ML17157B911

From kanterella
Jump to navigation Jump to search
Amend 122 to License NPF-14,changing TS to Correct Flow Dependent MCPR Operating Limits to Be Consistent W/Licensee NRC-approved Methodology
ML17157B911
Person / Time
Site: Susquehanna 
Issue date: 07/14/1992
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17157B912 List:
References
NUDOCS 9207230097
Download: ML17157B911 (6)


Text

'gS AEgy (4

P0 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

122 License No.

NPF-14 1.

The Nuclear Regulatory Commission (theCommission or the NRC) having found that:

A. The application for the amendment filed by the Pennsylvania Power 5

Light Company, dated May 21, 1992 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9207230097 9207i4 PDR ADOCK 05000387 P

PDR

P Jl

2.

Accordingly, the license is amended by changes to the Technical Specifica tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No ~ NPF-14 is hereby amended to read as follows:

(2) Technical S ecifications and Environmental Protection'lan The Technical Specifications contained in Appendix A, as revised through Amendment No. 122 and the Environmental Protection Plan con tained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifica tions and the Environmental Protection Plan

~

3.

This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance FOR THE NUCLEAR REGULATORY COMHISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

Ju]y 14 1992 Charles LE Hiller, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NO. 122 FACILITY OPERATING LICENSE NO.

NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised page.is identified by Amendment number and contains vertical lines indicating the area of change.

The overleaf page is provided to maintain document completeness.*

REMOVE 3/4 2-9 3/4 2-9a*

INSERT 3/4 2-9 3/4 2-9a*

2.0 1.9 (30,1.92) 1.8 (37,1.76)

- E

~~

1 7 Cb

.E 18 Q.

O 16 lK lL O

1.4 1.3 (46,1.B2)

(6O,1.46)

P2.8,1.36)

(100,1.36)

'1,2 1.1 30 40 60 eo 70 80 80 Total Cora FIow (% OF RATED)

FLOW DEPENDENT MCPR OPERATING LIMIT FIGURE 3.2.3-1 100

2.0 1.8 E

1.7 Cb C

e 16 CL O

CC D

1.5 (25,1.72}

(40,1.59)

Legend CURVE A: MINIMUMALLOWABLESCRAM SPEED FROM T.S. 3.1.3.3 CURVE B: AVERAGE SCRAM SPEED ~ 4.4 ft/sec (65.1.43) 1.4 1.3 (65,1.42)

(66.9,1.42)

(76.1,1.35)

-A-(100,1.42) 8 (100,1.35) 1.2 20 30 80 40 50 60 70 Core Power (% RATED)

POWER DEPENDENT MCPR OPERATING LIMIT EOC-RPT AND MAINTURBINE BYPASS OPERABLE FIGURE 3.2.3-2 90 100