ML17157A845

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/91-14 & 50-388/91-14 on 910820-21.No Violations Noted
ML17157A845
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/05/1991
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157A846 List:
References
NUDOCS 9109170154
Download: ML17157A845 (4)


See also: IR 05000387/1991014

Text

1991

Docket Nos.

50-387

50-388

License Nos. NPR-14

NPR-22

Mr. Harold W. Keiser

Senior Vice President - Nuclear

Pennsylvania Power A, Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Keiser:

Subject:

Combined Inspection Report Nos. 50-387/91-14 and 50-388/91-14

An announced regional initiative radwaste/transportation

inspection of the Susquehanna

Steam Electric Station (SSES) Spent Fuel Pool Cleanout Project (SFPCP) was conducted

on August 20-21, 1991.

The inspection focused on the witnessing of radwaste Type B

shipments.

Areas covered in this inspection included a review of previously identified

items associated with the Project, NQA surveillance reports relative to the SFPCP, and

the review of two (2) irradiated reactor hardware radwaste shipments with respect to

applicable NRC and DOT regulations.

The cask loading and shipping preparation

activities were conducted within the regulatory framework in an efficient manner.

Within the scope of this inspection, no violations were identified.

No response to this letter is required.

Your cooperation with us is appreciated.

Sincerely,

Origingf $jgtlgg gy

3!NBs g. j()yggp

Bio+~~

~

5gG0387

y ()905

ton

~~t'

toe

6

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Combined Inspection Report Nos. 50-387/91-14 and 50-388/91-14

Pennsylvania Power & Light Company

2

SPP p~

Pennsylvania Power and Light Company

cc w/encl:

R. G. Byram, Vice President, Nuclear Operations

A. R. Sabol, Manager, Nuclear Quality Assurance

J. M. Kenny, Licensing Group Supervisor

H. C. Stanley, Superintendent of Plant - SSES

S. B. Ungerer, Manager, Joint Generation Projects Dept., Atlantic Electric

J. D. Decker, Nuclear Services Manager, General Electric Company

B. A. Snapp, Esquire, Assistant Corporate Counsel

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information,Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

Pennsylvania Power 4 Light Company

3

Pennsylvania Power and Light Company

SEp 05 I@,

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Joyner, DRSS

J. White, DRP

R. Blough, DRP

P. Kaufman, DRP

K. Brockman, EDO

P. Cortland, NRR

K. Abraham, PAO (2)

Pennsylvania Power & Light Company

4

~F Og

tgg~

RI:DRSS

oggle

9/9/91

I:

SS

Pasciak

9/ $91

RI:DRSS

Jo

er

OFFICIALRECORD COPY