Amends 132 & 99 to Licenses NPF-14 & NPF-22,respectively, Change TSs to Revise Isolation Setpoints for Ambient Temp Switches for HPCI & Rcics Room Area Coolers
ML17158A112
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/31/1994
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17158A113 List:
References
NUDOCS 9402040273
Download: ML17158A112 (11)


Text

Wp0 Cy I

0 I

UI P r Cp l7 0

~+*<<~

UNITED STATES

" NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS(UUEHAiNA STEAN ELECTRIC STATION UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

132 License No. NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power 8

Light Company, dated January 9,

1991, and its supplements dated August 19,
1991, June 22,
1992, and August 3,
1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9402040273 940131 PDR ADOCK 050i00387

,P

'DR,

)

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.

NPF-14 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

132 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

january 31, 1994

@au@ g /)7M Charles L. Hiller, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NO.

132 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

The overleaf page is provided to maintain document completeness.*

REMOVE 3/4 3-19 3/4 3-20 INSER~

3/4 3-19 3/4 3-20*

U)C V)DC z

ZZ I

CZ

'"-""TRIP FUNCTION

~,l;',":;..,'.TRIP SETPOINT.';.:'">,::.",".,'...'."";~,

".f::,>::;,.':::"',:.':.,r~. ALlOWABLEVALtjE'"-;.:';"',";.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION IContinuedl d.

RCIC Equipment Room Temperature

- High e.

RCIC Equipment Room h Temperature

- High 167oF" o 89oF 174oF" S 984F

", 'TABLE-'3;:3;:2-2:(Continued) '::.::;-: '::.-;::"'.- "-:,"..'-

-;::~<",::::,"-"="-".::".,':!,.:".;:-::';~;::;."

ISOLATION.ACTUATION.INSTRUMENTATlON::SETPOINTS"..;:-'::;:.<,":,';"'.:;-~",;:;."',"::::.'-::::":,'~:'"..,";,",'.'.';;..'";;;".,:,'.

CD D

rD 6) f.

RCIC Pipe Routing Area Temperature - High g.

RCIC Pipe Routing Area b Temperature

- High h.

RCIC Emergency Area Cooler Temp. - High i.

Manual Initiation j.

Drywell Pressure - High 6.

HIGH PRESSURE COOLANT INJECTION SYSTEM ISOLATION a.

HPCI Steam Line Flow - High b.

HPCI Steam Supply Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure-High d.

HPCI Equipment Room Temperature - High e.

HPCI Equipment Room h Temperature - High f.

HPCI Emergency Area Cooler Temp. - High g.

HPCI Pipe Routing Area Temperature - High 6 1674F¹¹ 89oF¹¹ 6 1674F NA 6 1.72 psig 6 350 inches H~O M 104 psig 6 10psig 167oF 89oF 167oF 6 1674F¹¹ 174oF¹¹ 984F¹¹~

6 1744F NA

~ 1.88 psig 6 367 inches H,O

~ 90psig 6 20 psig 174oF OBOF 6 1744F 6 1744F¹¹

" These trip'functions need,not be OPERABLE;from'October'19, 1989'to January 19;,1990 Z0

rh CO0C ZK CK TABLE3.3.2-2 {Continued)

ISOLATIONACTUATIONINSTRUMENTATIONSETPOINTS Ca)

Ca)

O TRlP FUNCT1ON h.

HPCl Pipe Routing Area h Temperature - High Manual initiation j.

Drywall Pressure - High 7.

S QOLAJJIII a.

Reactor Vessel Water Level - Low, Level 3 b.

Reactor Vessel (RHR Cut-in Permissive)

Pressure - High c.

flHR Flow - High d.

Manual initiation e.

Drywall Pressure - High TRtP SETPOiNT 5 894FNN NA 5 1.72 psig h 13.0 inches' 98 psig 5 26,000 gpm NA 5 1.72 psig ALLOWABLEVALUE 5 98~FNN NA 5 1.88 psig 5 11.5 inches 5 108 psig 5 26,000 gpm 5 1.88 psig See Bases Figure B 3ll 3-1.

Lower setpointa for TSH<33-1NB00 E, F and TOSH-G33-1NB02 E, F.

NN 16 minute time delay.

This trip fuetlon need not be OPERABLE from October 19, 1989 to January 19, 1990.

(4go,w REGS

~o Op o

eg

+o

~0

+ +*+ +

0 'NITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTQN, D.C. 20555-000I PEN SYLVANIA POWER 8E LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENS Amendment No.

99 License No, NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power Light Company, dated January 9,

1991, and its supplements dated August 19,
1991, June 22,
1992, and August 3,
1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I',

B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.

NPF-22 is hereby amended to read as follows:

(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

99 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PP8L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COHHISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

january 31, 1994 Charles L. Hiller, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NO.

99 FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

The overleaf page is provided to maintain document completeness.*

~REROV 3/4 3-19 3/4 3-20

~INS RT 3/4 3-19 3/4 3-20*

0

]I

cnC (00C Z

z I

Cz

'RIP FUNCTION REACTOR CORE ISOLATIONCOOLING SYSTEM ISOLATIONIContlnued)

'i';":,j,":TRIP SETPOINT'."

.;;;
.ALLOWABLE:VAL'UE.i;..':.";.';

d.

RCIC Equipment Room Temperature

- High C 1674F s 174'F TABLE.3 3.2-2 (Continued}':>>;-:;::."':,';.':,",";, ":;:::;:<."-:i=:.':.;:...'...'-:;..",':,':..;.'":,,;;.".:.::,",'.:""::.;::: '," ". '";:::,.

ISOLATION'ACTUATIONINSTRUIIENTATIONSETPOINTS CD CD co z0 e.

RCIC Equipment Room d Temperature - High f.

RCIC Pipe Routing Area Temperature

- High g.

RCIC Pipe Routing Area h Temperature

- High h.

RCIC Emergency Area Cooler Temp. - High i.

Manual Initiation j.

Drywell Pressure

- High 6.

HIGH PRESSURE COOLANT INJECTION SYSTEM ISOLATION 6 894F 6 1674F¹¹ 89oF¹¹ 6 1674F NA 6 1.72 psig a.

HPCI Steam Line Flow - High b.

HPCI Steam Supply Pressure

- Low HPCI Turbine Exhaust Diaphragm Pressure-High d.

HPCI Equipment Room Temperature - High e.

HPCI Equipment Room 6 Temperature

- High f.

HPCI Emergency Area Cooler Temp. - High g.

HPCI Pipe Routing Area Temperature - High h.

HPCI Pipe Routing Area 6 Temperature

- High i.

Manual Initiation j.

Drywell Pressure

- High 6 275 inches H,O h 104 psig 6 10psig 6 1674F 6 894F 167oF 6 1674F¹¹ 6 894F¹¹ NA 6 1.72 psig

" These trip functions need not be OPERABLE from October 'l9,-1989 to January,19, 1990.'.'.

S 984F' 1744F¹¹ 984F¹¹4 174oF NA 6 1.88 psig 6 292 inches H~O

~ 90psig 6 20psig 6 1744F 98oF 6 1744F 174oF¹¹ 6 984F¹¹ NA 6 1.88 psig

Ql CA0C RK Cz=I TABLE3.3.2-2 (Colttlttuedl ISOLATIONACTUATIONINSTRUMENTATIONSETPOINTS Tfup FUNCTION 7.

flHR SYSTENI SHUTDOWN COOUNQ/HEAD SPRAY NIODE ISOLATION a.

Reactor Vessel Water Level - Low, Level 3 b.

Reactor Vessel (RHR Cut-in Permissive) Pressure

- High c.

RHR Flow - High d.

Manual Initiation e.

Orywall Pressure - High Sea Bases Figure 8 3/4 3-1.

Lower setpoints for TSH-G33-2N800 E, F and TOSH.G33-2N602 E, F.

16 minute time delay.

TNP SETPOINT R 13.0 inches S 98psig S 26,000 gpm S 1.72 psig ALLOWABLEVALUE 2 11.5 inches S 108 psig S 26,000 gpm NA S 1.88 psig