Forwards Combined Insp Repts 50-387/89-24 & 50-388/89-22 on 890730-0909.Mgt Meeting Requested Due to NRC Concern That Threshold Set Too High for Reporting Engineering Deficiencies
ML17156B437
Person / Time
Site: Susquehanna  
Issue date: 10/30/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156B438 List:
References
NUDOCS 8911070151
Download: ML17156B437 (4)


See also: IR 05000387/1989024

Text

4

Docket Nos.

50-387

50-388

80 OCT 1989

Pennsylvania

Power

& Light Company

ATTN:

Mr. H.

W. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Al 1 entown,

Pennsylvania

18101

Gentlemen:

Subject:

NRC Region I Combined Inspection

50-387/89-24;

50-388/89-22

The enclosed

report documents

a Poutine safety inspection

conducted

by

inspectors

of this office on July 30,

1989 - September

9,

1989, at the

Susquehanna

Steam Electric Station

(SSES),

Salem Township, Pennsylvania.

The inspection

covered plant operations,

surveillance,

and maintenance

for

both units.

At the conclusion of the inspection,

Mr. G. Barber

summarized

the inspection findings to Mr. R.

Byram and other members of your staff.

We are concerned that you have set too high a threshold, for reporting engineering

deficiencies.

Notifications and Licensee

Event Reports

(LERs) are required

whenever the plant is in a condition that is outside its design basis.

There

were

two circumstances

documented

in the enclosed

report where.you identified

that the plant was outside its design basis.

Your engineering staff promptly

identified and defined these

issues.

However,

these conditions were apparently

not reported

because

your staff believed that the design basis could be accep-

tably changed to addrnss

the discrepant

conditions.

NRC reporting criteria

require these conditions to be promptly reported in order to assure

NRC's

understanding

of the licensee's justification for continued operation while the

design basis is being revised,

and to assure that the generic aspects

of the

conditions are evaluated

in a timely manner.

In order to assure

that

we have

a

common understanding

regarding

NRC reporting requirements,

please

schedule

a

management

meeting with us at your earliest

convenience.

Your cooperation with us in this matter is appreciated.

Sincerely,

Qjjggl Signe5

BY:

William F.

Kane, Director

Division of Reactor Projects

Enclosure:

Combined

NRC Inspection

Report 50-387/89-24;

50-388/89-22

OFFICIAL RECORD

COPY

epiiO70i~l, 8/1030

PDR

ADOCK 05000337

Q

PDC

IR SUS 89"24 - 0001.0.0

10/27/89

Pennsylvania

Power and

Light Company

30 OCT 1988

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

J.

Kenny, Licensing Group Supervisor

R.

G. Byram, Superintendent

of Plant

SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department, Atlantic

Electric

J.

S. Decker,

Services

Project Manager,

General

Electric Company

B. A. Snapp,

Esquire, Assistant Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region. I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

Licensing Project Manager,

NRR:

PDI2

P. Swetland,

DRP

P.

Kaufman,

DRP

DRP

R. J., Kiessel,

NRR

M. C. Thadani,

NRR

E.

L. Conner,

DRP

R

R

  • PS etland/rhl

RI:DRP

  • JLinville

10/

/89

OFFICIAL RECORD

COPY

  • See Previous

Concurrences

IR SUS 89-24

0002.0.0

10/27/89

Pennsylvania

Power and

Light Company

Your cooperation with us in this matter is appreciated.

Sincerely,

William F.

Kane, Director

Division of Reactor Projects

Enclosure:

Combined

NRC Inspection

Report 50-387/89-24;

50-388/89-22

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

I

J.

Kenny, Licensing Group Supervisor

R.

G.

Byram', Superintendent

of Plant - SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department, Atlantic

Electric

J.

S. Decker, Services

Project, Manager,

General Electric Company

B. A. Snapp,

Esquire, Assistant

Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton III, Allegheny Electric Cooperative,

Inc.

~

~

~

~

Public Document

Room (PDR)

~ Local Public 'Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

Licensing Project Manager,

NRR:

PDI2

P. Swetland,

DRP.

P.

Kaufman,

DRP

DRP

R. J. Kiessel,

NRR

M. C. Thadani,

NRR

E.

L. Conner,

DRP

PS etland/rhl

I:DRP

JLinvi1 le

10/) (89

OFFICIAL RECORD

COPY

RI: DRP

WKane

IR SUS 89-24 " 0001.1.0