Forwards Summary of Discussion on 900918 on drop-in Visit from Util Vice President
ML17157A479
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/18/1990
From: Blough A
Office of Nuclear Reactor Regulation
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9012280007
Download: ML17157A479 (6)


Text

FORD 1

REGULATORYOIFORMATION DISTRIBUTION S4EM'(RIDE)

ACCESSION NBR:9012280007 DOC.DATE: 90/12/18 NOTARIZED:

NO DOCKET I FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH.NAME AUTHOR AFFILIATION BLOUGH,A.R.

Assistant Director for Region II Reactors RECIP.NAME RECIPIENT AFFILIATION BYRAM,R.

Pennsylvania Power a Light Co.

SUBJECT:

Forwards summary of discussion on 900918 on drop-in visit from util Vice 'President.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR Q ENCL J SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:LPDR 1

cy Transcripts.

LPDR 1 cy Transcripts.

05000387 05000388 3

RECIPIENT ID CODE/NAME PD1-2 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 OE D

R'FI E~2 EXTERNAL: EG&G/BRYCE,J.H.

NSIC NOTES:

COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 RECIPIENT ID CODE/NAME THADANI,M AEOD AEOD/TPAB NRR MORISSEAUFD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGNl PILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL 26

pFC 18 1990 Docket Nos.

50-387 50-388 Pennsylvania Power and Light Company ATTN:

Robert Byram Vice President - Nuclear Operations Susquehanna Steam Electric Station 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

We appreciate the information which you provided to Mr. W. Hehl and other NRC staff members during your drop-in visit at the Region I office on September 18, 1990.

Enclosed is a summary of our discussion.

Please contact me ifyou note any errors in this summary.

Sincerely,

~

~,

C ',"'

A.R. Blough, Chief Reactor Projects Branch 2

Enclosure:

As Stated cc w/encl:

R.G. Byram, Vice President, Nuclear Operations H.G. Stanley, Superintendent of Plant - SSES i A.R. Sabol, Manager, Nuclear Quality Assurance eJ.M. Kenny, Licensing Group Supervisor

~S.B. Ungerer, Manager, Joint Generation Project Department, Atlantic Electric i J.S. Decker, Services Pxoject Manager, General Electric Company pB.A. Snapp, Esquire, Assistant Corporate Counsel iH.D. Woodeshick, Special Office of the President xJ.C. Tilton III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

I Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania 9012280007 90)~pa PDR ADQCK 05000387 PDR OFFICIAL RECORD COPY

Pennsylvania Power and Light Company 2

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

P. Swetland, DRP P. Kaufman, DRP T. Johnson, Senior Resident Inspector, Salem/Hope Creek J. Joyner, DRSS R. J. Kiessel, NRR E.L. Conner, DRP M.C. Thadani, NRR Project Manager J. Noggle, DRSS J. Caldwell, EDO D. Moy, DRS J. Dixon, Reactor Engineer, DRS

+ RI:DRP RI:DRP PSwetland 12/l]/90 RBIough 12/@/90 eel 12/($90 OFFICIAL RECORD COPY

'1 y

E~NL E

Dr

-in Vi i fr m PP L Vi Presi n

On September 18, 1990, Mr. R. Byram, Vice President-Nuclear Operations representing PP&L visited the NRC Region I office on short notice.

He met with Messrs. W. Hehl, A.

Blough and P. Swetland of the Division of Reactor Projects and Mr. C. Anderson of the Division of Reactor Safety from 4:00 p.m. until 6:00 p.m.

Mr. Byram had requested the visit to ensure that the Region is well-informed with respect to activities at the Susquehanna Steam Electric Station (SSES).

The following areas were discussed:

1.

Overview of SSES mission/values including the PP&L Strategic Planning Process.

2.

Clarification of Operability /Reportability issues.

3.

Status of Non-conformance reporting system.

4.

Scheduling of enforcement conference relative to NRC Inspection Report 50-387/90-17 These discussions included general information and management insights.

No substantive technical or licensing issues were resolved.