ML17156B082
| ML17156B082 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/24/1989 |
| From: | Boger B Office of Nuclear Reactor Regulation |
| To: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8903300317 | |
| Download: ML17156B082 (3) | |
Text
March 24, 198 MEMORANDUM FOR:
FROM:
SUBJECT:
Samuel J. Collins, Deputy Director Division of Reactor Projects Region I Bruce A. Boger, Assistant Director for Region,I Reactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation TIA:
RE(VEST FOR REGION I ASSISTANCE IN RESOLUTION OF REPORTABILITY ALLEGATIONS AGAINST PENNSYLVANIA POWER I%i LIGHT COMPANY We have received a series of correspondence from a PPSL employee on a number of occasions.
We are processing them in conjunction with our allegations control system.
The background material for this matter was previously sent to Region I.
We request Region I assistance in determining validity of the reportability aspects of the allegations.
The resident inspection staff should pursue the specific reportability issues associated with the May 22, 1986 emergency diesel generators failures due to an open circuit in a diesel generator field circuit causing an inductive surge which propagated to a computer circuit input card, flashed over to other similar monitoring circuits on the same card, and resulted in the creation of field ground detection alarms on all the other diesel generators.
Additionally, we request that the Region I and the resident inspection staff review the licensee's reportability determination program and procedures applied within the licensee's engineering organization.
We request that the Region I staff provide NRR an assessment and findings on the above reportability questions for incorporation in the NRR response to the alleger.
Additionally, Region I, with NRR concurrence, should take the associated enforcement actions as appropriate.
Please let us know the schedule by which you plan to complete tliis activity.
cc:
G. Lainas W.
Kane
/s/
Bruce A. Boger, Assistant Director for Region I Peactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION PDI-2 Reading MO'Brien NRC PDR/LPDR GLainas/BBoger MThadani WButler
[COLL NS MEMOj M
PDI-2/D hadani:tr WButler
/Q/89 g /t~ /89 S90SSOOS~7'~OS~O --
RI oger igis9 NR l(R2 GLa as 9
lo (is BGr es
/
89 Risc~& ~~JR ~
qIr ~en <~~
+I Ft 7 f)
~ )4))f)
")
),I P
) I
,<<7, g
r ~
~)r I
)I l f<<
t c) P'il n
~
I c It
)
.I' g
t ri'),
I 1')t Qlit) i
'I ~ it l
~
c ~ r<< Ip l
r I P I
I')g 7 I
I I'l pr)'<<)r I P<<)f I
I I'
~ <<r L f I
ll I
~ V I f "V )<<j>> ~
<<VI+j 1
<r<< > t I
r,) t.
c r
I "vl)r<<<<~
r p
~
~ ll P
)\\ y I'F 3 <<I f
ty' F I'I I
F c
I tv t
'I c
<<J, lr C3 r1 II I
I FI ~ VF) l'"
PI C I j ~.
P)I)t<<
P
'/'<< tr
~ I
,fl -V 7
) V)t I<<
fI)) P,. )tf
~ <<9 h
' 't
'tl (V,W, t l I'I t<<
I i'I l I
)
tvlv I
~
I
'Illr
~ c '
~l I
~ V
$ l W IC y
I I<<<<
~y,g REou
~)
C I
n0 IA 4'
~O
+a*<<+
MEMORANDUM FOR:
FROM:
SUBJECT:
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 24, 1989 Samuel J. Collins, Deputy Director Division of Reactor Projects Region I Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II Office of'uclear Reactor Regulation TIA:
REQUEST FOR REGION I ASSISTANCE IN RESOLUTION OF REPORTABILITY ALLEGATIONS AGAINST PENNSYLVANIA POWER 8I LIGHT COMPANY We have received a series of correspondence from a PPAL employee on a number of occasions.
We are processing them in conjunction with our allegations control system.
The background material for this matter was previously sent to Region I.
We request Region I assistance in determining validity of the reportability aspects of the allegations.
The resident inspection staff should pursue the specific repor tability issues associated with the May 22, 1986 emergency diesel generators failures due to an open circuit in a diesel generator field circuit causing an inductive surge which propagated to a computer circuit input card, flashed over to other similar monitoring circuits on the same card, and resulted in the creation of field ground detection alarms on all the other diesel generators.
Additionally, we request that the Region I and the resident inspection staff review the licensee's reportability determination program and procedures applied within the licensee's engineering organization.
We request that the Region I staff provide NRR an assessment an'd findings on the above repor tability questions for incorporation in the NRR response to the alleger.
Additionally, Region I, with NRR concurrence, should take the associated enforcement actions as appropriate.
Please let us know the schedule by which you plan to complete this activity.
cc:
G. Lainas W.
Kane Bruce A.
ger, Assistant Director for Region I Reactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation