Text
~gR Rangy
(<
~o OOf
++**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.
DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
57 License No.
HPF-22 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 8
Light Company, dated June 19, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility wi 11 operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wi 11 be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The'ssuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment Ho.
57 and the Environmental Protection Plan con-tained in Appendix B, are hereby incorporated in the license.
PPE L shall operate the facility in accordance with the Technical Specifica-tions and the Environmental Protection Plan.
89090 <0347 890828 PDR ADOCK 05000388 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 28, 1989 Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
ATTACMMENT TO LICENSE AMENDMENT NO.
FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following page of the Appendix A Technical Specifications with enclosed page.
The revised page is identified by Amendment number and contain vertical lines indicating the area of change.
The overleaf page is provided to maintain document completeness."
REMOVE 3/4 0-1 3/4 0-2 INSERT 3/4 0-1*
3/4 0-2
3/4. 0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the
'ucceeding Specifications is required during the OPERATIONAL CONDITIONS or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.
3.0.2 Noncompliance with a Specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals.
If'he Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
- 3. 0. 3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within one hour action shall. be initiated to place the unit in an OPERATIONAL CONDITION in which the Specification does not apply by placing it, as applicable, in:
l.
At least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 2.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 3.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
'I Where corrective measures are completed that permit operation under. the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual Specifications.
This specification is not applicable in OPERATIONAL CONDITION 4 or'.
3.0.4 Entry into an OPERATIONAL CONDITION or othe'pecified condition shall not be made when the conditions for the Limiting Conditions for Operation are
'ot met and the associated ACTION re uires a 'shutdown if the are not met w>thin a s ec>f>ed tsme interval.
Entr snto an OP RATIONAL CONDITION or other s ecified cond tion ma be made in accordance with the ACTION re uirements when conformance to them ermits continued o eration of the facilit for an unlimited eriod of t me.
Thss provision shall not prevent passage through or to OPERATIONAL CONDITIONS as required to comply with ACTION requirements.
Exceptions to these requirements.
are stated in the individual Specifications.
SUSQUEHANNA - UNIT 2 3/4 0"I Amendment No.
43 4pg 95&
APPLICABILITY.
SURVEILLANCE RE UIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
a 0 b.
A maximum allowable extension not to exceed 25K of the surveillance interval, but The combined time interval for any 3 consecutive surveillance intervals shall not exceed 3.25 times the specified surveillance interval.*
4.0.3'ailure to perform a Surveillance Requirement within the allowed surveillance interval, defined h
S ecification S.0.2, shall const>tute Lii igC for Operation.
The time limits of the ACTION re uirements are a
licable at the time it is 1dents sed that a Surveys ance e usrement has not been er ormed.
e A
re us rements ma be de a ed for u to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to erm>t the corn et>on of the surveys ance when the a
owab e outa e tsme imits o t e N re usrements are ess than 2
hours.
Surveys ance equ>rements o not have to be performed on inoperab e equipment.
4.0.4 Entry into an OPERATIONAL CONDITION or other specified applicable condition shall not be made unless the Surveillance Requirement(s) associated with the Limiting Condition for Operation have been performed within the applicable surveillance interval or as otherwise specified, This rovision shall not revent assa e throu h or to OPERATIONAL CONDITION as re unbred to com w>th A
re u>rements.
- 4. 0. 5 Surveillance Requirements for inservice inspection and testing of 'ASME Code Class 1, 2, 8
3 components shall be applicable as follows:
a.
Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by.
10 CFR 50, Section 50.55a(g),
except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
b.
Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:
- Not applicable to 18 month sur vei llances required to be performed prior to the startup following the end of the Unit 2 Third Refueling and Inspection Outage.
SUS(UEHANNA - UNIT 2 3/4 0"2 Amendment No. 57