ML17157B873
| ML17157B873 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/24/1992 |
| From: | Maxwell G Office of Nuclear Reactor Regulation |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157B874 | List: |
| References | |
| TAC-M81321, TAC-M81322, NUDOCS 9207020249 | |
| Download: ML17157B873 (6) | |
Text
Docket Nos.
50-387 and 50-388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Keiser:
June 24.
1992
SUBJECT:
TYPE "A" OVERALL INTEGRATED CONTAINMENT LEAKAGE RATE TESTING TECHNICAL SPECIFICATION CHANGES, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
M81321 AND M81322)
The Commission has issued the enclosed Amendment No.
121 to Facility Operating License No.
NPF-14 and Amendment No.
89 to Facility Operating License No.
NPF-22 for the Susquehanna Steam Electric Station, Units 1
and 2.
These amendments are in response to your letter dated August 16, 1991 and supplemented by letter dated May 29, 1992.
A copy of our Safety Evaluation and Notice of Partial Withdrawal is also enclosed.
Notice of Issuance will be published in the Commission's Biweekly Federal
~Re ister Notice and the Notice of Partial Withdrawal will be published separately in the Federal Re<eister.
Sincerely,
/S/
George F. Maxwell, Acting Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation 4C2P 9'2Qb24 pop ADOC
'DR QesFQQQ387 p
n 2.
Amendment No.
89 to License No.
NPF-22 3.
Safety Evaluation 4.
Notice of Partial Withdrawal cc w/enclosures:
See next page DISTRIBUTION:
Docket Fi1 e~
MO'Brien(2)
NRC 8 Local PDRs GMaxwell PDI-2 Reading OGC SVarga
- DHagan, 3206 JCalvo GHill(8), Pl-22 CMiller Wanda Jones, 7103
- Previous Concurrence IRC 861I;KmlIBI'II'Pv
- CGrimes, 11E21 'White, RGN-I Tech Branch
'CRS(10)
GPA/PA OC/LFMB EWenzinger, RGN-I
C n
- GM
-2/
- +OGC
.r
- C y g
- C c rac en
/ g2:b,/Q/92:0 06 92: (/ts//92:06/09/92 ocument arne:
A:
8132
.A 0
0 pO~
LOOBY ol 2 6 These amendments revise the Technical Specification 4.6. 1.2.a and the associated bases to incorporate an exemption to appendix J of 10 CFR part 50 that removes the requirement that the third Type "A" Overall Integrated Containment Leakage Rate test required in each 10-year service period is to be conducted at the 10-year inservice inspection interval.
ij
~,P,it RE0IF 0
co A.nO i
ws
, Pi th cs
+rg t7 +**<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 24.
1992 Docket Nos.
50-387 and 50-388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Keiser:
SUBJECT:
TYPE "A" OVERALL INTEGRATED CONTAINMENT LEAKAGE RATE TESTING TECHNICAL SPECIFICATION CHANGES, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
M81321 AND M81322)
The Commission has issued the enclosed Amendment No.
121 to Facility Operating License No.
NPF-14 and Amendment No.
89 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Units 1 and 2.
These amendments are in response to your letter dated August 16, 1991 and supplemented by letter dated May 29, 1992.
These amendments revise the Technical Specification 4.6. 1.2.a and the associated bases to incorporate an exemption to appendix J of 10 CFR part 50 that removes the requirement that the third Type "A" Overall Integrated Containment Leakage Rate test required in each 10-year service period is to be conducted at the 10-year inservice inspection interval.
A copy of our Safety Evaluation and Notice of Partial Withdrawal is also enclosed.
Notice of Issuance will be published in the Commission's Biweekly Federal Re<eister Notice and the Notice of Partial Withdrawal will be published separately in the Federal Reciister.
Sincerely,
Enclosures:
l.
Amendment No.
121 to License No.
NPF-14 2.
Amendment No.
89 to License No. NPF-22 3.
Safety Evaluation 4.
Notice of Partial Withdrawal George F. Maxwell, cting Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/enclosures:
See next page
Mr. Harold W. Keiser Pennsylvania Power
& Light Company Susquehanna Steam Electric Station, Units 1
& 2 CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P.
O.
Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company 1009 Fowles Avenue Berwick, Pennsylvania 18603 Mr. Robert G.
Byram Vice President-Nuclear Operations Pennsylvania Power'nd Light Company 2 North Ninth Street Allentown, Pennsylvania 18101