ML17156A410

From kanterella
Jump to navigation Jump to search
Rev 1 to Notification of Licensee Meeting 87-045 on 870630 W/Util in King of Prussia,Pa to Discuss Status of Activities & Future Plans
ML17156A410
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/14/1987
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8803010350
Download: ML17156A410 (2)


Text

No.87-045 - Rev.

1 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket Nos.:

Pennsylvania Power and Light Company Susquehanna Steam Electric Station 50-387/50"388 Time and Date of Meeting:

10:00 A.M., June 30, 1987 Location of Meeting:

NRC Region I Main Conference

Room, King of Prussia, PA Purpose of Meeting:

NRC Attendees:

'I Licensee Attendees:

Discuss Status of Activities at Susquehanna and Future Plans W.

F.

Kane, Director, Division of Reactor Projects (DRP W. V. Johnston, Acting Director, Division of Reactor Safety (DRS)

T. T. Martin, Director, Division of Radiation Safety and Safeguards (DRSS)

J.

P. Durr, Chief, Engineering

Branch, DRS R.

R. Bellamy, Chief, Emergency Preparedness and Radiological Protection

Branch, DRSS J.

H. Joyner, Chief, Nuclear Materials Safety and Safeguards

Branch, DRSS J.

T. Wiggins, Chief, Reactor Projects Section 1B, DRP L.

R. Plisco, Senior Resident Inspector, SSES J.

R. Stair, Resident Inspector, SSES B.

D. Kenyon, Senior Vice President - Nuclear H.

W. Keiser, Vice President - Nuclear Operations R.. G. Byram, Superintendent of Plant SSES J.

R.

Miltenberger, Manager - Nuclear Safety Assessment Group C. A. Myers, Manager - Nuclear Plant Engineering W.

E. Barberich, Supervisor of Planning and Licensing Services Note:

Attendance by NRC personnel at this meeting should be made known by June 23; 1987 via telephone call to J. Wiggins, Region I, at FTS 8-488-1128 or 215-337-5128 Prepared by:

J.

iggins ief Reactor Prospects Section 1B ib OFFICIAL RECORD COPY MTG NOTICE 87-045 REV.

1 0001.0.0 05/14/87 8803010350 8705l 4 PDR ADOCK 05000387 P

DCD

Meeting Notice No.87-06S 0/H1 l~'i'istribution:

Victor Stello, Jr.,

Executive Director for Operations James M. Taylor, Deputy Executive Director for Region Operations James G. Partlow, Director, Division of Reactor Inspection 5 Safeguards, NRR J

~ Lieberman, Director, Office of Enforcement T.

E. Murley, Director, Office of Nuclear Reactor Regulation R.

W. Starostecki, Associate Director of Inspection 5 Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactor, NRR S.

Varga, Director, Division of Reactor Projects-I, II, NRR W. Butler, Director, Project Directorate I-2, NRR M. Thadani, Project Manager, PD I-2, NRR B. Clayton, Regional Coordinator, EDO Public Document Room (PDR)

Local Public Document Room ( LPDR) bcc:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Region I Receptionist PAO DRMA files RI: DRP Wiggins/mjd 5/I /87 OFFICIAL RECORD COPY MTG NOTICE 87-04S REV.

1 - 0002.0.0 05/14/87