ML17156B174

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 89-079 on 890525 W/Util in King of Prussia,Pa to Discuss Testing Programs & Operability Demonstrations for Carbon Dioxide Fire Protection Sys
ML17156B174
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/18/1989
From: Kim T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8905310288
Download: ML17156B174 (2)


Text

OAY 18 l989 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No.89-079 Licensee:

Faci 1 ity:

Docket Nos.:

Time and Date:

Location:

Purpose:

NRC Attendees:

Pennsylvania Power and Light Company Susquehanna Steam Electric Station, Units 1 and 2

50-387 and 50-388 9:00 a,m.,

May 25, 1989 NRC Region I, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room Management Meeting to Discuss Testing Programs and Operability Demonstrations for Carbon Dioxide Fire Protection Systems W. Johnston, Deputy Director, Division of Reactor Safety (DRS)

R.

Wessman, Acting Chief, Reactor Projects Branch No. 3, Division of Reactor Projects (DRP)

J. Strosnider, Acting Chief, Engineering

Branch, DRS R. Blough, Chief, Reactor Projects Section No.

3B, DRP C. Anderson, Chief, Plant Systems

Section, DRS A. Krasopoulos, Reactor
Engineer, DRS S. Barber, Senior Resident Inspector M. Thadani, Project Manager, Office of Nuclear Reactor Regulation (NRR)

D, Notley, Fire Protection

Engineer, NRR Licensee Attendees:

B. Garner,

Manager, Engineering Operations D.

Kohn, Fire Protection

Engineer, Nuclear Plant Engineering N. Coddington, Senior Licensing Engineer W. Williams, Project Engineer D. Roth, Supervisor of Compliance S. Davis, Site Fire Protection Engineer D. Klinger, Senior Project Engineer Note: Attendance by NRC personnel at this meeting should be made known by May 22, 1989, via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

Prepared by:

Tae K. Kim, Acting Chief Reactor Projects Section No.

3B Sq05310288 5000387 F05 18 pDR AQQCK, 0 pgU F

OFFICIAL RECORD COPY MEETING NOTICE NO.89-079 0001.0. 0 05/18/89

Meeting Notice No.89-079 Distribution:

V. Stello, Jr.,

Executive Director for Operations J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J.

Lieberman, Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for. Inspection and Technical Assessment, NRR S.

Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR W. Butler, Director, Project Directorate I-2, NRR M. Thadani, Project Manager, PD I-2,. NRR B. Clayton, Regional Coordinator, EDO Public Document Room (PDR)

Local Public Document Room (LPDR)

Commonwealth of Pennsylvania (2)

NRC Resident Inspector bcc:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section. Chi ef s Public Affairs.Officers J.

McGrath, RI MD Miller, RI J. Gutierrez, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J.
DiDonato, DRP RI:DRP 1f TKim/mjd 5/lP/89 RI:DRP JWiggins 5/

/89 OFFICIAL RECORD COPY MEETING NOTICE NO.89-079 0002.0.0 05/18/89