ML17157B952
| ML17157B952 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/07/1992 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157B953 | List: |
| References | |
| NUDOCS 9208200145 | |
| Download: ML17157B952 (5) | |
See also: IR 05000387/1992016
Text
ACCFLm~rzD D>STjuam.row DzMOi~STH~Yraw SvSTZM
REGULATORY INFORMATION DISTR I BUT ION
SYSTEM
(R IDS)
CESSION
NBR: 'F2082001.45
DOC. DATE: 'Ti2/08/07
NOTARIZED:
NO
CIL: 50-387 Susquehanna
Steam ElectT ic Statiani
Unit
1
Pennsglva
50-388 Susquehanna
Steam Electric Statidni Unit 21
Pennsg lva
AUTH. NAME
AUTHOR AFFILIATION
MENZINGER. E. C.
Region
1
(Pas t 820201)
REC IP. NAME
REC IP IENT AFFILIATION
KEISERi H. W.
Pacer
5 Light Co.
DOCKET 5
05000387,
05000388
SUBJECT:
Forwards Resident
Safety
Insp Repts 50-387/92-ib
5
50-388/92-lb
on 920b01-0713 re overheating
oF Unit
1 offgas
guard
bed. Concerns
raised
re failure to identify
installation error during previous
overheating
on 870411.
DISTRIBUTION CDDE:
IEOID
CDPIES RECEIVED: LTR f
ENCL J
SIZE
3 +
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: LPDR
1
cg Transcripts.
)
MAXWELL>G
LPDR
1
c g
Trans cripts.;
MAXMELLIG
05000387
05000388
A
RECIPIENT
ID CODE/NAME
PD1-2
COPIES
LTTR ENCL
1
I
RECIPIENT
ID CODE/NAME
RALEIGHr J.
COPIES
LTTR ENCL
INTERNAL:
AEOD/DEI I8
DEDRO
NRR/DLPG/LHFBPT
NRR/DOEA/OEAB"'RR
/P MAS/ILRB 12
OE DIR
gRKC FILI:
02
EXTERNAL:
EGA.Q/BRYCE~ J. H.
2
2
1
1
1
1
1
1
1
1
1
AEOD/DSP/TPAB
MOR ISSEAUI 0
NRR /DLP8/LP EB 10
NRR/DREP/PEPB'AH
NUDOCS-ABSTRACT
OQC/HDS2
RGN1
F ILE
01
NRC
2
2
NOTE TO ALL "RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DOib'T NEED!
TOl AL NUMBER OF
COP IES REGUlRED
LTTR
2II
ENCL
'
AU~ p~ 1S92
Docket Nos.
50-387
50-388
Mr. H. W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power & Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
NRC REGION I COMBINED INSPECTION 50-387/92-16; 50-388/92-16
The enclosed report documents
a resident safety inspection conducted by Messrs.
G. S. Barber and D. J. Mannai, and others from June 1, 1992 through July 13, 1992, at the
Susquehanna
Steam Electric Station (SSES), Salem Township, Pennsylvania.
The inspection
covered plant operations, surveillance, and maintenance for both units. At the conclusion of
the -inspection, Mr. G..S. Barber, Senior Resident Inspector, summarized the inspection
findings with Mr. H. G. Stanley and other members of your staff.
During this inspection, we focused particular attention to the overheating of the Unit 1 "B"
offgas guard bed.
We recognized that, as a result of this occurrence, your staff initiated an
aggressive investigation effort to identify root causes and corrective actions.
Your efforts
were comprehensive
and thorough.
As a result of your Event Review Team's (ERT) investigation, several root causes and actions
to prevent recurrence were identified.
Among these was an inadequacy pertaining to the
physical orientation of the drain traps that were designed to minimize liquid intrusion into the
offgas guard bed.
In addition to this orientation error, your staff also found that the elevation
differences of the traps would have precluded proper draining.
We are particularly concerned
with this finding since you did not identify this installation error during your investigation of
a past similar guard bed overheating that occurred on April 11, 1987.
However, we noted
that your current root cause identification program is significantly better than the 1987
program and that you promptly identified and corrected the drain trap installation errors.
We
also noted you wilLreview the drain trap installation configurations for other plant systems.
Based on the positive actions you have taken, a non-cited violation is appropriate in this case.
OFF~~gL ~~~)~
9208200145
920807
D CO~V
ADOCK 05000387
AUG pp)g
Your cooperation with us in this matter is appreciated.
Sincerely,
QReltet. gee~ gy:
Edward C. Wenzinger, Chief,
Reactor Projects Branch 2
Enclosure:
1.
Combined NRC Inspection Report 50-387/92-16; 50-388/92-16
cc w/encl:
R. G. Byram, Vice President, Nuclear Operations
H. G. Stanley, Superintendent of Plant - SSES
J. M. Kenny, Supervisor, Nuclear Licensing
R. M. Peal, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) Inspection Reports
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFjCNLRECOAD COPY
RUG 07 egg
bcc w/encl:
Region I Docket Room (with concurrences)
J. White, DRP
E. Wenzinger, DRP
J. J. Raleigh, NRR Project Manager
J. Noggle, DRSS
R. Lobel, OEDO
J. Trapp, DRS
R. Jones, NRR, Chief SRXB (Section 8.2)
D. Haverkamp, TSS (Section 8.2)
P. Eapen, DRS (Section 8.2)
bcc w/Executive Summary Only:
W. Hehl, DRP
W. Hodges, DRS
W. Lanning, DRS
R. Cooper, DRSS
J. Joyner, DRSS
C. Miller, PDI-2, NRR
D. Holody, EO
RI:DRP
G.. Barber
/2f/92
RI:DRP
J.R.
'
g P'/5/92
Wenzinger
Ojt/ t/92
. OFFICIALRECORD COPY