Forwards Insp Repts 50-387/93-22 & 50-388/93-22 on 931116-1231.No Violations Noted
ML17158A108
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/25/1994
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A109 List:
References
NUDOCS 9402040042
Download: ML17158A108 (4)


See also: IR 05000387/1993022

Text

r.

Docket Nos.

50-387

50-388

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power &Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Byram:

SUBJECT:

NRC REGION I COMBINED INSPECTION 50-387/93-22; 50-388/93-22

The enclosed report documents

a resident safety inspection conducted by Messrs.

G. S.

Barber and D. J. Mannai from November 16, 1993 through December 31, 1993, at the

Susquehanna

Steam Electric Station (SSES), Salem Township, Pennsylvania.

The inspection.

covered plant operations,

surveillance, and maintenance for both units. At the conclusion of

the inspection, Mr. G. S. Barber, Senior Resident Inspector, summarized the inspection

findings with Mr. H. G. Stanley and other members of your staff,

Areas examined during the inspection are important to public health and safety and are

identified in the report.

Within these areas,

the inspection consisted of selective

examinations of procedures

and representative

records, interviews with personnel,

and

observation of activities in progress.

The purpose of the inspection was to determine

whether NRC licensed activities were being conducted safely and in accordance with

regulatory requirements.

During Licensee Event Report (LER) review, the inspector noted

that your staff identified three cases of operations prohibited by Technical Specifications.

Your staff's identification and corrective actions relative to these matters were considered

a

strength.

Consequently,

we have exercised enforcement discretion in accordance with 10 CFR 2, Appendix C, Section VII.Band dispositioned the conditions as non-cited violations,

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosures willbe placed in the NRC Public Document Room.

Your cooperation with us in this matter is appreciated.

'Q(i()A5

Sincerely,

OPIIQltgL Sf GLACD Dy

EDWARD C. )VEHZINGER

Edward C. Wenzinger, Chief,

Reactor Projects Branch 2

9402040042

940125

PDR

ADQCK 05000387

8

PDR

Enclosure:

1.

Combined NRC Inspection Report 50-387/93-22; 50-388/93-22

cc w/encl:

H. G. Stanley, Vice President - Nuclear Operations

G. T. Jones, Vice President - Nuclear Engineering

J. M. Kenny, Nuclear Licensing

M. M. Urioste, Nuclear Services Manager

D. F. McGann, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Inspection Reports (20) SALP

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket Room (with concurrences)

bcc w/encl (Via E-Mail:

V. M'Cree, OEDO

R. Clark, NRR Project Manager

C. Miller, PDI-2, NRR

M. Shannon, ILPB

RI:DRP

G.S. Barber

01/18/94

RI:DRP

it

01~4

. Wenzinger

.K

OFFICIALRECORD COPY

A:SUS9322. GSB