-J4g> 3 0 ]991
Docket Nos.
50-387
.
50-388
Power
& Light Company
ATTN: Mr. Harold
W. Keiser
Senior Vice President
Nuclear
2 North Ninth Street
All entown,
Penn syl vani a
18101
Gentlemen:
I
Subject:
Combined Inspection
Report Nos.
50-387/90-19
and 50-388/90-19
Enclosed is the report of the inspection
conducted
by Mr. H. J.
Kaplan of this
, office on November
13-16,
1990, of activities at the Susquehanna
Steam Electric
Station, Units
1
& 2.
These activities are authorized
by
NRC Operating
License-
Nos.
Discussions
of our findings were h'eld by Mr. Kaplan
with Mr. G. Stanley
and other members of your staff at the conclusion of the
inspection.
P
The
NRC Region I Inspection
Report discusses
our observations
of your reactor
water chemistry program,
inservice inspections
and the erosion/corrosion
program.
Within these
areas,
the inspection
consisted
of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and observa-
tions by the inspector.
Within the
scope of this inspection,
no violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Q>> <>>4 w>>) F,.(;w>>
~
(>~ ~>>
~
>>~
~ was, BTf
I," 'gc.1uQ p
Qgvi>>
~
Jacque
P. Durr, Chief
Engineering
Branch
Division of Reactor Safety
Enclosure:
NRC Region I Inspection
Report Nos.
50-387/90-19
and 50-388/90-19
I
'9102'0229
920130
AnaCK oSOoosaz
Qi
PhP
OFFICIAL RECORD
COPY
CIR SUS 90-19 " 0001.0.0
0 /2 / I
Yi'01
A
gag 30
1991
Power and
Light Company
.
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear equality Assurance
J.
M. Kenny, Licensing Group Supervisor
R.
G.
Bryam, Superintendent
of Plant-SSES
S.- B. Ungerer,
Manager, Joint Generation
Projects
Department
J.
D. Decker,
Nuclear Services
Manager,
General
Electr'ic Co.
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
D. Woodeshick',
Special Office of t'e President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety'nformation
Center
(NSIC)
K. Abraham,
PAO (26)
SALP Reports
and (2) All Inspection
Reports
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
R. Bellamy,
DRSS
P; Swetland,
M, Conner,
RE Blough,
'.
Kaufman,
J. Caldwell,
,
C.
Cheng,
NRR '
RI:DRS
Kaplan/rw
12/~f/90
RI:DRS
FN.
3gpii~<
OFFICIAL RECORD
c
~)
RI:DRS
Medoff
/
R/pc/90
FiAs-
RI:DR&
Harris
1/7 /9lf
COPY
CIR SUS 90-19
0002.0.0
12/31/90