ML17156B190
| ML17156B190 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/30/1989 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8906120182 | |
| Download: ML17156B190 (3) | |
Text
RECIPIENT ID CODE/NAME PDl-2 LA COPXES LTTR ENCL 1
0 RECIPIENT ID CODE/NAME THADANI,M COPIES LTTR ENCL 1
1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR:8906120182 DOC.DATE: 89/05/30 NOTARIZED:
NO FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva AUTH.NAME AUTHOR AFFILIATION RANDY,A.
Region 1, Ofc of, the Director RECXP.NAME RECIPIENT AFFILIATXON Region 1, Ofc of the Director
SUBJECT:
Notification of Significant Licensee Meeting 89-079,Rev 1
w/util on 890613 re carbon dioxide fire protection sys.
DISTRIBUTION CODE:
IE4SD COPIES RECEIVED:LTR J ENCL i SIZE:
TXTLE: Summary of Significant Meeting with Licensee (Part 50)
NOTES:LPDR 1
cy Transcripts.
LPDR 1 cy Transcripts.
DOCKET 05000387 05000388 05000387 i 05000388 4
D INTERNAL: AEOD/DOA
'EDRO NRR/DREP/EPB 10 NUD88& ~TRACT a
RGN1 FILE 01 EXTERNAL: LPDR
'NSIC NOTES:
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
2 2
AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/PMAS/XLRB12
'OGC/ROED RES/DS IR/EIB NRC PDR 1
1 1
1 1
1 1
1 1
1 R
I S
h NGTE 'Io ALL 'RIES" RZCEPXZHIS:
PEEASE HELP US TO RED(RE HASTE!
CXMMT 'IHE DOQ3NEÃZ CONTROL DESK RXN P1-37 (EXT. 20079)
TO ELQGMXB YOUR MME PKH DZSI%GMTZCN LISTS PGR DO(XlME268 YOU DGR'T HEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 17
MAY ~0i~~g U.S.
NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No.89-079 Revision 1
Licensee:
Faci 1 ity:
Docket Nos.:
Time and Date:
Location:
Purpose:
NRC Attendees:
Pennsylvania Power and Light Company Susquehanna Steam Electric Station, Units 1 and 2
50-387 and 50-388 10:00 a.m.,
June 13, 1989 NRC Region I, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room Management Meeting to Discuss Testing Programs and Operability Demonstrations for Carbon Dioxide Fire Protection Systems W. Johnston, Deputy Director, Division of Reactor Safety (DRS)
R.
- Wessman, Acting Chief, Reactor Projects Branch No. 3, Division of Reactor Projects (DRP)
J. Strosnider, Acting Chief, Engineering
- Branch, DRS R. Blough, Chief, Reactor Projects Section No.
3B, DRP C. Anderson, Chief, Plant Systems
- Section, DRS A. Krasopoulos, Reactor
- Engineer, DRS S. Barber, Senior Resident Inspector M. Thadani, Project Manager, Office of Nuclear Reactor Regulation (NRR)
D. Notley, Fire Protection
- Engineer, NRR Licensee Attendees:
B. Garner,
- Manager, Engineering Operations D.
Kohn, Fire Protection
- Engineer, Nuclear Plant Engineering N. Coddington, Senior Licensing Engineer W. Williams, Project Engineer D. Roth, Supervisor of Compliance S. Davis, Site Fire Protection Engineer D. Klinger, Senior Project.Engineer Note: Attendance by NRC personnel at this meeting should be made known by June 9,
1989, via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.
Orfgb"at S>n~rl ~v Prepared by:
A. Randy Blough, Chief Reactor Projects Section No.
3B
((
OFFICIAL RECORD COPY MEETING NOTICE NO.89-079 0001.0.0 05/30/89 PZ'ii.
,V>
lf Meeting Notice No.89-079 MAY 3 () 1988 Distribution:
V. Stello, Jr.,
Executive Director for Operations J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H.
- Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J.
Lieberman, Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement T. Hurley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR W. Butler, Director, Project Directorate I-2, NRR M. Thadani, Project Manager, PD I-2, NRR B. Clayton,'egional Coordinator, EDO Public Document Room (PDR)
Local Public Document Room (LPDR)
Commonwealth of Pennsylvania (2)
NRC Resident Inspector bcc:
Regional Administrator Deputy Regional Administrator Division Directors
. Branch Chiefs Section Chiefs Public Affairs Officers J.
- McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI Regi,on I Receptionist DRMA Files DRP Files Bulletin Board M. J.
- DiDonato, DRP C?
RI:DRP RBlough/mjd 5/
/89 OFFICIAL RECORD COPY MEETING NOTICE NO.89-079 - 0002.0.0 05/30/89