JUL 12 $9)
Docket Nos.
50-387
50-388
Pennsylvania Power &Light Company
ATI'N: Mr. H. W. Keiser
Senior Vice President - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
Subject:
NRC Region I Combined Inspection 50-387/91-07; 50-388/91-07
The enclosed report documents a routine safety inspection conducted by inspectors of this office
on May 14 - June 24, 1991, at the Susquehanna
Steam Electric Station (SSES), Salem Township,
The inspection covered plant operations, surveillance, and maintenance for both
units.
At the conclusion of the inspection, Mr. G. S. Barber, Senior Resident Inspector,
summarized the inspection findings with Mr. H. G. Stanley and other members of your staff.
Areas examined during the inspection are identified in the report.
Within these areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities in progress.
The purpose of the
inspection was to determine whether NRC licensed activities were being conducted safely and
in accordance
with regulatory requirements.
This report also summarizes
the Management
Meeting conducted June 20,
1991 relative to improvements
and status in the Environmental
Qualification Program and Binder Upgrade Project.
Based on the results of this inspection, it
appears
that your staff conducted licensed activities in a safe manner during this period.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGfNN, StGNEO BY:
A. Randolph Blough, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosure: Combined NRC Inspection Report 50-387/91-07; 50-388/91-07
9107230199
910712
ADOCK 05000387
9
OFFICIALaZCOao Coj.r
Pennsylvania Power &, Light Company
gUl 32 SS1
cc w/encl:
R. G. Byram, Vice President, Nuclear Operations
H. G. Stanley, Superintendent of Plant - SSES
A. R. Sabol, Manager, Nuclear Quality Assurance
J. M. Kenny, Licensing Group Supervisor
S. B. Ungerer, Manager, Joint Generation Projects Department, Atlantic Electric
J. S. Decker, Services Project Manager, General Electric Company
B. A. Snapp, Esquire, Assistant Corporate Counsel
H. D. Woodeshick, Special Office of the President
J. C. Tilton III, Allegheny Electric Cooperative, Inc.
W. Lowthert, Manager of Nuclear Training
K. Abraham, PAO (2 copies)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIALRECORD COPY
Juj. 13
ASS>
Pennsylvania Power & Light Company
3
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. White, DRP
R. Blough, DRP
P. Kaufman, DRP
T. Johnson, Senior Resident Inspector, Salem/Hope Creek
J. Joyner, DRSS
R. J. Kiessel, NRR
E. L. Conner, DRP
J. J. Raleigh, NRR Project Manager
J. Noggle, DRSS
K. Brockman, EDO
J. Trapp, DRS
bcc w/Executive Summary Only:
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS
W. Butler, NRR
<Bar er/meo
7/8/91
Blough
7/ii/e i
OFFICIALRECORD COPY
A:9107.SUS