Text
NOV 15
199'ocket
Nos.
50-387
50-388
Mr. Harold
W. Keiser
Senior
Vice President
Nuclear
Pennsylvinia
Power L Light Company
2 North Ninth Street
Al 1 entown,
Penn syl vani a
18101
Dear Mr. Kei ser:
Subject:
Combined Inspection
Nos.
50-387/91-17
and 50-388/91-17
This letter refers to the inspection
conducted
by Mr.
R.
Mathew and Mr. R. Paolino
of this office on August 5-9,
1991
and August 26 through September
5,
1991 at
the Susquehanna
Steam Electric Station
and at the Corpor'ate Office at, Allentown,
of activities authorized
by
NRC License
The results of this inspection
were discussed
with Mr; A. Male and other members
of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the
NRC Region I Inspection
Report which is enclosed with this letter and included your actions to resolve
16 previously identified concerns.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the .inspector.
Your corrective actions for
15 of 16 previously identified
NRC concerns
were found to be acceptable.
However,
one-item pertaining to the degraded
bus voltage set point study based
on worst
case relay drifting and other scenarios
identified in your Engineering
Discrepancy
Report
(EDR) G10091
remained
unresolved.
Your continued effort is required in
the timely resolution of this issue.
We understand
that you will perform the necessary
modifications,
as committed
by you, to resolve the previously identified items in this report.
If our
understanding
of your actions
regarding
these
matters is incorrect, notify
this office as
soon
as possible.
Within the, scope- of this inspection,
no
Your cooperation with us in this matter
violations were observed.
is appreciated.
Sincerely,
Jacque
P. Durr, Chief
Engineering
Branch
Division of Reactor Safety
Enclosure:
Combined
NRC Region I Inspection
Report Nos.
50-387/91-17
and 50-388/91-17
OFFICIAL RECORD
COPY
CIR SUSQ 91-17 - 0001.0.0
11/12/91
'Vlll26003i ilii>D
hPDG!( 050003D7
Q
PI>f(
NOV 15
1991
Power and Light Company
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
J.,M.
Kenny, Licensing Group Supervisor
H.
C. Stanley,
Superintendent
of Plant-SSES
R.
G. Byram, Superintendent
of Plant-SSES
S.
B. Ungerer,
Manager, Joint Generation
Projects
Department
J.
D. Decker,
Nuclear Services
Manager,
General
Electric Co.
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
D. Woodeshick,
Special Assistant to the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
K. Abraham,
PAO (2) All Inspection
Reports
NRC
Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket
Room (with concurrences)
. Management Assistant,
DRMA (w/o encl)
J. White,
R. Blough,
J. Trapp,
SALP Coordinator
R. Lobel,
EDO,
J.
Raleigh,
C. Miller, PDI-2,
R
- DRS
Matthew/cmm/lb
10/(@91
c/q
RI:DRS
Anderson
10/~~/91
RI:DRS
Durr
Pf//> /91
OFFICIAL RECORD
COPY
CIR SUSQ 91-17 " 0002.0.0
10/09/91