Forwards Insp Repts 50-387/91-17 & 50-388/91-17 on 910805-09.No Violations Noted.Continued Effort Required to Resolve Violations Re Degraded Bus Voltage Setpoint Study Based on Worst Case Relay Drifting & Other Scenarios
ML17157A940
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/15/1991
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157A941 List:
References
NUDOCS 9111260031
Download: ML17157A940 (2)


See also: IR 05000387/1991017

Text

NOV 15

199'ocket

Nos.

50-387

50-388

Mr. Harold

W. Keiser

Senior

Vice President

Nuclear

Pennsylvinia

Power L Light Company

2 North Ninth Street

Al 1 entown,

Penn syl vani a

18101

Dear Mr. Kei ser:

Subject:

Combined Inspection

Nos.

50-387/91-17

and 50-388/91-17

This letter refers to the inspection

conducted

by Mr.

R.

Mathew and Mr. R. Paolino

of this office on August 5-9,

1991

and August 26 through September

5,

1991 at

the Susquehanna

Steam Electric Station

and at the Corpor'ate Office at, Allentown,

Pennsylvania

of activities authorized

by

NRC License

Nos. 'NPF-14 and NPF-22.

The results of this inspection

were discussed

with Mr; A. Male and other members

of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I Inspection

Report which is enclosed with this letter and included your actions to resolve

16 previously identified concerns.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the .inspector.

Your corrective actions for

15 of 16 previously identified

NRC concerns

were found to be acceptable.

However,

one-item pertaining to the degraded

bus voltage set point study based

on worst

case relay drifting and other scenarios

identified in your Engineering

Discrepancy

Report

(EDR) G10091

remained

unresolved.

Your continued effort is required in

the timely resolution of this issue.

We understand

that you will perform the necessary

modifications,

as committed

by you, to resolve the previously identified items in this report.

If our

understanding

of your actions

regarding

these

matters is incorrect, notify

this office as

soon

as possible.

Within the, scope- of this inspection,

no

Your cooperation with us in this matter

violations were observed.

is appreciated.

Sincerely,

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

Combined

NRC Region I Inspection

Report Nos.

50-387/91-17

and 50-388/91-17

OFFICIAL RECORD

COPY

CIR SUSQ 91-17 - 0001.0.0

11/12/91

'Vlll26003i ilii>D

PDR

hPDG!( 050003D7

Q

PI>f(

NOV 15

1991

Pennsylvania

Power and Light Company

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear Quality Assurance

J.,M.

Kenny, Licensing Group Supervisor

H.

C. Stanley,

Superintendent

of Plant-SSES

R.

G. Byram, Superintendent

of Plant-SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department

J.

D. Decker,

Nuclear Services

Manager,

General

Electric Co.

B. A. Snapp,

Esquire, Assistant

Corporate

Counsel

H.

D. Woodeshick,

Special Assistant to the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

K. Abraham,

PAO (2) All Inspection

Reports

NRC

Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

. Management Assistant,

DRMA (w/o encl)

J. White,

DRP

R. Blough,

DRP

J. Trapp,

DRS

SALP Coordinator

R. Lobel,

EDO,

J.

Raleigh,

NRR

C. Miller, PDI-2,

NRR

R

DRS

Matthew/cmm/lb

10/(@91

c/q

RI:DRS

Anderson

10/~~/91

RI:DRS

Durr

Pf//> /91

OFFICIAL RECORD

COPY

CIR SUSQ 91-17 " 0002.0.0

10/09/91