ML17157A892
| ML17157A892 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/27/1991 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157A893 | List: |
| References | |
| NUDOCS 9110140008 | |
| Download: ML17157A892 (3) | |
See also: IR 05000387/1991016
Text
2
1
)ggl
Docket Nos.
50-387
50-388
Mr. Harold W. Keiser
Senior Vice President - Nuclear
Power
8 Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
Inspection
Nos. 50-387/91-16;
50-388/91-16
This letter refer s to the routine safety inspection
conducted
by Mr. J.
Kottan
of this office on August 26
30,
1991 at the Susquehanna
Steam Electric
Station,
Berwick, Pennsylvania
of activities authorized
by
NRC License
Nos.
and to the discussions
of our findings held by Mr. Kottan
with Mr. G. Stanley
and others of your staff at the conclusion of the
inspection.
Areas examined during this inspection
are described
in the
NRC Region I
Inspection
Report which is enclosed with this letter.
Within these
areas,
the
inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
In addition,
our Mobile Laboratory was also brought to your site
and used
by
the inspector
to make certain
independent
measurements.
The basic purpose of
these
independent
measurements
is to verify your capability for analyzing
radioactive effluents,
and to achieve
and maintain comparable
methods of
analyses
between your facility and the
NRC.
The complete data
from these
measurements will be reported
in a subsequent
inspection report.
Within the
scope of this inspection,
you had in place
an effective program for
measuring radioactivity concentrations
in process
and effluent samples.
No
violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Qriginal Signed
B
]ames
H. 3oyner
James
H. Joyner,
Chief
Facilities Radiological
Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
9110140008
910927
ADDCK 05000387
8
OFFICIAL RECORD
COPY
IR SUS 91-16 - 0001.0.0
09/24/91
Power 5 Light Company
BED>p )gg)
Enclosure:
Inspection
Report Nos. 50-387/91-16;
50-388/91-16
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
J.'.
Kenny, Licensing Group Supervisor
H.
C. Stanley,
Superintendent
of Plant-SSES
R.
G. Bryam, Superintendent
of Plant-SSES
S.
B. Ungerer,
Manager, Joint Generation
Projects
Department
J.
D. Decker,
Nuclear Services
Manager,
General Electric Co.
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
D. Woodeshick,
Special Assistant to the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
K. Abraham,
PAO (2) All Inspection
Reports
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
J. Joyner,
DRSS
J. White,
R. Blough,
P.
Kaufman,
SALP Coordinator
DRSS
SALP Coordinator
R. Lobel,
P. Cortland,
Paul
Boehnert,
Chairman,
Only)
WE Pasciak,
DRSS
N. Blumberg,
S
tan/mlb/lb
09/)7/91
RI:D SS
09/pp/91
Joyner
09/g/91
OFFICIAL RECORD
COPY
IR SUS 91"16
0002.0.0
09/24/91