ML17156B036
| ML17156B036 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/14/1989 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8902230556 | |
| Download: ML17156B036 (2) | |
Text
Licensee:
Facility:
Docket Nos.:
Time and Date:
Location:
U.S.
NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE-MEETING Pennsylvania Power and Light Company No.89-033 Susquehanna Steam Electric Station, Units 1 and 2
50-387 and 50-388 1:00 p.m.,
March 3, 1989 NRC Region I, King of Prussia, Pennsylvania Division of 'Reactor Projects (DRP) Conference Room.
Purpose:
NRC Attendees:
-To Discuss Licensee Evaluation of the Reactor Building Temperature Profile Used for Environmental gualification of Equipment W. Kane, Director, Division of Reactor Projects (DRP)
T. Martin, Director, Division of Reactor Safety (DRS)
R. Blough, Chief, Reactor Projects Section No.
3B, DRP J. Durr, Chief, Engineering
- Branch, DRS C. Anderson, Chief, Plant Systems
- Section, Plant Systems Branch, Office of Nuclear Reactor Regulation (NRR)
R. Wilson, Reactor Engineer, Vendor Inspection
B. Byrum, Plant Superintendent J. Blakeslee, Assistant Superintendent, Operations F. Butler,'anager, Nuclear Design G. Miller, Supervising
- Engineer, Mechanical Design A. Derkacs, Senior Project Engineer - Eg J.
Agnew, Senior Project Engineer, Mechanical Engineer R. Harris, Senior Licensing Engineer E.
- Heckman, Licensing Group Supervisor D. Roth, Supervisor of Compliance Note: Attendance by NRC personnel at this meeting should be made known by March 1, 1989, via telephone call to Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.
Prepared by:
A. Randy Blough, Chief Reactor Projects Section No.
3B OFFICIAL RECORD COPY MEETING NOTICE NO.89-033 - 0001.0.0 02/14/89
'(i)
Meeting Notice No.89-033 FEH 14 )ggg Distribution:
V. Stello, Jr.,
Executive Director for Operations J. Taylor, Deputy Executive. Director for Regional Operations B. Grimes, Acting Director, Division of Reactor Inspection and Safeguards, NRR J.
Lieberman, Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S.
Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR W. Butler, Director, Project Directorate I-2, NRR M. Thadani, Project Manager, PD I-2, NRR M. Johnson, Regional Coordinator, EDO Public Document Boom (PDB)
Local Public Document Room (LPDR)
State of Pennsylvania NRC Resident Inspector bcc:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer J.
- McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J.
2/l~/89 7
RI: DRP RBlough 2//P/89 RI: DRP JWiggins 2/
/89 OFFICIAL RECORD COPY MEETING NOTICE NO.89-033 - 0002.0.0 02/13/89