Forwards Mc Thadani Insp Repts Ti 2515/93 & Ti 2515/95 on 881025
ML17156A946
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/06/1988
From: Butler W
Office of Nuclear Reactor Regulation
To: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8812090202
Download: ML17156A946 (7)


Text

December 6,

1988

.MEMORANDUM FOR:

FROM:

SUBJECT:

James T. Wiggins, Chief Reactor Projects Branch No.

2 Division of Reactor Projects, Region I Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PROJECT MANAGER INSPECTIONS PER TI 2515/93 AND 2515/95 On October 25,

1988, Mr. Mohan C. Thadani, NRR Project Manager for Susquehanna Steam Electric Station Units 1 and 2, performed the subject inspections.

Enclosed are Mr. Thadani's reports for your use.

Enclosure:

As stated cc:

R. Blough F.

Young DISTRIBUTION r~~

NRC PDR Local PDR PDI-2 Reading SVarga WButler MThadani JStone MO'Brien

/s/

Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Previously concurred*

nF~l

[WIGGINS MEMOj PD I-2/PM*

MThadani:mr 12/06/88 PDI-2/D*

WButler 12/06/88 SSi2090202 SSi206'DR ADOCK 05000 37 0

PDC

t 4

~ ~

.MEMORANDUM FOR:

FROM:

SUBJECT:

James T. Wiggins, Chief Reactor Projects Branch No.

2 Division of Reactor Projects, Region I Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PROJECT MANAGER INSPECTIONS PER TI 2515/93 AND 2515/95 On October 25,

1988, Mr. Mohan C. Thadani, NRR Project Manager for Susquehanna Steam Electric Station Units 1 and 2, performed the subject inspections.

Enclosed are Mr. Thadani's reports for your use.

Enclosure:

As stated DISTRIBUTION NRC PDR Local PDR PDI-2 Reading SVarga WButler MThadani JStone MO'Brien Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation t

IGGINS MEMOj I- /PM MThadani:mr I~Id /88 PDI-2/D WButler

~L/( /88

I II c

II, I

I

gy,S REPy P

0O I

f Cp

+~

~O

++*++

e UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 6,

1988 MEMORANDUM FOR:

FROM:

SUBJECT:

James T. Wiggins, Chief Reactor Projects Branch No.

2 Division of Reactor Projects, Region I Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PROJECT MANAGER INSPECTIONS PER TI 2515/93 AND 2515/95 On October 25, 1988, Mr. Mohan C. Thadani, NRR Project Manager for Susquehanna Steam Electric Station Units 1 and 2, performed the subject inspections.

Enclosed are Mr. Thadani's reports for your use.

Enclosure:

As stated Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc:

R. Slough F.

Young

ENCLOSURE TI 2515/93:

INSPECTION FOR VERIFICATION OF QUALITY ASSURANCE REGARDING DIFSEL GENERATOR FUEL OIL

.On October 25,

1988, Mr. Mohan C. Thadani, NRR, PDI-2, reviewed the Susquehanna Steam Electric Station Units 1 and 2 quality assurance program for diesel generator fuel oil.

The licensee's procurement documents indicate that the licensee is correctly specifying that the required fuel oil must meet ASTM specifications D-975 and D2274.

The licensee's Technical Specifications reauire that, at least once per 92 days, the received fuel oil will be tested in accordance with ASTM-0270-1975, ASTM-D975-77 and ASTM-D2274-70.

Although the licensee has adopted the necessary quality assurance program, it is not requiring, and the fuel oil supplier is not providing evidence that the diesel fuel meets all the requirements of ASTM specifications.

This deficiency in the licensee's implementation of quality assurance is documented in the Region I Inspection Report Nos. 50-387/88-18 and 50-388/88-21, dated November 17,

1988, and will be pursued as a separate action by the Region I staff.

The TI 2515/93 can therefore be closed on the basis that the licensee's procurement documents specify the necessary quality requirements, the Technical Specifications provide for verification of diesel fuel oil quality by the licensee in accordance with the applicable ASTM standards, and the implementation deficiencies are being pursued by the Region I staff as a separate action.

TI 2515/95 INSPECTION FOR VERIFICATION OF BWR RECIRCULATION PUMP TRIP INSTALLATION At Susquehanna Steam Electric Station, Units 1 and 2, the ATWS-RPT designs conform to the staff approved standard Montecello design.

The systems were installed in both units during each units construction stage.

The staff approval of the systems was based on the staff's safety evaluation related to compliance with the ATWS Rule 10 CFR 50.62.

On October 25, 1988, Mr. Mohan C. Thadani, NRR, POI-2, verified that Susquehanna Steam Electric Station Units 1 and 2 have the Reactor Recirculation Pump Trip capability required by 10 CFR 50.62.

The pump trip logic is included to permit actuation on either low water level or high reactor vessel pressure.

This is acceptable.