ML17157A063
| ML17157A063 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/06/1990 |
| From: | Thadani M Office of Nuclear Reactor Regulation |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| GL-89-07, GL-89-7, TAC-74738, TAC-74739, NUDOCS 9003140157 | |
| Download: ML17157A063 (3) | |
Text
Docket Nos. 50-387
,and 50-388 March 6, 1990 MEMORANDUM FOR:
Walter.R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II FROM:
SUBJECT'E:
Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II
RESPONSE
TO GENERIC LETTER 89-07, SURFACE VEHICLE BOMBS CONTINGENCY PLAN (TAC NOS.
74738 AND 74739)
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS I AND 2 By letter dated November 11,
- 1989, Pennsylvania Power and Light Company (the licensee) responded to Generic Letter 89-07 related to "Power Reactor Safeguards Contingency Plan."
The -licensee confirmed that it has developed and issued a
procedure which includes safeguards contingency planning for short-term actions that it wi 11 take to protect against attempted radiological sabotage involving a land vehicle bomb in the event such a threat were to develop.
The 'licensee's procedure adopted the approach identified in the generic letter.
Therefore, the subject issue is consider ed resolved for Susquehanna Steam Electric Station, Units I and 2.
By a copy of this memorandum, Region I is advised of the licensee's position on this matter.
PDR ADDCLC 0500 F
cc:
E. Leeds P. Swetland DISTRIBUTION NRC PDR Local PDR PDI-2 Reading SVarga BBoger WButler MO'Brien MThadani JStone OGC EJordan ACRS (10)
/s/
Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II
[74738/
ad i:mj P /( /90 PDI -2/0 WButler
~ /( /90 r't)
I tl
II
~ > I' ll' II C
~ q II II
4y,~ ACCT
~ )
4)
)
nO Op
+~
r
~O'>>+++
Docket Nos.
50-387 and 50-388 I
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 6, 1990 MEMORANDUM FOR:
lIalter R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II FROM:
SUBJECT:
RE:
Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II
RESPONSE
TO GENERIC LETTER 89-07, SURFACE VEHICLE BOMBS CONTINGENCY PLAN (TAC NOS.
74738 AND 74739)
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 By letter dated November 11, 1989, Pennsylvania Power and Light Company (the licensee) responded to Generic Letter 89-07 related to "Power Reactor Safeguards Contingency Plan."
The licensee confirmed that it has developed and issued a
procedure which includes safeguards contingency planning for short-term actions that it will take to protect against; attempted radiological sabotage involving a land vehicle bomb in the event such a threat were to develop.
The licensee's procedure adopted the approach identified in the generic letter.
Therefore, the subject issue is considered resolved for Susquehanna Steam Electric Station, Units 1 and 2.
By a copy of this memorandum, Region I is advised of the licensee's position on this matter.
cc:
E. Leeds P. Swetland Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects
- I/II