Text
p tegQ
Docket Nos. 50-387
50-388
Pennsylvania Power 8c Light Company
ATT¹
Mr. H. W. Keiser
Senior Vice President - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
NRC Region I Combined Inspection 50-387/90-21; 50-388/90-21
The enclosed report documents a routine safety inspection conducted by inspectors of this
office on October 7, 1990 - November 3, 1990, at the Susquehanna
Steam Electric Station
(SSES), Salem Township, Pennsylvania.
The inspection covered plant operations,
surveillance, and maintenance for both units. At the conclusion of the inspection, Mr. G. S.
Barber summarized the inspection findings with Mr. H. G. Stanley and other members of
our staff..
y
Your cooperation with us in this matter is appreciated.
Sincerely,
~
~
l
I
I
~
A.R. Blough, Chief,
Reactor Projects Branch 2
Enclosure:
1 ~
Combined NRC Inspection Report 50-387/90-21; 50'-388/90-21
I
g/~0
qgi2200046
P01212
pgp
ADOCK 050003~7
G
F'DR
Pennsylvania Power and Light Company
2.
cc w/encl:
uR. G. Byram, Vice President, Nuclear Operations
H. G. Stanley, Superintendent of Plant - SSES
<A. R. Sabol, Manager, Nuclear Quality Assurance
zJ. M. Kenny, Licensing Group Supervisor
rS. B. Ungerer, Manager, Joint Generation Projects Department, Atlantic Electric
~J. S. Decker, Services Project Manager, General Electric Company
rB. A. Snapp, Esquire, Assistant Corporate Counsel
gH. D. Woodeshick, Special Office of the President
rJ. C. Tilton III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
Pennsylvania Power and Light Company
3
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
P. Swetland, DRP
'P. Kaufman, DRP
T. Johnson, Senior Resident Inspector, Salem/Hope Creek
J. Joyner, DRSS
R. J. Kiessel, NRR
E. L. Conner, DRP
M. C. Thadani, NRR Project Manager
J. Noggle, DRSS
J. Caldwell, EDO
D. Moy, DRS
J. Dixon, Reactor Engineer, DRS (Section 8.0)
bcc w/Executive Summary Only:
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS
W. Butler, NRR
RI:DRP
RI:DRP
Swetland
12/10/90
Blou h
r g(y)p
OFFICIALRECORD COPY
a:sus9021.klg