Informs of Plans to Send Contractor to Visit Plant on 920610-11 Re risk-based Insp Guide Published as NUREG Under USNRC Technical Assistance Program W/Natl Labs
ML17157B828
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/02/1992
From: Raleigh J
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157B829 List:
References
NUDOCS 9206100190
Download: ML17157B828 (4)


Text

Dncket Nos.

50-387 and 50-388 1

Hr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Hr. Keiser:

June 2,

1992

SUBJECT:

RISK-BASED INSPECTION GUIDE, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 This is in reference to the development of the Risk-Based Inspection Guide (RIG) to be published as a

NUREG under the USNRC Technical Assistance Program with National Laboratories.

The RIGs are intended to provide useful guidance for inspection activities.

The purpose of this letter is to inform you that we are planning to send our contractor to visit your plant, Susquehanna, on June 10-11, 1992.

The visiting contractor will accompany the resident inspector in a system walkdown and verify the accuracy of the information.

During this visit, it will be desirable to have comments from you regarding the RIG in order to reflect your plant status accurately.

However, we would like to clarify that your participation during the visit will be strictly voluntary.

We are enclosing a

draft copy of the RIG, and if you choose to participate during the visit, please inform me and the RIG Project Coordinator, Dr. Jin Chung (301-504-1071).

Your cooperation with us in this matter is appreciated.

Sincerely,

/S/

James J. Raleigh, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Draft copy of RIG cc w/enclosure:

See next page

,~T

/

P Docket File+

NRC

& Local PDRs PDI-2 Reading DISTRIBUTION w/o enclosure:

SVarga HO'Brien(2)

WBeckner, 10E-4 JCalvo JRaleigh
KCampe, 10E-4 CMiller OGC JChun 10E-4 le /~7' HEI ACRS(10)
JWhite, RGN-I
CHehl, RGN-I EWenzin er, RGN-I OFFICE PDI-2 P

PDI-DATE H

E

/

2 JRALEIGH:

c CH R

/W92 uC /OW/92 OFFICIAL RECOR COPY FILENAME: A:iSU1&2..5IG, m06i00~~0 mOS02 PDR ADOCK 05000387 Q.

PDR

(

l, I

rf 5

ll A

u~,

L I

I r

II L

~gg RE0y 4(lg+

Wp.

Cy O

I 0

~O 0**40 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 2,

1992 Docket Nos.

50-387 and 50-388 Hr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Nr. Keiser:

SUBJECT:

RISK-BASED INSPECTION GUIDE, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 This is in reference to the development of the Risk-Based Inspection Guide (RIG) to be published as a

NUREG under the USNRC Technical Assistance Program with National Laboratories.

The RIGs are intended to provide useful guidance for inspection activities.

The purpose of this letter is to inform you that we are planning to send our contractor to visit your plant, Susquehanna, on June 10-11, 1992.

The visiting contractor will accompany the resident inspector in a system walkdown and verify the accuracy of the information.

During this visit, it will be desirable to have comments from you regarding the RIG in order to reflect your plant status accurately.

However, we would like to clarify that your participation during the visit will be strictly voluntary.

We are enclosing a

draft copy of the RIG, and if you choose to participate during the visit, please inform me and the RIG Project Coordinator, Dr. Jin Chung (301-504-1071).

Your cooperation with us in this matter is appreciated.

Sincerely,

Enclosure:

Draft copy of RIG cc w/enclosure:

See next page mes J. Raleigh, Project Hanager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Mr. Harold W. Keiser Pennsylvania Power 5 Light Company Susquehanna Steam Electric Station, Units 1 5 2 CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts

& Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power 3 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.

M. Kenny Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U.

S. Nuclear Regulatory Commission P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company 1009 Fowles Avenue Berwick, Pennsylvania 18603 Mr. Robert G.

Byram Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101