Docket Nos.

50-387

.

50-388

Pennsylvania Power &Light Company

AKIN: Mr. H. W. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Keiser:

Subject: NRC Region I Combined Inspection 50-387/92-02; 50-388/92-02 and

NOTICE OF VIOLATION

The enclosed report documents

a safety. inspection conducted by our senior resident inspector

from January

1, 1992 - February 10, 1992, at the Susquehanna

Steam Electric Station

(SSES), Salem Township, Pennsylvania.

The inspection covered your conduct of licensed

activities for both units. At the conclusion of the inspection, Mr. 6, S. Barber, Senior

Resident Inspector, summarized the inspection findings with Mr. T. C. Dalpiaz and other

members of your staff.

During this inspection, we focused particular attention to the hydrogen gas detonation event

of January

18, 1992, involving repair activities to the common off-gas recombiner system.

We recognized that, as a result of this occurrence,

your staff initiated an aggressive

investigation effort to identify root causes

and corrective actions.

We are satisfied that your

effort was sufficiently comprehensive

and thorough.

As a result of your investigation of this self-disclosing event, your staff identified several

weaknesses.'elative

to these findings, we are particularly concerned about (1) the apparent

ineffective incorporation of notifications, information, and communications of previous

industry events involving combustible gas hazards associated

with off-gas systems into

pertinent plant procedures

and practices;

(2) the failure to adequately track the status of the

1989 repair activity involving the globe valve (HV-16907) that was used to isolate the

common recombiner system in this instance;

and (3) the failure to adequately investigate the

cause for the unusual off-gas instrument indications on January

16. 1992, which were

apparently caused by a small hydrogen detonation at that time.

Relative to these matters, we

are continuing to review your process for handling generic communications and notifications

of previous industry events; and have identified the remaining items as apparent violations as

described in the enclosed Notice of Violation.

9203050011

920228

PDR

ADOCK 05000387

8

PDR

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response.

In accordance with 10 CFR 2.790 of the

NRC's "Rules of Practice," a copy of this letter and its enclosure willbe placed in the NRC

.Public Document Room.

Your cooperation with us in this matter is appreciated.

, Sincerely,

g,,-'.-ndy bioug~,)

A. Randolph Blough, Chief,

Reactor Projects Branch 2

Enclosure:

1.

Notice of Violation

2.

Combined NRC Inspection Report 50-387/92-02; 50-388/92-02

cc w/encl:

A. R. Sabol, Manager, Nuclear Quality Assurance

J. M. Kenny, Licensing Group Supervisor

H. G. Stanley, Superintendent of Plant - SSES

R. G. Byram, Vice President, Nuclear Operations

J.D D

J. A. Isabella, Director, Generation Projects Department

Atlantic Elect

ecker, Services Project Manager, General Electric Company

B. A. Snapp, Esquire, Assistant Corporate Counsel

H. D. Woodeshick, Special Office of the President

J., C. Tilton III, Allegheny Electric Cooperative, Inc.

W. Lowthert, Manager of Nuclear Training

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (20) SALP, AIT, Special Insp. Rpts. and (2) Inspection Rpts.

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. White, DRP

R. Blough, DRP

B. Norris, DRP

T. Johnson, Senior Resident Inspector, Salem/Hope Creek

J. Joyner, DRSS

E. L. Conner, DRP (SALP Reports Only)

J. J. Raleigh, NRR Project Manager

J. Noggle, DRSS

R. Lobel, OEDO

J. Trapp, DRS

bcc w/Executive Summary Only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

J. Durr, DRS

L. Bettenhausen,

DRS

M. Knapp, DRSS

C. Miller, PDI-2, NRR

RI:D

.S.

er

02/15/92

RI:D

J.R.

ite

"02/e)/92

RI:DRP

A.R. Blough

02/%92

OFFICIALRECORD COPY