Text
NOV 25 1992
Docket Nos.
50-387
50-388
Mr. H. W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power &Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
NRC REGION I COMBINED INSPECTION 50-387/92-25; 50-388/92-25
This letter transmits the results of safety inspections conducted by Messrs. G. S. Barber and
D. J. Mannai from September 29 through November 9, 1992, at the Susquehanna
Steam
Electric Station, Salem Township, Pennsylvania.
At the conclusion of the inspection, Mr.
Barber, Senior Resident Inspector, summarized the inspection findings with Mr. H. G.
Stanley, and other members, of your staff.
Areas examined during the inspection are important to public health and safety and included
plant operations, radiological controls, engineering, maintenance,
and surveillance for both
units.
Within these areas,
the inspection consisted of selective examinations of procedures
and records, interviews with personnel,
and observation of activities in progress.
The
purpose of the inspection was to determine whether NRC licensed activities were being
conducted safely and in accordance with regulatory requirements.
Based on the results of this
inspection, it appears that your staff conducted licensed activities in a safe manner during this
period.
Your staff's identification and corrective action relative to fire door operability determinations
was considered
a strength.
Your cooperation with us in this matter is appreciated.
Sincerely,
OQGIRAL S1GNEO SV;
Edward C. Wenzinger, Chief,
Reactor Projects Branch 2
Enclosure:
Combined NRC Inspection Report 50-387/92-25; 50-388/92-25
9212020055
921125
t
ADOCK 05000387
8
~ '
~
NOV 85 1992
cc w/encl:
R. G. Byram, Vice President, Nuclear Operations
H. G. Stanley, Superintendent of Plant - SSES
J. M. Kenny, Supervisor, Nuclear Licensing
R. M. Peal, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton III, Allegheny Electric Cooperative, Inc.
M. M. Urioste, Nuclear Services Manager, General Electric Company
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) Inspection Reports
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket Room (with concurrences)
J. White, DRP
E. Wenzinger, DRP
J. Raleigh, NRR Project Manager
J. Noggle, DRSS
V. McCree, OEDO
J. Trapp, DRS
E. Kelly, DRP
bcc w/Executive Summary Only:
W. Hehl, DRP
W. Hodges, DRS
W. Lanning, DRS
R. Cooper, DRSS
C. Miller, POI-2, NRR
D. Holody, EO
OFFICIALRECORD COPY
RI:
G..
ber
11/18/92
Ilg JP2
1/$92
nzinger
't
~
'll
4