ML17146A932

From kanterella
Jump to navigation Jump to search
Corrected Amends 69 & 38 to Licenses NPF-14 & NPF-22, Respectively,Revising Tech Spec Re Sodium Pentaborate Concentration in Standby Liquid Control Sys
ML17146A932
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/25/1987
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17146A931 List:
References
NUDOCS 8709080445
Download: ML17146A932 (17)


Text

4 C

~

0

~

~4 gp

" Cgp~

O~c o

+~

~

~O

+a+*+

UNITED STATES

"' NUCLEAR REGULATORY COMMISSION

. WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NO. 50-387 SUS UEHANNA STEAN ELECTRIC STATION, UNIT 1 "AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 69 License No.

NPF-14 1.

The Nuclear Regulatory'Comission (the CoIINIission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power 5

Light Company, dated April 8, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.

There is reasonable assurance:

{i) that the activities authorized by this amendment can be conducted without endangering the health and safety of, the.public, and (ii) that such activities will be conducted in compliance with the CoIINIissioTI!s regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the comon defense and security or. to'he health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the COIIWIission's regulations and all-applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License. No. NPF-14 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 69 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PPSL shall operate the facility in accordance with the Technical

'Specifications and the Environmental. Protection Plan.

W 8709080445 870908 PDR ADOCK 05000387' PORE

~ 0 E

~ 0 0

~

l I

3.

This license amendment is effective upon startup for Cvcle 4 operation.

FOR THE NUCLEAR REGULATORY COMMISSION Malter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/11

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 25, 19S7

~ l 0 ~

1

ATTACHMENT TO LICENSE AMENDMENT NO, 69 FACILITY OPERATING LICENSE NO.

NPF-14 DOCKET NO. 50-387 Replace the following page of the Appendix A Technical Specifications with enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

The overleaf page is provided to maintain document completeness.*

REMOVE 3/4 1-21*

3/4 1-22 INSERT 3/4 1-21*

3/4 1-22

11)0 OPERATXNG MWGB j20 OPBRATIHQ LIHIT 80 dl 60 20 25 Con2entration, X By Weight SODIUM PENTABORATE SOLUTION TEMPERATURE/CONCENTRATION REQUIREMENTS Figure 3.1.5-1

Vl V1 A3 cn 15.8,4587 C

1i g

13 a

12 13A low f.evel Alarm Region of Approved Volume - Concentration 12.6, 4910 Mlnlmum Requlced Concentration line Macgln Overllow Volume 12.0. 6160 4700 4800 l900 Net Tanh Vohime losgonel 0

FIGURE 3.1.5-2 SODIUM PENTAOORATE SOLUTION CONCENTRATION.

3.

This license amendment is effective upon startup for Cycle 4 operation of

-Unit l.

'FOR',THE NUCLEAR REGULATQRY COMMISSION

Attachment:

Charges to the Technica1 Specificatinns Date of Issuance:

August 25, 29G7

/s/

Walter R. Butler, Director Project Directorate I-2

':: Division of Reactor Proiects I/II gQ 87 M hadani:ca

//f/87

/87 PDI-2/D Butler

/gJ87

~ 0

~ ~

~-

gg% Slag

'o D Q

" UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON,D. C. 20555 PENNSYLYANIA POMFR 8 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATJYE INC.

DOCKET NO. 50-388 SUS UEHANNA STEAI4 ELECTRIC STATION UNIT 2 AMENDMENT TO FACIL'ITY OPERATING LICENSE

... Amendment No. 38

License No.

NPF-. 22 1.

The Nuclear Regulatory ComIission (the Conrnission'r the NRC) having found that:

A.

The appl~cation for the amendment filed by the Pennsylvania Power 5

Light Company, dated April 8, 1987, complies with the standards and requirements o~ the Atomic Energy Act of 1954, as amended

{the Act),

and the Comnission's regulations set forth in IO CFR Chapter I; B.

The facility will operate fn conformity with the application, the provisions of the Act, and the regulations of the Comission; C.

There is reasonable'ssurance:

(i). that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the.Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the'omon defense and security nr to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Conmission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(?) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

.38 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PPKL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

~ ~

~ ~

3.

1his license amendment is effective upon startup for Cvcle 4 operation nf Unit l.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 25;89S7 Walter R. Butle~, Director Proiect Directorate I-2 Division of Reactor Projects I/II

~

~

ATTACHMENT"TO LICENSE AMENDMENT NO. 38 FACILITY OPERATING LICENSE NO.

NPF-22 DOCKET NO. 50-388 Replace the following page of the Appendix A Technical Specifications with enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

The overleaf page is provided to mair tain document completeness.*

REMOVE 3/4 1-21*

3/4 1-22 INSERT 3/4 1-21*

3/4 1-22

0 0

~ ~

~

~

~ ~

140 130 OPERATING RANGE 110 OPERATING LIMIT 80 70 10 15 20 25 30 35 40 Concentration,

% By Weight SODIUM PENTABORATE SOLUTION TEMPERATURE/CONCENTRATION REQUIREMENTS FIGURE 3.1.5-1

.8, f4 15 4587 Low level Alarm Aeglon of Approved Volume - Concenlretlon 12.8, 1910 Margin Overflow Volume 12 Mlnlmum Required Concentration Line 12.0, 6150 4500 4700 4800 4800 Net Tank Volun~e loslloni) 6100 FICiURE 3.1.5-2 SODIUH PENTMOINTE SOLUT ION CONCENTINT ION