ML17158A203

From kanterella
Jump to navigation Jump to search
Informs That Written Licensing Exam & Operating Test Is Scheduled for Week of 940808,per 940404 Telcon Between J Williams & B Stitt
ML17158A203
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/05/1994
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9404120007
Download: ML17158A203 (3)


Text

QPP 5

Lop~

Docket Nos.

50-387 50-388 Mr. Robert G. Byram Senior Vice President - Nuclear Pennsylvania Power &Light Company, 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Byram:

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION-SUSQUEHANNA In a telephone conversation on April 4, 1994, between Mr. J. Williams and Mr. B. Stitt, arrangements were made for the administration of licensing examination at the Susquehanna Steam Electric Station.

The written examination and operating test is scheduled for the week of August 8, 1994.

Your staff willbe given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards,"

(ES-201, Attachment 4).

To prepare the examinations and meet the above schedule, it willbe necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by June 8. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.

The NRC willprepare and administer the written examination in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examination, it willbe necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examination is described in ES-402, Attachment 1.

The NRC willprepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating test, it willbe necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g,, system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

",. ~ g." 64 940m>20007 9OOO05 PDR ADOCK 05000387 V

PDR

APP 5 l9P!

Mr. Robert G. Bryam ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that willbe in effect while the written examination and operating tests are being administered.

Your staff should submit the preliminary senior reactor operator license application and any waiver request at least 30 days before the examination date so that the NRC willbe able to review the application and the medical certification and evaluate any requested waivers. If the application is not received at least 30 days before the examination date, a postponement may be necessary.

A final, signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per

response, includes gathering, xeroxing, and mailing the required material.

Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter.

Mr. Stitt has been advised of the NRC

'guidelines and policies addressed in this letter. Ifyou have any questions on the evaluation

process, please contact me at (610) 337-5211.

Sincerely, Glenn W. Meyer, Chief BWR/PWR Section, Operations Branch Division of Reactor Safety

APR 5 1994 Mr. Robert G. Bryam CC:

H. G. Stanley, Vice President - Nuclear Operations J. M. Kenny, Nuclear Licensing G. T. Jones, Vice President - Nuclear Engineering B. Stitt, Training Manager, PP&L M. M. Urioste, Nuclear Services Manager D. F. McGann, Supervisor, Nuclear Compliance H. D. Woodeshick, Special Office of the President J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Informatiori Center (NSIC)

K. Abraham, PAO (2) Inspection Reports (20) SALP NRC Resident Inspector Commonwealth of Pennsylvania bcc:

Region I Docket Room (with concurrences)

K. Gallagher, DRP V. McCree, OEDO R. Clark, Project Manager, NRR C. Miller, PDI-2, NRR OL Facility File DRS Files (2)

RI:DRS Williams 4/5/94 RI:DRS Meyer 4/+/94 OFFICIALRECORD COPY A:SUSEXAM.LTR