Forwards Resident Safety Insp Repts 50-387/92-16 & 50-388/92-16 on 920601-0713 Re Overheating of Unit 1 Offgas Guard Bed.Concerns Raised Re Failure to Identify Installation Error During Previous Overheating on 870411
ML17157B952
Person / Time
Site: Susquehanna  
Issue date: 08/07/1992
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157B953 List:
References
NUDOCS 9208200145
Download: ML17157B952 (5)


See also: IR 05000387/1992016

Text

ACCFLm~rzD D>STjuam.row DzMOi~STH~Yraw SvSTZM

REGULATORY INFORMATION DISTR I BUT ION

SYSTEM

(R IDS)

CESSION

NBR: 'F2082001.45

DOC. DATE: 'Ti2/08/07

NOTARIZED:

NO

CIL: 50-387 Susquehanna

Steam ElectT ic Statiani

Unit

1

Pennsglva

50-388 Susquehanna

Steam Electric Statidni Unit 21

Pennsg lva

AUTH. NAME

AUTHOR AFFILIATION

MENZINGER. E. C.

Region

1

(Pas t 820201)

REC IP. NAME

REC IP IENT AFFILIATION

KEISERi H. W.

Pennsylvania

Pacer

5 Light Co.

DOCKET 5

05000387,

05000388

SUBJECT:

Forwards Resident

Safety

Insp Repts 50-387/92-ib

5

50-388/92-lb

on 920b01-0713 re overheating

oF Unit

1 offgas

guard

bed. Concerns

raised

re failure to identify

installation error during previous

overheating

on 870411.

DISTRIBUTION CDDE:

IEOID

CDPIES RECEIVED: LTR f

ENCL J

SIZE

3 +

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES: LPDR

1

cg Transcripts.

)

MAXWELL>G

LPDR

1

c g

Trans cripts.;

MAXMELLIG

05000387

05000388

A

RECIPIENT

ID CODE/NAME

PD1-2

PD

COPIES

LTTR ENCL

1

I

RECIPIENT

ID CODE/NAME

RALEIGHr J.

COPIES

LTTR ENCL

INTERNAL:

ACRS

AEOD/DEI I8

DEDRO

NRR/DLPG/LHFBPT

NRR/DOEA/OEAB"'RR

/P MAS/ILRB 12

OE DIR

gRKC FILI:

02

EXTERNAL:

EGA.Q/BRYCE~ J. H.

NSIC

2

2

1

1

1

1

1

1

1

1

1

AEOD

AEOD/DSP/TPAB

NRR

MOR ISSEAUI 0

NRR /DLP8/LP EB 10

NRR/DREP/PEPB'AH

NUDOCS-ABSTRACT

OQC/HDS2

RGN1

F ILE

01

NRC

PDR

2

2

NOTE TO ALL "RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DOib'T NEED!

TOl AL NUMBER OF

COP IES REGUlRED

LTTR

2II

ENCL

'

AU~ p~ 1S92

Docket Nos.

50-387

50-388

Mr. H. W. Keiser

Senior Vice President - Nuclear

Pennsylvania Power & Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Keiser:

Subject:

NRC REGION I COMBINED INSPECTION 50-387/92-16; 50-388/92-16

The enclosed report documents

a resident safety inspection conducted by Messrs.

G. S. Barber and D. J. Mannai, and others from June 1, 1992 through July 13, 1992, at the

Susquehanna

Steam Electric Station (SSES), Salem Township, Pennsylvania.

The inspection

covered plant operations, surveillance, and maintenance for both units. At the conclusion of

the -inspection, Mr. G..S. Barber, Senior Resident Inspector, summarized the inspection

findings with Mr. H. G. Stanley and other members of your staff.

During this inspection, we focused particular attention to the overheating of the Unit 1 "B"

offgas guard bed.

We recognized that, as a result of this occurrence, your staff initiated an

aggressive investigation effort to identify root causes and corrective actions.

Your efforts

were comprehensive

and thorough.

As a result of your Event Review Team's (ERT) investigation, several root causes and actions

to prevent recurrence were identified.

Among these was an inadequacy pertaining to the

physical orientation of the drain traps that were designed to minimize liquid intrusion into the

offgas guard bed.

In addition to this orientation error, your staff also found that the elevation

differences of the traps would have precluded proper draining.

We are particularly concerned

with this finding since you did not identify this installation error during your investigation of

a past similar guard bed overheating that occurred on April 11, 1987.

However, we noted

that your current root cause identification program is significantly better than the 1987

program and that you promptly identified and corrected the drain trap installation errors.

We

also noted you wilLreview the drain trap installation configurations for other plant systems.

Based on the positive actions you have taken, a non-cited violation is appropriate in this case.

OFF~~gL ~~~)~

9208200145

920807

D CO~V

PDR

ADOCK 05000387

PDR

AUG pp)g

Your cooperation with us in this matter is appreciated.

Sincerely,

QReltet. gee~ gy:

Edward C. Wenzinger, Chief,

Reactor Projects Branch 2

Enclosure:

1.

Combined NRC Inspection Report 50-387/92-16; 50-388/92-16

cc w/encl:

R. G. Byram, Vice President, Nuclear Operations

H. G. Stanley, Superintendent of Plant - SSES

J. M. Kenny, Supervisor, Nuclear Licensing

R. M. Peal, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Inspection Reports

NRC Resident Inspector

Commonwealth of Pennsylvania

OFFjCNLRECOAD COPY

RUG 07 egg

bcc w/encl:

Region I Docket Room (with concurrences)

J. White, DRP

E. Wenzinger, DRP

J. J. Raleigh, NRR Project Manager

J. Noggle, DRSS

R. Lobel, OEDO

J. Trapp, DRS

R. Jones, NRR, Chief SRXB (Section 8.2)

D. Haverkamp, TSS (Section 8.2)

P. Eapen, DRS (Section 8.2)

bcc w/Executive Summary Only:

W. Hehl, DRP

W. Hodges, DRS

W. Lanning, DRS

R. Cooper, DRSS

J. Joyner, DRSS

C. Miller, PDI-2, NRR

D. Holody, EO

RI:DRP

G.. Barber

/2f/92

RI:DRP

J.R.

'

g P'/5/92

Wenzinger

Ojt/ t/92

. OFFICIALRECORD COPY