MONTHYEARML16102A0972016-03-14014 March 2016 Report on Decommissioning Funding Status Project stage: Request ML17142A0832016-05-20020 May 2016 Letter to R. Weisenmiller Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Rancho Seco Independent Spent Fuel Storage Installation Decommissioning Funding Plan (ML16147A028-RLSO) Project stage: Draft Approval 2016-03-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML23137A1442023-05-0303 May 2023 Sacramento Municipal Utility District (Smud) - Submittal of 2022 Annual Financial Report ML23115A1722023-03-27027 March 2023 Sacramento Municipal Utility District (Smud), Rancho Seco Report on Financial Assurance Status ML23040A0582023-01-31031 January 2023 Annual Radiological Environmental Operating Report for the Period of January 1, 2022, Through December 31, 2022 ML22203A0552022-06-30030 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update ML22200A0272022-06-29029 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report, Revision 10 ML22158A2262022-05-25025 May 2022 Smud, Rancho Seco Independent Spent Fuel Storage Installation Biennial 10 CFR 72.48(d)(2) Report ML22125A0972022-04-20020 April 2022 Independent Spent Fuel Storage Installation - 2021 Annual Financial Report IR 07200011/20214012021-12-14014 December 2021 Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200011/2021401 ML21342A1882021-12-13013 December 2021 Safety Evaluation Report (SER) for the Sacramento Municipal Utility District (Smud) Rancho Seco Quality Manual Revision 5 ML21230A2692021-08-0202 August 2021 Smud, Revised Rancho Seco Quality Manual Request for Approval ML21195A3262021-06-30030 June 2021 Independent Spent Fuel Storage Installation - 2020 Annual Financial Report ML21050A3212021-05-18018 May 2021 the Nuclear Regulatory Commission'S Analysis of Sacramento Municipal Utility District'S Initial and Updated Decommissioning Funding Plans for Rancho Seco Nuclear Generating Station'S Independent Spent Fuel Storage Installation ML21140A3632021-04-20020 April 2021 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2020 IR 07200011/20210012021-03-25025 March 2021 Independent Spent Fuel Storage Installation - NRC Inspection Report 07200011/2021-001 ML21131A0962021-03-24024 March 2021 Submittal of Rancho Seco Independent Spent Fuel Storage Installation 10 CFR 73.71 Safeguards Event 55085 60-Day Report ML20342A1942020-09-23023 September 2020 Report of Changes to the Physical Protection Plan (Amendment 9) Transmittal Letter ML20206K9582020-06-29029 June 2020 ISFSI Final Analysis Report, Revision 9 ML20108F5662020-03-31031 March 2020 Report on Financial Assurance Status ML20108F5332020-03-30030 March 2020 Annual Report of Property Insurance Levels ML20066L4962020-03-10010 March 2020 Letter to D. Tallman Final Environmental Assessment for the License Renewal of the U.S. NRC License No.: SNM-2510 for Rancho Seco ISFSI (Dkt No. 72-0011) ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter ML20044F6012020-02-24024 February 2020 ISFSI Renewal Proprietary Determination Letter for RAI Clarification Submittal 7-12-19 ML19280B7632019-09-30030 September 2019 Letter to D. Tallman Nuclear Regulatory Commission Approval If Sacramento Municipal Utility District Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI IR 07200011/20194012019-09-16016 September 2019 Rancho Seco Independent Spent Fuel Storage Installation, Revised Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19206A5872019-07-25025 July 2019 Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19168A0582019-06-13013 June 2019 Letter to D. Tallman Request for Clarification of Response to Additional Information for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosure) ML19070A0722019-06-12012 June 2019 Letter to Transmit Draft Rancho Seco ISFSI EA to State of California (Publically Available) ML19025A0822019-01-10010 January 2019 Rancho Seco Nuclear Generating Station - Report of Changes to the Rancho Seco Quality Assurance Program That Do Not Require Prior NRC Approval ML18341A2792019-01-0909 January 2019 Letter to Chairperson of Buena Vista Rancheria of Me-Wuk Indians of California - Tribal Consultation Letter and Enclosure ML19009A4232019-01-0909 January 2019 Letter to Chairman of Colfax-Todds Valley Consolidated Tribe - Tribal Consultation Letter and Enclosure ML19009A4242019-01-0909 January 2019 Letter to Chairperson of Tsi Akim Maidu Tribe - Tribal Consultation Letter and Enclosure ML19009A4252019-01-0909 January 2019 Letter to Chairperson of Ione Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4262019-01-0909 January 2019 Letter to Chairperson of the Nashville Enterprise Miwok-Maidu-Nishinam Tribe - Tribal Consultation Letter and Enclosure ML19009A4272019-01-0909 January 2019 Letter to Chairperson of the United Auburn Indian Community of the Auburn Rancheria - Tribal Consultation Letter and Enclosure ML19009A4282019-01-0909 January 2019 Letter to the Chairperson of the Shingle Springs Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4292019-01-0909 January 2019 Letter to the Chairperson of the Wilton Rancheria - Tribal Consultation Letter and Enclosure ML18324A8222018-12-14014 December 2018 Letter to Mr. Kevin Thomas, Acting Regional Manager; Re., Rancho Seco - California Fish and Wildlife Consultation Letter and Enclosure ML18325A0422018-12-14014 December 2018 California Shpo Consultation Letter to J. Polanco and Enclosure ML18302A1582018-11-28028 November 2018 Revised Letter for Termination of Rancho Seco Nuclear Generating Station Operating License DPR-54 and Indemnity Agreement ML18325A1422018-11-20020 November 2018 Letter to D. Tallman Request for Additional Information for Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0 ML18285A3812018-09-26026 September 2018 Transmittal of Response to Request for Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spend Fuel Storage Installation ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) 2023-05-03
[Table view] |
Text
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 20, 2016 State Liaison Officer Robert Weisenmiller, Chairman California Energy Commission 1516 Ninth Street Sacramento, CA 95814
SUBJECT:
REVIEW OF THE DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT FOR THE RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION DECOMMISSIONING FUNDING PLAN
Dear Mr. Weisenmiller:
By letters dated March 14, 2013, and March 23, 2015, Sacramento Municipal Utility District (SMUD) submitted decommissioning funding plans (DFP) for the Rancho Seco Independent Spent Fuel Storage Installation (ISFSI), located in California, for the U.S. Nuclear Regulatory Commission (NRC) staff review and approval.
The NRC regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste, govern the storage of spent nuclear fuel (spent fuel) generated at commercial nuclear power reactors licensed by the NRC. Spent fuel that has been removed from the reactors spent fuel pool is typically stored at a nuclear power plants ISFSI.
The NRC requires its licensees to plan for the eventual decommissioning of their licensed facilities prior to license termination. On June 17, 2011, the NRC published a final rule amending its decommissioning planning regulations (76 Federal Register (FR) 35512). The final rule amended the NRC regulation, 10 CFR 72.30, which concerns financial assurance and decommissioning for ISFSIs. This regulation now requires each holder of, or applicant for, a license under 10 CFR Part 72 to submit, for NRC review and approval, a DFP. The purpose of the DFP is to demonstrate the licensees financial assurance, i.e., that funds will be available to decommission the ISFSI. The NRC staff is reviewing the information submitted by SMUD, Specifically, the NRC must determine whether SMUD DFP contains the information required by 10 CFR 72.30(b) and 10 CFR 72.30 (c) Tri-Annual Update and whether SMUD has provided reasonable assurance that funds will be available to decommission the ISFSI.
The Rancho Seco ISFSI DFP is publicly available in the NRCs Agencywide Documents Access and Management System (ADAMS) accessible at http://www.nrc.gov/reading-rm/adams.html.
The ADAMS accession number for the application package is ML13098A100 for the 2012 submittal and ML15093A058 and ML16102A097 for the 2015 submittals.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
R. Weisenmiller In accordance with 10 CFR Part 51, the NRC regulations that implement the National Environmental Policy Act of 1969, as amended, the agency has prepared a draft environmental assessment (EA) for the proposed action (enclosed). We are providing your office with the opportunity to review the draft EA and comment on environmental issues prior to the public issuance and publication of the EA. We request that distribution and use of the enclosed draft EA be limited only to those staff involved in the review and comment process.
Please submit any comments within 30 days of the receipt of this letter to the U.S. Nuclear Regulatory Commission, Document Control Desk, ATTN: Steve Ruffin, Mail Stop:
TWFN 4E-04, U.S. Nuclear Regulatory Commission, Washington, DC 20555. If you have any questions, please contact Mr. Richard Baum of my staff by telephone at 301-415-0018, or by e-mail at richard.baum@nrc.gov. The NRC staff will consider your timely comments and will revise the EA, as appropriate, before its final issuance and publication. Thank you for your assistance.
Sincerely,
/RA/
Steve Ruffin, Acting Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-11 CAC No.: L24816
Enclosure:
Draft Environmental Assessment PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE .
THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
R. Weisenmiller In accordance with 10 CFR Part 51, the NRC regulations that implement the National Environmental Policy Act of 1969, as amended, the agency has prepared a draft environmental assessment (EA) for the proposed action (enclosed). We are providing your office with the opportunity to review the draft EA and comment on environmental issues prior to the public issuance and publication of the EA. We request that distribution and use of the enclosed draft EA be limited only to those staff involved in the review and comment process.
Please submit any comments within 30 days of the receipt of this letter to the U.S. Nuclear Regulatory Commission, Document Control Desk, ATTN: Steve Ruffin, Mail Stop:
TWFN 4E-04, U.S. Nuclear Regulatory Commission, Washington, DC 20555. If you have any questions, please contact Mr. Richard Baum of my staff by telephone at 301-415-0018, or by e-mail at richard.baum@nrc.gov. The NRC staff will consider your timely comments and will revise the EA, as appropriate, before its final issuance and publication. Thank you for your assistance.
Sincerely,
/RA/
Steve Ruffin, Acting Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-11 CAC No.: L24816
Enclosure:
Draft Environmental Assessment G:SFST\72.30 Decommissioning Funding Plans\2015 Submission Part 70.30 (c)\Rancho Seco DFP Consultation Letter to State.docx G:SFST\72.30 Decommissioning Funding Plans\2015 Submission Part 70.30 (c)\Rancho Seco Draft EA for Consultation.docx ADAMS P8 Accession No.: ML16147A017 Letter: ML16147A028
Enclosure:
ML16147A032 OFC DSFM DSFM DSFM DSFM NAME RBaum WWheatley SRuffin DATE 4/15/16 4/2616 5/20/16 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE .
THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.