Text

OCT 1 P lggi

Docket Nos. 50-387

50-388

Pennsylvania Power & Light Company

ATTN: Mr. H. W. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Keiser:

Subject:

NRC Region I Combined Inspection 50-387/91-13; 50-388/91-13

The enclosed report documents

a routine safety inspection conducted by inspectors of this office on

August 13, 1991 - September 23, 1991, at the Susquehanna

Steam Electric Station (SSES), Salem

Township, Pennsylvania.

The inspection covered plant operations, surveillance, and maintenance

for both units. At the conclusion of the inspection, Mr. G. S. Barber, Senior Resident Inspector,

~

~

~

~

summarized the inspection findings with Mr. H. G. Stanley and other members of your staff.

Areas examined during the inspection are identified in the report.

Within these areas,

the inspection

consisted of selective examinations of procedures

and representative

records, interviews with

personnel,

and observation of activities in progress,

The purpose of the inspection was to determine

whether NRC licensed activities were being conducted safely and in accordance

with regulatory

requirements.

Based on the results of this inspection, it appears

that your staff conducted licensed

activities in a safe manner during this period.

Your cooperation with us in this matter is appreciated.

Sincerely,

A. Randolph Blough, Chief,

Reactor Projects Branch 2

Enclosure;

1.

Combined NRC Inspection Report 50-387/91-13; 50-388/91-13

110220045

911010

PDR

ADOCK 05000387

8

PDR

cc w/encl:

R. G. Byram, Vice President, Nuclear Operations

H. G. Stanley, Superintendent of Plant - SSES

A. R. Sabol, Manager, Nuclear Quality Assurance

J. M. Kenny, Licensing Group Supervisor

S. B. Ungerer, Manager, Joint Generation Projects Department, Atlantic

Electric

J. S. Decker, Services Project Manager, General Electric Company

B. A. Snapp, Esquire, Assistant Corporate Counsel

H. D. Woodeshick, Special Office of the President

J. C. Tilton III, Allegheny Electric Cooperative, Inc.

W. Lowthert, Manager of Nuclear Training

K. Abraham, PAO

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

3

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. White, DRP

R. Blough, DRP

P. Kaufman, DRP

T. Johnson,

Senior Resident Inspector, Salem/Hope Creek

J. Joyner, DRSS

R. J. Kiessel, NRR

E. L. Conner, DRP

J. J. Raleigh, NRR

J. Noggle, DRSS

R. Lobel, EDO

J. Trapp, DRS

bcc w/Executive Summary Only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

J. Durr, DRS

L. Bettenhausen,

DRS

M. Knapp, DRSS

C. Miller, NRR

arber

10 07/91

J..

ite

10

/91

DRP

A.R. Blough

10/7/91