ML17156A496
| ML17156A496 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/28/1988 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17156A497 | List: |
| References | |
| NUDOCS 8804110161 | |
| Download: ML17156A496 (13) | |
Text
(4~R REMI
~4
~o
~c C
O I
l O
Y/+
gO
+~*y4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-387 l
~ 'I
'I h
~l SUSOUEHANNA STEAM ELECTRIC STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
License No.
, Il ~l 1.
The Nuclear Regulatory ComIission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 8
Light Company, dated April 13, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-14 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
76 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in ihe license.
PP8L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
~, l C /
8804110ihi 880328 PDR ADOCK 05000387, P
~
~
l l
'l l
~
~
ll l l
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
March 28, 1988
/s/
Walter R. Butler, Director Project Directorate I-2 Division of, Reactor Projects I/II rien I-2/PM MThadani 9/3/sg'GC PDI-2/D 4'
Loulf~
WButler 3 //p/8f g /~/8f
lt I
h II '
3.
This 1icense amendment is effective as of its.date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technica1 Specifications Date of Issuance:
March 28'988 Wa1ter R. But1er, Director Project Directorate 1-2 Division of Reactor Projects I/II
ATTACHMENT TO LICENSE AMENDMENT NO.
76 FACILITY OPERATING LICENSE NO.
NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
The overleaf page is provided to maintain document completeness.*
REMOVE 3/4 6-33 3/4 6<<34 INSERT 3/4 6.-33*
3/4 6-34
TABLE 3.6.5.2"1 SECONDARY CONTAINMENT VENTILATION SYSTEM AUTOMATIC ISOLATION OAMPERS DAMPER FUNCTION l.
Reactor Building Zone I Supply System Dampers (HD-l7586 A&B)
MAXIMUM ISOLATION TIME Seconds) 7.5 2.
3.
Reactor Building Zone I Filtered Exhaust System Dampers (HD-17524 A&B)
Reactor Building Zone I Unfiltered Exhaust System Dampers (HD-l7576 A&B) 5.0 3.0 4.
Reactor Building Zone II Supply System Dampers (HD-27586 A&B) 5.
Reactor Building Zone II Filtered Exhaust System Dampers (HD-27524 A&B) 6.
Reactor Building Zone II Unfiltered Exhaust System Dampers (HD-27576 A&B) 7.
Reactor Building Zone III 5vpply System Dampers (HD-17564 A&B) 8.
Reactor Builidng Zone III Filtered Exhaust System Dampers (HD-17514 A&B) 9.
Reactor Building Zone III Unfiltered Exhaust System Dampers (HD-17502 A&B) 10.
Reactor Building Zone III-Supply System Dampers (HD-27564 A&B) 11.
Reactor Building Zone III Filtered Exhaust System Dampers (HD-27514 A&B) 12.
Reactor Building Zone III Unfiltered Exhaust System Dampers (HD-27502 A&B) 7.5 5.0 3.0
- 14. 0 6.0
- 14. 0 6.5 6.0 SUS)UEHANNA - UNIT 1 3/4 6-33 Amendment No.
36
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM LIMITING CONDITION FOR OPERATION
- 3. 6. 5. 3 Two independent standby gas treatment subsystems shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, and ".
ACTION:
With one standby gas treatment subsystem inoperable, restore the
~.inoperable subsystem to OPERABLE status within 7 days, or:
l.. In OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
In Operational Condition ", suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS, and operations with a potential for draining the reactor vessel.
The provisions of Specification 3.0.3 are not applicable.
b.
With both standby gas treatment subsystems inoperable:
l.
In OPERATIONAL CONDITION 1, 2, or 3, restore at least one inoperable subsystem to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the, next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in
"'OLD SHUTDOWN within'the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
In Operational Condition ", suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS, and operations with a potential for draining the reactor vessel.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.5.3 Each standby gas treatment subsystem shall be demonstrated OPERABLE:
a."--'At least once per 31 days by initiating,'rom the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the subsystem operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters OPERABLE.
"When irradiated fuel is being handled in the secondary containment and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel.
SUSQUEHANNA - UNIT 1 3/4 6-34 Amendment No. 76'
~S RECy
~'4
~
Po 0O Vl
!/ 3:
0 V/+~
gO
+>>*++
t UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
, PENNSYLVANIA POWER
& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 41 License No.
NPF-22 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
2.
A.
The applica'tion for the amendment filed by the Pennsylvania Power Light Company, dated April 13, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act,.and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the ComIission's regulations set forth in 10 CFR Chapter I;
'I D.
The issuance of this amendment will not'be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the 'Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-22 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 4l and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technica'I Specifications'and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
March 28, 1988
//'S//'alter R. Butler, Director Project Directorate I-2 Division of'eactor Projects I/II I)/$+/7 DI-2/PM MThadani
$/3 /8$
osc 4 ~4'or-z/0 S 4 LeQIJ'Butler 3//f/sf '/~8/
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
Natch 28, 1988 Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
ATTACHMENT TO LICENSE AMENDMENT NO, 41 FACILITY OPERATING LICENSE NO.
NPF-22 DOCKET NO. 50-388 Replace the following pages of.the Appendix A Technical Specifications with enclosed pages.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
The overleaf page is provided to maintain document completeness.*
REMOVE 3/4 6-35 3/4 6-36 INSERT 3/4 6-35*
3/4 6-36
TABLE 3. 6.&2-1 SECONDARY CONTAINMENT VENTILATION SYSTEM AUTOMATIC ISOLATION DAMPERS DAMPER FUNCTION-1.
Reactor Building Zone I Supply System Oampers (HO-17586 AM) 2.
Reactor Building Zone I Filtered Exhaust System Dampers (HD-17524 MB) 3.
Reactor Building Zone I Unfiltered Exhaust System Oampers (HO-17576 MB) 4.
Reactor Building Zone II
. Supply System Dampers (HD-27586 MB) 5.
Reactor Building Zone II Filtered Exhaust System Dampers (HO-27524 MB) 6.
Reactor Building Zone II Unfiltered Exhaust System Dampers (HO-27576 MB) 7.
Reactor Building Zone III Supply System Dampers (HD-17564 MB) 8.
Reactor Building Zone III Filtered Exhaust System Oampers'HO-17514 A88) 9.
Reactor Building Zone III Unfiltered Exhaust System Oampers (HD-17502 A88).
10.
Reactor Building Zone III Supply System Oampers (HD-27564 A88) 11.
Reactor Building Zone, III Filtered Exhaust System Oampers (HO-27514 MB) 12.
Reactor Building Zone III Unfiltered Exhaust System Oampers (HD-27502 MB)
~a MAXIMUM ISOLATION TIME Seconds 7.5 5.0 3.0 7.5 5.0 3.0
- 14. 0 6.5 6.0
- 14. 0 6.5 6.0 SUSQUEHANNA - UNIT 2 3/4 6-35
~
4 ~
I
CONTAINMENT SYSTEM STANDBY GAS TREATMENT SYSTEM.
LIMITING CONDITION FOR OPERATION 3.6.5.3 Two independent standby gas treatment subsystems shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, and ".
ACTION:
a.
With one standby gas treatment subsystem inoperable,'estore the inoperable subsystem to OPERABLE status within 7 days, or:
1.
In OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
In Operational Condition ", suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS, and operations with a potential for draining the reactor vessel.
The provisions of Specification 3.0.3 are not applicable.
b.
With both standby gas treatment subsystems inoperable:
1.
In OPERATIONAL CONDITION 1, 2, or 3, restore at least one inoper-able subsystem to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.;
In Operational Condition
, suspend, handling of irradiated fuel in the secondary containment,.
CORE ALTERATIONS, and operations with.a potential for draining the reactor vessel.
The provisions of Specification 3.0.3 are not applicable.
SURYEILLANCE RE UIREMENTS 4.6.5.3 Each standby gas treatment subsystem shall be demonstrated OPERABLE:
a.
At least once per 31 days by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the subsystem operates for at least,10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters OPERABLE..
"When irradiated fuel is being handled in the secondary containment and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel.
SUS(UEHANNA - UNIT 2 3/4 6-36 Amendment No.
41