ML17157A920
| ML17157A920 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/30/1991 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157A921 | List: |
| References | |
| NUDOCS 9111080208 | |
| Download: ML17157A920 (3) | |
See also: IR 05000387/1991019
Text
3 0
1991
Docket Nos.
50-387
50-388
License Nos,
NPF-22
Mr. Harold %. Keiser
Senior Vice President
- Nuclear
Pennsylvania Power 8c Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
Combined Inspection Nos.
50-387/91-19 and 50-388/91-19
This letter forwards the NRC report of the inspection of the annual, full-participation
t d on October 15-17, 1991 at jour Susquehanna
emergency preparendess
exercise, conducted on
cto er -,
a
Steam Electric Station. Preliminary findings were discussed by Mr. C. Conklin of t is o
ice
with Mr. R. Byram and other members of your staff,
Performance of the Pennsylvania Power 4, Ligh
p
y p
t Com an
ersonnel during the exercise
demonstrated
the
ability to
implement
the
Emergency
Plan
and
Emergency
Plan
Implementing
roce
ures in a m n
p
'
d
'anner that would provide adequate protective measures for
the health and safetyot t e pu
ic.
x r
'he
ublic. Exercise'strengths
were noted in event recognition an
l
'f'tion
notifications
to offsite agencies,
prioritization of tas
s,
eve opmen
Protective Action Recommendations, communications between e
g
y
p
mer enc
res
onse facilities,
s at the Media Operations Center. However, the Emergency Operations
h
Facility (EOF) ventilation system was not placed into recirculation
e ore
radioactive plume.
is action wou
Th'
ld have avoided relocation to the Alternate EOF. No
violations or exercise weaknesses
were identified.
No reply to this letter is indicated.
Thank you for your cooperation.
Sine
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
OC!
3 0 tggl,
4
Pennsylvania Power & Light Company,2
Enclosure:
Combined Inspection Report Nos. 50-387/91--19 and 50-388/91-19,
cc,w/encl:
.R. G. Byram, Vice President, Nuclear Operations
A. Sabol, Manager, Nuclear Quality Assurance
J. Kenny, Licensing Group Supervisor
H, G. Stanley,
up
Su erintendent of Plant - SSES
Pro'ects Department, Atlantic Electric
S. Ungerer, Manager, Joint Generation Projects
epar m
J. D. Decker, Nuclear Services Manager, General Electric Company
B. Snapp, Esquire, Assistant Corporate Counsel
H. V/oodeshick, Special Office of the President
J. Tilton, III, Allegheny Electric Cooperative, Inc.
K. Abraham, PAO (2)
Public Docket Room (PDR)
Local Public Docket Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
Pennsylvania Power & Light Company
bcc w/encl:
R
on I Docket Room (with concurrences)
egion
cl
Management Assistant, DRMA (w/o enc )
J. White, DRP
R. Blough, DRP
P. Kaufman, DRP
DRSS SALP Coordinator
R. Lobel, EDO
P. Cortland, NRR
0<T g 0 gr<~
Conklin
104/91
McCabe
g
10/ /91
Joy
10+/91
OFFICIALRECORD COPY