~g% IljgI
'o ly OO C
Vh
/y +lkt+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 5 LIGHT COMPANY
- ALLEGHENY ELECTP.IC COOPERATIVE, INC.
DOCKET NO. 50-387
,SUS UEHANNA STEAM ELECTRIC STATION UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 74 License No.
NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 5
Light Company, dated June 10,
- 1987, as supplemented by letters dated September I and September 24, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the COIIWIission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Cmmission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the coImon defense and security or to the health and safety of the public; and E.
The'issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
74 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PPSL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
]
87ii23034i'"87iiOb
'[
PDR ADOCK 05000387 p
"'DR
j a
f i
3.
This license amendment is effective upon startup for Unit I Cycle 4 operation.
FOR THE NUCLEAR REGULATORY CONNISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
november 6, 1987 Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II n
gQ 87 PDI-2/PN NTha4ani:ca P /gb/87
~y /q//87 PDI-2/D WBu ler i'l/
/87
0 I g I1
2 3.
This license amendment is effectiv operation.
e ective upon startup for Unit I Cycle 4
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 6p 1987 Walter R. Butl r, Director Project Directorate I-2 Division of Reactor Projects Ilii
ATTACHMENT TO LICENSE AMENDMENT NO.
74 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO.
50-387 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by Amendment nUmber and contains vertical lines indicating the areas of change.
REMOVE 3/4 8-12 INSERT 3/4 8-12
ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued c.
At 2.
3.
least once per 18 months by verifying that:
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material, The resistance of each cell-to-cell and terminal connection of each 125-volt and 250-volt battery is less than or equal to 150 x 10-6
- ohm, and The battery charger, for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, will supply at least:
a)
For the
+ 24-volt batteries, 25 amperes at a minimum of 25.7 volts.
b)
For the 125-volt batteries, 100 amperes at a minimum of 127.8 volts.
c)
For the 250-volt batteries, 300 amperes at a minimum of 255.6 volts')
For the 125-volt diesel generator E batteries, 200 amperes at a minimum of 127.8 volts.
d.
At least once per 18 months by verifying that either:
1.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for the design duty cycle when the battery is subjected to a battery service
- test, or 2.
The battery capacity is adequate to supply a
dummy load of the following profile, which is verified to be greater than the actual emergency loads, while maintaining the battery terminal voltage greater than or equal,to
+ 21, 105 or 210 volts, as appl icabl e.
a}
For + 24-volt battery banks 10670, 10670-1, 10680 and 1D680-1, 9.37 amperes for the entire 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test.
b)
For 125-volt batteries:
1)
Channel A battery 1D612:
343 amperes for 60 seconds 114 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 2)
Channel "B" battery 1D622:
344 amperes for 60 seconds 116 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 3)
Channel "C" battery lD632:
318 amperes for 60 seconds 100 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 4)
Channel "D" battery 1D642:
336 amperes for 60 seconds 117 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test.
SUS(UEHANNA - UNIT 1 3/4 8-12 Amendment No. 74
~
~
I
~gR RECy
~4 0
4 n0 I
~ r a
+
~
0 4~~~ 4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 PENNSYLVANIA POWER 8I LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-388 SUSQUEHANNA STEAN ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
40 License No.
NPF-22 1.
The Nuclear Regulatory Comissfon (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 5
Light Company, dated June 10,
- 1987, as supplemented by letters dated September 1 and September 24, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
C.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; There is reasnnable assurance:
(i) that the activities authorized by thfs amendment can be conducted without endangering the health and safety of the public, and (fi) that such activitfes will be conducted in compliance with the ComIissfon's regulations set forth fn 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the co@eon defense and security or to the health and safety of the public; and E.
The issuance of this amendment fs fn accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specffica-tfons as indicated fn the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:
(2)
Technical S ecfficatfons and Environmental Protection Plan The Technical Specifications contafned fn Appendix A, as revised through Amendment No. 40 and the Environmental Protection Plan contafned fn Appendix B, are hereby incorporated fn the license.
PP8L shall operate the facility fn accordance with the Technical Specifications and the Environmental Protection Plan.
I 3.
This license amendment is effective upon Unit I startup for Cycle 4 operation.
1 FOR THE NUCLEAR REGULATORY"COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 6I 1987
/s/
Walter -R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II 87 DI-2/PM MThadani:ca Iy /%(/87 yy/+/87 PDI-2/D WButler
[l/6/87
p 1'
2 3.
This license amendment is effective upor Unit I startup for Cycle 4
operation.
FOR THE NUCLEAP. REGULATORY COMMISSIO>!
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 6, 3997 Walter RE Butle
, Director Project Directorate I-2 Division of Reactor Projects I/II
ATTACHMENT TO LICENSE AMENDMENT NO ~
40 FACILITY OPERATINA LICENSE NO.
NPF-22 DOCKET NO. 50-388 Replace the following pages nf the Appendix A Technical Specifications with enclosed pages.
The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
The overleaf page is provided to maintain document completeness.*
REMOVE 3/4 8-13 3/4 8-13a>>
INSERT 3/4 8-13 3/4 8-13a*
~
~
ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued c
~
At least once per 18 months by verifying that:
1.
The cells, cell plates, and battery racks show no visual indica-tion of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, free of corrosion, and coated with anticorrosion material, 3.
The resistance of each cell-to-cell and terminal connection of each 125-volt and 250-volt battery is less than or equal to 150 x 10-e
- ohm, and 4.
The battery charger, for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, will supply at least:
a)
For the + 24-volt batteries, 25 amperes at a minimum of 25.7 volts.
b) c)
For the 125-volt batteries, 100 amperes at a minimum of 127.8 volts.
For the 250-volt batteries, 300 amperes at a minimum of 255 '
volts')
For the 125 volt generator E batteries, 200 amperes at a
minimum of 127.8 volts d.
At least once per 18 months by verifying that either:
1.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for the design duty cycle when the battery is subjected to a battery service
- test, or 2.
The battery capacity is adequate to supply a
dummy load of the following profile, which is verified to be greater than the actual emergency loads, while maintaining the battery terminal voltage greater than or equal to + 21, 105 or 210 volts, as applicable.
a)
For + 24-volt battery banks 2D670, 2D670-1,
- 2D680, and 2D680-1, 9.37 amperes for the entire 4-hour test.
b)
For 125-volt batteries:
1)
Channel "A" battery 1D612:
343 amperes for 60 seconds 114 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 2)
Channel "B" battery 1D622:
344 amperes for 60 seconds 116 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 3)
Channel "C" battery 1D632:
318 amperes for 60 seconds 100 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 4)
Channel "D" battery 10642:
336 amperes for 60 seconds 117 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test.
5)
Channel "A" battery 2D612:
328 amperes for 60 seconds 112 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 6)
Channel "B" battery 2D622:
326 amperes for 60 seconds 110 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test SUSQUEHANNA " UNIT 2 3/4 8-13 Amendment No. 40
ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS Continued e.
7)
Channel "C" battery 2D632:
343 amperes for 60 seconds 128 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 8)
Channel "D" battery 20642:
326 amperes for 60 seconds 111 amperes for the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test 9)
Channel "H" battery OD595:
286 amperes for the first 60 seconds, 95 amperes for the next 238 minutes, 155 amperes for the last minute of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test.
, c)
For 250-volt batteries:
1)
Battery bank 20650:
458 amperes for 60 seconds 251 amperes for 239 minutes 2)
Battery bank 2D660:
1119 amperes for 60 seconds 244 amperes for 239 minutes At least once per 60 months by verifying that the battery. capacity is at least 8(C of the manufacturer's rating when subjected to a per-formance discharge test.
Once per 60-month interval, this performance discharge test may be performed in lieu of the battery service test.
Annual performance discharge tests of battery capacity shall be given to any battery that shows signs of degradation or has reached 85K of the service life expected for the application.
Degradation is indicated when the battery capacity drops more than lOX of rated capacity from its average on previous performance tests, or is below 90K of the manufacturer's rating.
SUS(UEHANNA - UNIT 2 3/4 8-13a Amendment No. 32
~ p i~ >~'