
AND 2 -
RESPONSE
TO NRC BULLETIN 93-02, SUPPLEMENT 1, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS.
H86624 AND M86625)
This letter acknowledges receipt of your 60-day response dated April 19,
- 1994, and a supplemental response dated June 17, 1994, to NRC Bulletin 93-02, Supplement 1 (Bulletin).
The Bulletin was issued February 18, 1994, for action to all Boiling Water Reactor (BWR) licensees, and for information to all Pressurized Water Reactor (PWR) licensees.
The purpose of the Bulletin was to inform BWR and PWR licensees about the vulnerability of ECCS suction strainers in BWRs and containment sumps in PWRs to clogging during the recirculation phase of a loss-of-coolant accident (LOCA), to request that BWR licensees take the appropriate actions to ensure reliability of the ECCS in view of the information discussed in this bulletin supplement, and to require that BWR licensees report to the NRC on the requested actions taken.
Your response adequately addressed the actions you have taken to assure the operability of ECCS recirculation.
We will await your report on operator requalification training which is scheduled to be completed by mid-August of this year.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regard to this issue.
Should you have any questions, please contact me at (301) 504-1402 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.
9407210308 940714 I
PDR ADOCK 05000387 P
" PDR(
cc:
See next page DISTRIBUTION:
~Docket-f i.leJ NRC
& Local PDRs PDI-2 Rdg.
SVarga JCalvo CMiller,"
MO'Brien(2)
CPoslusny JHickman RElliot OGC ACRS 10 EWenzinger, RGN-I
- JWhite, RGN-I Sincerely, /S/
Chester Poslusny, Jr.,
Senior Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OFFICE PH: PDI B:S D:PDI-2 kAHE DATE 94 CPoslusn :tlc RJ R
TT
))
94 CNi14 l~ 94 COPY Yes/No Yes/No Yes/No Yes/No Yes/No OFFICIAL RECORD COPY
~ Qg~
FILENAME:a:~I,SU86624.GEN
~
~
4
pe REGIJ Cq
+
0 Cy 0
Cy Yr
~O
++**+
Docket Nos.
50-387 and 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 July 14, 1994 Hr. Robert G. Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Hr. Byram:
SUBJECT:
SUS(UEHANNA STEAM ELECTRIC STATION (SSES)
UNITS 1
AND 2 -
RESPONSE
TO NRC BULLETIN 93-02, SUPPLEHENT 1, "DEBRIS PLUGGING OF EHERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS.
H86624 AND H86625)
This letter acknowledges receipt of your 60-day response dated April 19,
- 1994, and a supplemental response dated June 17, 1994, to NRC Bulletin 93-02, Supplement 1 (Bulletin).
The Bulletin was issued February 18, 1994, for action to all Boiling Mater Reactor (BWR) licensees, and for information to all Pressurized Water Reactor (PWR) licensees.
The purpose of the Bulletin was to inform BWR and PWR licensees about the vulnerability of ECCS suction strainers in BWRs and containment sumps in PWRs to clogging during the recirculation'phase of a loss-of-coolant accident (LOCA), to request that BWR licensees take the appropriate actions to ensure reliability of the ECCS in view of the information discussed in this bulletin supplement, and to,require that BWR licensees report to the NRC on the requested actions taken.
Your response adequately addressed the actions you have taken to assure the operability of ECCS recirculation.
We will await your report on operator requalificatio'n training which is scheduled to be completed by mid-August of this year.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regard to this issue.
Should you have any questions, please contact me at (301) 504-1402 or the lead Project Hanager for this issue, John B. Hickman, at (301) 504-3017.
Sincerely, cc:
See next page Chester Poslusny, Jr.,
Senior Project Hanager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
~
~
~
~
t Mr'. Robert G.
Byram Pennsylvania Power
& Light Company Susquehanna Steam Electric Station, Units 1
& 2 CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp,
- Esq, Assistant Corporate Counsel Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania l8101 Mr. Scott Barber Senior Resident Inspector U.
S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P.
0.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Ti,lton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G'. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania
,18101