Text
JUil 1 g iggp
Docket Nos.
50-387
50-388
Mr. H. W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power &Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
NRC REGION I COMBINED INSPECTION 50-387/92-15; 50-388/92-15
The enclosed report documents a resident safety inspection conducted by Messrs. G. S.
-Barber and D. J. Mannai from April 19, 1992 through May 31, 1992, at the Susquehanna
Steam Electric Station (SSES), Salem Township, Pennsylvania.
The inspection covered plant
operations, surveillance, and maintenance for both units.
At the conclusion of the inspection,
Mr. G. S. Barber, Senior Resident Inspector, summarized the inspection findings with Mr.
H. G. Stanley and other members of your staff.
Areas examined during the inspection are important to public health and safety and are
identified in the report.
Within these areas,
the inspection consisted of selective examinations
of procedures
and representative
records, interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection was to determine whether NRC licensed
activities were being conducted safely and in accordance with regulatory requirements.
Based
on the results of this inspection, it appears that your staff conducted licensed activities in a
safe manner during this period.
Your cooperation with us in this matter is appreciated.
Sincerely,
Edward C. Wenzinger, Chief,
Reactor Projects Branch 2
Enclosure:
1.
Combined NRC Inspection Report 50-387/92-15; 50-388/92-15
OCg OS000SS7
010048 920619
9
~op(
cc w/encl:
R. G. Byram, Vice President, Nuclear Operations
- H. G: Stanley, Superintendent of Plant - SSES
J. M. Kenny, Supervisor, Nuclear Licensing
R. M. Peal, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) Inspection Reports
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket Room (with 'concurrences)
J. White, DRP
E. Wenzinger, DRP
G. Maxwell, (Acting) NRR Project Manager-
J. Noggle, DRSS
R. Lobel, OEDO
J. Trapp, DRS
bcc w/Executive Summary Only:
W. Hehl, DRP
W. Hodges, DRS
W. Lanning; DRS
R. Cooper, DRSS
C. Miller, POI-2, NRR
P'
B
'06
2/92
ber
J.R.
h'
6/r $92
= E.
enzinger
06/g/92
OFFICIALRECORD COPY