ML17146B090

From kanterella
Jump to navigation Jump to search
Forwards Application for Proposed Amend 58 to License NPF-22,changing Tech Specs to Support Cycle 3 Reload.Unit Scheduled to Shutdown on 880305 & Restart on 880503.Reload Summary & Transient Analysis Repts Encl.Fee Paid
Date released: 09/18/2017 Download: ML17146B090


Forwards Application for Proposed Amend 58 to License NPF-22,changing Tech Specs to Support Cycle 3 Reload.Unit Scheduled to Shutdown on 880305 & Restart on 880503.Reload Summary & Transient Analysis Repts Encl.Fee Paid
ML18040B194
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/23/1987
From: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
To: BUTLER W R
Office of Nuclear Reactor Regulation
References
Download: ML18040B194 (62)
Cycle 3 Proposed Startup Physics Tests Summary Description.
ML17146B102
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/30/1987
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17146B102 (5)
Application for Proposed Amend 58 to License NPF-22,revising Tech Specs to Support Cycle 3 Reload
ML17146B096
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/23/1987
From: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17146B096 (2)
Rev 1 to Susquehanna Unit 2 Cycle 3 Reload Analysis Design & Safety Analyses.
ML17146B095
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/30/1987
From: Jason White
ADVANCED MEDICAL SYSTEMS, INC.
To:
References
Download: ML17146B095 (47)
Rev 1 to Susquehanna Unit 2 Cycle 3 Plant Transient Analysis.
ML17146B094
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/30/1987
From: Jason White
ADVANCED MEDICAL SYSTEMS, INC.
To:
References
Download: ML17146B094 (60)
Ses Unit 2 Cycle 3 Reload Summary Rept.
ML17146B092
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/31/1987
From: Kulick J, Spadaro J, Stefanko J
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17146B092 (40)
Proposed Tech Specs Index & Sections 3/4.2.1,3/4.2.2, 3/4.2.3,3/4.2.4,3/4.3.6,3/4.4.1,B 2.1,B 3/4.2.1,B 3/4.2.2, B 3/4.2.3 & B 3/4.4.1,to Support Cycle 3 Reload
ML17146B089
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/23/1987
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17146B089 (2)