ML17157B086
| ML17157B086 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/11/1992 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157B087 | List: |
| References | |
| NUDOCS 9203190076 | |
| Download: ML17157B086 (3) | |
See also: IR 05000387/1992010
Text
Docket Nos.
50-387
50-388
gg f$ 892
Mr. Harold W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power and Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
SUBJECT:
MEETING TO DISCUSS LICENSEE ANALYSISAND EVALUATIONOF
OPERATOR REQUALIFICATIONISSUES (MEETING REPORT NOS.
50-387/92-10 AND 50-388/92-10)
This letter refers to the meeting held on February 14, 1992, at the NRC Region I office
conducted between Mr. Hodges, Director, Division of Reactor Safety, and Mr. Stanley,
Superintendent of Plant-SSES,
and other members of your staff.
The purpose of the meeting
was to discuss your actions in response to the weaknesses
identified during the NRC
evaluation of your licensed operator requalification program in January
1992.
Your staff presented
the results of your root cause analysis and planned corrective actions to
address
the weaknesses
in your licensed operator requalification program.
The NRC has
reviewed the information provided and has no further questions, therefore; it is no longer
necessary for you to provide the response
requested by the letter transmitting Examination
Report Nos. 50-387/92-01 and 50-388/92-01(OL), dated February 13, 1992.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosed report willbe placed in the NRC Public Document Room.
Sincerely,
Lee H. Bettenhausen,
Chief
Operations Branch
Division of Reactor Safety
9203190076
9203i i l
i'DR'DOCK
05000387
8
PDRi
Mr. Harold W. Keiser
Enclosure:
Meeting Report Nos. 50-387/92-10 and 50-388/92-10
with Attachments
1 - 4
Attachments:
1.
Manager - Nuclear Operations Presentation
2.
Event Review Team Root Cause Analysis
3.
Manager - Nuclear Training Presentation
4.
Evaluation and Response
Plan
cc w/encl and Attachments
1 - 4:
A. R. Sabol, Manager, Nuclear Quality Assurance
J. M. Kenny, Licensing Group Supervisor
H. G. Stanley, Superintendent of Plant-SSES
R. G. Bryam, Superintendent of Plant-SSES
J. A. Isabella, Director, Generation Projects Department, Atlantic Electric
M. M. Urioste, Nuclear Services Manager, General Electric Co.
B. A. Snapp, Esquire, Assistant Corporate Counsel
H. D. Woodeshick, Special Assistant to the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
W. Lowthert, Manager of Nuclear Training
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIALRECORD COPY
B:SSESMTG
&K:SSESMTG
Mr. Harold W. Keiser
bcc w/encl and Attachments
1 - 4:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl; w/o Attachments
1 - 4)
L. Bettenhausen,
J. Joyner, DRSS
J. White, DRP
R. Blough, DRP
B. Norris, DRP
R. Lobel, EDO
J. Raleigh, NRR
R. Gallo, OLB, NRR
R. Conte, DRS
T. Walker, DRS
OL Facility File
DRS Files (5)
RI:DRS
RI:DRS
W
er/dmg/ajk
C
te
034Ã/92
03///92
lo
RI:DRS
Be te hausen
03/J//92
OFFICIALRECORD COPY
B:SSESMTG
& K:SSESMTG